Kenya launches test run on Phase 2A of its SGR Line.

Sinister

JF-Expert Member
Joined
Feb 18, 2013
Posts
1,531
Reaction score
1,577
Sep 13, 2019
https://www.facebook.com/sharer.php...aunches-test-run-on-its-phase-2a-of-sgr-line/
https://twitter.com/intent/tweet?te...a-of-sgr-line/&via=Construction+Review+Online
https://plus.google.com/share?url=h...aunches-test-run-on-its-phase-2a-of-sgr-line/
https://www.jamiiforums.com/whatsap...aunches-test-run-on-its-phase-2a-of-sgr-line/
https://www.linkedin.com/shareArtic...launches+test+run+on+Phase+2A+of+its+SGR+Line


The government of Kenya has launched a 15 day test run on its Standard Gauge Railway (SGR) phase 2A project, which is currently on its final stage of construction. This is inorder to establish a link between the capital Nairobi and the resort town of Naivasha in the rift valley region.
The 120km modern railway line whose construction is overseen by the China Communications Construction Company (CCC), kicked off in October 2016. The line is part of the railway network in east Africa.
Also Read: China to fund construction of Kenya’s Naivasha -Kisumu SGR project

Improving the travelling experience
Upon completion of the SGR phase 2A whose remaining works include fencing and installation of signal systems, the vast swath of Central Kenya is expected to be accessible to rail travelers like never before.
In less than two hours, people traveling from Nairobi to the Rift Valley will be ferried across the 120km track through the longest railway tunnel in the East African region measuring about 4.5 km and across a 6.5km long super bridge, before being dropped at the foot of Mount Suswa, a magnificent shield volcano and a tourist destination in the region.
Some passengers will be alighting at the shiny new stations in Ongata Rongai, Ngong and Mai Mahui, which are built between the Syokimau and Suswa stations, each boasting a uniquely designed exterior and a businesslike aesthetic inside.
More than 500 local youth have benefited from well paid jobs offered during the construction of the railway line that is expected to have a positive impact on strategic sectors of Kenya’s economy like agriculture, tourism and manufacturing.
 
Safi sana, mdogo mdogo tunafika DRC maana Kampala hiyo iko kapuni tayari.
Hapa tutatulie ile siku tutaunga bahari ya Atlantic.
 
Safi sana, mdogo mdogo tunafika DRC maana Kampala hiyo iko kapuni tayari.
Hapa tutatulie ile siku tutaunga bahari ya Atlantic.

Na huo mwendo wa jongoo hayo matreni yanatumie firewood mtafika drc kweli? Si itachukua three months from mombasa to drc?
 
Na huo mwendo wa jongoo hayo matreni yanatumie firewood mtafika drc kweli? Si itachukua three months from mombasa to drc?

Tutafika tu maana kuni zipo nyingi, miti ya kupasua ipo kwa wingi, cha msingi ni kufika Atlantic hata kwa ngumi, na pia kuunga hadi Afrika Kusini na Misri.
 
Iyo reli iko past suswa towards junction, narok county sijui mbona huwa wanataja Naivasha
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…