The best 007
JF-Expert Member
- Oct 6, 2019
- 41,015
- 93,277
It seems a little bit complicated to u kenyans but the answer is our Giant country has enough money to finance all the projects at the same time, don't compare.pso you moved to phase 2 without completing phase 1?
What next ,you move to the rwandan border and build a 40 km stretch while leaving phase 1 and 2 incomplete?
You guys are pure unadulterated cornucopia of confusion and stupid combined.
Its real crazy to talk with from kunya bcause they are both dumb n stupidy at the sametime....hey yooh noncompoop...deal with your level....y will never ever compare electric train with diesel trush from chinese .....shut up n deal with it...[emoji582][emoji582][emoji582][emoji1241][emoji1787][emoji1787][emoji1787]where is the electric train? You do not have it and not even thought of buying them.
Where is the track? It is not complete and stuck in the first 200 km meaning you have only 120 km of metal on the ground.
Incase you did not understand let me pump it into your sewer rat Tanzanian IQ.
Your sgr does not exist.
No electric trains, No power and an incomplete track.
You have not finished the first 200 km, for God's sake even a toddler will see you are a complete moron for comparing your hopeless project to an operational modern service.
Tanzanians truly you are the idiots of east africa.
Dont show him nothing b'cause it out of there vision....he just see maruani[emoji1787][emoji1787][emoji1787][emoji1787][emoji1241] for better E Africa...So u want to tell us this will be the pass for cars, u Kenyans are very fuckin people the world has never seen[emoji116][emoji116]View attachment 1477154
Even if it delayed for a year its electric you nincompoop so mind your level to deal with...we dont talk diesel...so why dont you discus your esiriaraa with our Mgr....at list we can listern your concern[emoji4][emoji4]The first 200 km has a delay over 1 year and it seems all construction has slowed. You have not even procured trains. The contractor wants to import steel since your ony steel company went bankrupt while supplying your project, but your government will not let it import.
Forget the trains just enough power to power the trains is not there and you are depending on another pipe dream dam.
You have not even started the process of buying trains. Your train stations are not yet complete
All this delay and it is only 200 km, Kenya took 3 years to build 485 km and 200 km is a problem to Tanzania.
Pipelines have stalled and the project is now in limbo.You are now begging everybody to forgive your debts
Get your house in order first before you compare yourselves to the third largest economy in sub saharan africa.
77%Complete n it was may update ,this is June dudeQuestion: Is phase 1 (200 km) completed?
Answer: No, but it has been between 60% and 70% since june last year.
Question: Do you already have the trains procured?
Answer: No.
Question: When was phase 1 supposed to begin operations?
Answer: Last year november.
Question:When do you expect to get phase 1 of 200 km complete?
Answer: We do not know but we are now at 70% complete.
Question: Wait you said 70% in October, November and December last year and again in March this year does it mean you are stuck?
Answer : (Cricket sounds)
View attachment 1477181
Do not compare the time of completion btn ur diesel sgr and Tz electric sgr, u have never built electric railways, just compare ur sgr to our mgr because they are the same.
Usiwe na wasi dada itakamilika tu, ss inajengwa ili iweje km co kukamilika.Ukweli na usemwe SGR Tanzania ujenzi wake uko taratibu mno ata kama ni ya kisasa sio kwa speed hiyo ya ujenzi. Kumbukeni na sisi tu nataka kuona ukikamilika tuanze kuutumia. Huo ni ukweli
Ukweli na usemwe SGR Tanzania ujenzi wake uko taratibu mno ata kama ni ya kisasa sio kwa speed hiyo ya ujenzi. Kumbukeni na sisi tu nataka kuona ukikamilika tuanze kuutumia. Huo ni ukweli
Hakuna lolote limegeuka kutoka kwa wakenya hapa JF, labda ni wewe ndo finally umeanza kuelewa wakenyaCku nyngne mcpolewa chang'aa huwa mnaongea point sn, btw umeeleweka mkuu, naona cku hz mna adabu kdg kwa Tz [emoji122][emoji122]
My friend, Kabla bajeti isomwe hua kunakua na vikao vya bunge ambavyo kila department na wizara huenda kujibu maswali na kujitetea kwanini wanafaa waongezwe hela ...nkla sivyo kwenda mbele hawata bajetiwa hela zengine hadi wamalize pending bills zote..
