Battle: Dar es Salaam vs Nairobi

Konza City is now connected to a 400KV transmission line. Manufacturing and other operations can begin.

View attachment 3610350

View attachment 3610351

View attachment 3610352

2nd biggest city in bongoslum na hata haina stable power in 2026. πŸ˜‚ πŸ˜‚ πŸ˜‚ πŸ˜‚

Mwanza is not currently connected to an active 400 kV line, but it is a major focal point in Tanzania's grid expansion. [1]
The city is slated to be connected to the grid through the Lake Victoria Ring Project, which features a high-voltage 400 kV line running from Masaka (Uganda) to Mutukula, Kyaka, Nyakanazi, and Mwanza. [1, 2]
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…