Kenya: The Standard Gauge Railway Takes Shape

Mazeras-2 Bridge

The 43.5m high Mazeras-2 Bridge is the tallest bridge of the SGR project


Two thirds of the Mazeras-2 Bridge are cast-in-situ rather than precasted


Mazeras-2 Bridge before casting the horizontal spans.Notice the use of cast in place on mazeras super bridge!
 









building various highway bridges across the SGR.USIKU NA MCHANA KENYA KWA SERIKALI YA JUBILEE YAJENGA NCHI!
 
Nairobi VYUMA SPESHELI VITAVYOTUMIKA KUJENGA MSINGI WA STESHENI YA NAIROBI VIMESHAFIKA KATIKA ENEO HILO.

The 1st batch of structural steel components of Nairobi South Station arriving on site




part of Nairobi train depot


Mombasa






Mombasa West Station.NI STESHENI INAYOJENGWA KWA DESIGN YA GOROFA REFU LA TOWER MJINI MOMBASA

 

installing maintenance catwalks for the bridges


installing maintenance catwalks







 
Will this railway pass through Konza??
I think it will pass just at the entrance of Konza,, guys will have to take a bus into the city..... or they will have a choice to go to that syokimau station where pessengers heading to Nairobi will alight and take the light rail and Konza guys will take a light rail heading to Konza....


but the also said once konza is complete, it will be linked via rail to JKIA so you never know how it will be linked
 
Aah..Thank you.
 
Does anyone know the exact length of the Northern corridor SGR section in Kenya. I have researched and the length varies from between 900km-1500km.
But the most detailed and most clearly defined one totals to 1458.9km.
If anyone know the precise length,please share.
 







casting the bridge in segments. The concrete blocks are counter weights for the cantilevered steel formwork


concrete buckets will be lifted by tower crane
______________
 
Concreting works for Mazeras-2 Bridge


works planning




discussing with local suppliers


taking material sample for testing
 
Construction of highway bridge across SGR tracks near Mombasa


this bridge comprises of 3 spans


installing precast concrete beams for the 1st span




fine tuning the position of the beam


beams are installed on top of bearing plates


lunch time after installing the 1st and 2nd spans


installing the 3rd span


4 precast beams are required for each span






lifting the 2nd beam of the 3rd span






Concreting works for Mazeras-2 Bridge
 
Mombasa West Station


Mombasa West Station


Mombasa West Station


Mombasa West Station


Mombasa West Station
concrete buckets will be lifted by tower crane
 
Tsavo and Simba Stations
Tsavo


same design as Simba Station with slight difference in finishes













Simba
 
Nice view, sasa treni zikiwa zinapita si ndio patapendeza balaa, lazima ntaipandaga tu, so iyo reli inaanzia wapi hadi wapi mazee.
 
kutoka ufukweni pwani ya kenya hadi Jiji la Nairobi,kupitia ndani ya tunnel Naivasha-kisumu-malaba border hadi Uganda na Rwanda.
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…