Cost comparison SGR Kenya vs SGR Tanzania

still pushing a wheel chair up the ramp for someone disabled is a hill task!
 
Nairobi - Nanyuki (approx 200km) MGR rehabilitation begins in earnest!




 
still pushing a wheel chair up the ramp for someone disabled is a hill task!
Thats not a real reason!
And besides, wheelchair ramps are not just built blindly, there are specific calculations and standards

 
Thats not a real reason!
And besides, wheelchair ramps are not just built blindly, there are specific calculations and standards

U talk of standards as if the Chinese keep their promise! Haven't u learned till now?
 
U talk of standards as if the Chinese keep their promise! Haven't u learned till now?
Can you tell me what was in the ESIA and feasibility report, including the standards, in the Kenyan SGR that was not implemented ?
 
Meanwhile [emoji116][emoji116][emoji3][emoji3]

 
View attachment 1378744


Sent from my iPhone using JamiiForums

Mtu anieleze kama mtu wa kawaida, wasafiri watapumzika wapi katika stesheni hii! Ata watu ishirini watatosha humo ndani? Mnatumia $3.1b na wasafiri hawawezi kaa chini wakisubiri. Wale passengers wameonyeshwa pale mbeleni wakiwa Suswa station wakija hii station watasema nini?
 

SGR: Exim Bank rejects Uganda loan request again

SATURDAY MARCH 7 2020


President Uhuru Kenyatta flagging off Kenya’s SGR phase 2A from Nairobi to Suswa on October 16, 2019 that was to terminate in Kisumu. FILE PHOTO | NMG

In Summary
  • Exim Bank insists there must be clarification on whether Kenya’s SGR will terminate at the border to guarantee smooth connectivity.
  • Uganda re-submitted the loan application after changing the scope of works and revising the cost for the 273km project reduced by $26 million to $2.269 billion.
  • Uganda is keen to have SGR connection with Bukasa Port on Lake Victoria as this provides another route and option to transport imports and exports by ship and rail through Tanzania or Kenya.

By JULIUS BARIGABA
More by this Author

China’s Exim Bank has once again rejected Uganda’s fresh application for a standard gauge railway loan, indicating a longer wait for Kampala’s dream of realising a modern transit system.

Exim Bank, in a response to Uganda’s application for financing re-submitted in September last year, insists there must be clarification on whether Kenya’s SGR will terminate at the border to guarantee smooth connectivity.

The Chinese responded to Kampala’s request in January this year.

Uganda re-submitted the loan application after changing the scope of works and revising the cost for the 273km project reduced by $26 million to $2.269 billion.

“The China Exim Bank has responded and sought clarification on the connectivity of Uganda SGR and Kenya SGR since Kenya has slowed down on the progress. Discussions are going on at a high level between Kenya and Uganda to agree on new timelines,” project co-ordinator, Perez Wamburu said.

Diplomatic ties
Kenya’s High Commissioner to Uganda, Kiema Kilonzo, said Nairobi remains committed to the project.

“Both Presidents Yoweri Museveni and Uhuru Kenyatta are keen to see the SGR running smoothly from Mombasa to Kampala, the only thing is that this will be achieved in stages. One of the things I did last year was to organise a state visit for President Museveni to Kenya and President Uhuru has also visited Uganda. Discussions are going on at a high level and right now the technical teams are engaging,” Mr Kilonzo added.

President Museveni in June last year, travelled to China accompanied by Kenya’s Cabinet Secretary for Transport James Macharia, in an indication that the two governments are working together to deliver the multi-billion-dollar infrastructure project.

“So there is no doubt about Kenya’s commitment to see that all the sections are done but the priority is now the leg between Naivasha and Kisumu. Kenya is in advanced stages of negotiations [to secure financing],” Mr Kilonzo said in an interview last week.

The Uganda government and the SGR engineering procurement and construction contractor China Harbour Engineering Company last year reviewed the contract signed in March 2015 and slashed the project cost by an initial $120 million.

However, after negotiating the price down, the Uganda government revised the scope of the project works to include a railway spur to Bukasa Port as well as fencing of the whole SGR line from Malaba to Kampala, at a cost of $94 million.

Because of these changes, Uganda needed to resubmit its application to Exim Bank, seeking an 85-15 per cent financing split between the Chinese lender and the government of Uganda.

SGR: Exim Bank rejects Uganda loan request again

MY TAKE
Ndoto za SGR Kenya kufika Kampala bado zipo?

CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096
 
Ni pale ndoto zinapogeuks kuwa jinamizi...
Sent using Jamii Forums mobile app
 

SGR ya Isaka-Mwanza, serikali ijitoe muhanga kuigharamia yenyewe ujenz wa hio reli (ili kuishawishi uganda wajenge yao ya kuja bongo).... tukisubiri mambo ya mkopo.. wakenya from no where watakuja kupata hela/mkopo kumalizia reli yao

Isaka-Mwanza si almost 220km.. hapa nadhan 1.5trillions ya ujenz inatosha (pls wakenya hizo km na gharama sina uhakika nazo, msije mkanishambulia hapo [emoji1])
 
Wazo zuri,

ICYMI, kipande cha SGR watakachotakiwa kujenga Uganda haizidi hata km 15. Maana watatakiwa kuunganisha Kampala to Port Bell, toka pale kitu kitaingia ndani ya Meli to Mwanza then kitaendelea hadi Bandari Salaama kwa spidi ya light ...

JPM ameshatoa maagizo ya kujenga wagon ferry mpya itakayo accommodate SGR track.
Sent using Jamii Forums mobile app
 