Duniani hakuna kitu cha upuuzi kama huu. Wizara haiwezi kukosa hela kisa haijaclear bills za reli or other things like water, electricity or whatever! Hayo ni maneno tu hayana mbele wala nyuma!
simple tu, mishahara nayo si sehem ya budget za wizara? now think again about what you have written!
Usiwe na wasi dada itakamilika tu, ss inajengwa ili iweje km co kukamilika.
$1.2 Million For Ethiopia-Sudan Railway Study By The AfDB.
10th June 2020 Godfrey Ivudria0 Comments
The two-year, comprehensive feasibility study will assess the proposed project’s technical, economic, environmental and social viability
ABIDJAN, Ivory Coast, June 9, 2020/ — The African Development Bank’s Board of Directors has approved a $1.2 million grant to Ethiopia’s government to finance a feasibility study for construction of a standard-gauge railway (SGR) link between Ethiopia and neighbouring Sudan.
The grant, from the African Development Fund, the Bank Group’s concessional-rate lending arm, would cover 35% of the total estimated $3.4 million cost of the study. The remaining funding will be provided by the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) in the form of a $2-million grant, and by a contribution of $100,000 each from the two countries involved. The financing was approved in January.
The two-year, comprehensive feasibility study will assess the proposed project’s technical, economic, environmental and social viability, as well as alternative financing arrangements, including a public-private partnership (PPP).
The railway line will link Addis Ababa in Ethiopia to Khartoum in Sudan, with an extension to Port Sudan on the Red Sea. The route, agreed by both governments, stretches 1,522 kilometres between Addis Ababa and Port Sudan.
According to the document presented to directors of the African Development Fund, the absence of a regional arterial route linking Ethiopia, Sudan and other countries in the Horn of Africa is a brake on trade, development and regional integration. The movement of goods and people between Sudan and Ethiopia often requires the use of several modes of transport, which increases costs and lengthens journey times.
The feasibility study’s findings will be keenly awaited because its implementation would benefit a large proportion of Ethiopia’s 110 million people and 43 million inhabitants of Sudan, as well as populations in the wider region.
The proposed project is aligned with the Bank’s Country Strategy Paper 2016-2020 for Ethiopia. It is also consistent with the long-term development goals of the Sudanese Government, as set out in its national 25-year strategy (2007-2031). It also accords with the Bank’s Ten-Year Strategy 2013-2022 and the operational priority of infrastructure development. The proposed project also would satisfy four of the Bank’s High 5 strategic priorities: Integrate Africa, Feed Africa, Industrialize Africa, and Improve the Quality of Life for the People of Africa.
$1.2 million for Ethiopia-Sudan railway study by the AfDB. - East African Business Week
Hahahaa!!hakuna reli ya umeme jomba, tanzania inajenga reli wala haijengi treni..Do not compare the time of completion btn ur diesel sgr and Tz electric sgr, u have never built electric railways, just compare ur sgr to our mgr because they are the same.
Naona mnapumbaza tu humu[emoji1787][emoji1787]Jibu zuri sana hili,
Anajaribu kucompare Bombardier talent 3 na mitungi ya changaa [emoji23]
Kabisa, ndio manake duniani kote nynyi tu ndio mna miradi[emoji122][emoji122]Duh! Huyu mkali kwa jinsi alivyojaa gesi miradi yetu ikikamilika si atalipuka kabisa. Yaani come 2025 SGR ya kati imekamilika, gas pipelines kwenda UG na huko kwao zimekamilika, miradi yote ya umeme iliyotajwa kwenye bajeti ya mwaka huu imekamilika (mingi inakamilika 2023), bro Magu kafufua refinery ya kigamboni, na ... mambo mengine kibao. Watu kama hawa nyuso zao zitainamishwa chini.
Wapi nimesema Tz inajenga treni ya umeme.Hahahaa!!hakuna reli ya umeme jomba, tanzania inajenga reli wala haijengi treni..
Umekosa hoja unatapa tapaNaona mnapumbaza tu humu[emoji1787][emoji1787]
Yani siku hizi kuna reli ambazo hutumia umeme[emoji1787][emoji1787]
Wapi nimesema Tz inajenga treni ya umeme.
[emoji1787][emoji1787][emoji1787]kwn ile unayosema mnayojenga ni ya umeme inahitaji mda zaidi ni treni au reli?Umekosa hoja unatapa tapa