Kenya’s Mombasa-Nairobi rail service doing well, ‘will break even by 2020’

Kenya’s Mombasa-Nairobi rail service doing well, ‘will break even by 2020’

Jay456watt

JF-Expert Member
Joined
Aug 23, 2016
Posts
10,356
Reaction score
7,992

A $3.8 billion railway project linking Kenya's largest port Mombasa and the capital Nairobi is doing well and the railway will reach the break-even point by 2020, an employee of State-owned China Communication Construction Corp (CCCC) has said recently.

The comment came after some foreign media suggested the debt for the line, the country's first standard-gauge railway, might be too burdensome for the East African country. The railway was built by China Road and Bridge Corp (CBRC), a subsidiary of CCCC.

On Wednesday, tracks were laid for a 120-kilometer extension of the railway - the Nairobi-Naivasha line - toward the Kenya-Uganda border.

"From construction to operation, CBRC has kept the overall cost of the railway at a reasonable level, bearing in mind economic feasibility, and kept the operating profit margin low. The railway will reach the break-even point by 2020, when the loans for the project are due," an employee at CCCC told the Global Times.

The 480-kilometer railway, also known as the Madaraka Express, marked the first anniversary of passenger services in June. In its first year, the railway carried more than 1.4 million passengers with a utilization rate of more than 90 percent. It also reduced the travel time between the port city and Nairobi to about five hours from more than 10 hours. The project is believed to have boosted Kenya's GDP growth by 1.5 percent.

There are doubts over whether the railway is a worthy investment, as the loans for the project amounted to about 6 percent of Kenya's GDP, a BBC report in June said. Passenger business aside, the report suggested that the project needs to attract 20 million to 55 million tons of cargo annually, citing a consultancy report.

According to a China Media Group report in June, the railway's cargo volume will reach 14 million tons annually by the end of 2019, citing James Wainaina Macharia, the Kenyan minister of transport, infrastructure, housing and urban development. In its first year, cargo amounted to 608,000 tons.

The railway line cost about $3.8 billion, and the Export-Import Bank of China reportedly funded 90 percent of the total. The State-owned policy bank was not available for comment as of press time on Thursday.

CRBC said cargo transport demand between the two cities will rise to 5.61 million tons by 2020 and 11.94 million tons by 2025 and the railway is expected to carry 60 percent of the volume.

The railway will be the first section of a broader plan of a 2,700-kilometer regional rail network to connect countries from South Sudan to Tanzania in East Africa.

"The debt issue is important, but the successful operation and sustainable development of the railway is more important. If this railway can be successfully operated, it will serve as an example for future projects involving East African rail networks," said Li Zhibiao, a research fellow at the Institute of West Asian and African Studies of the Chinese Academy of Social Sciences in Beijing.

"If not, it would be wise to slow down such projects," Li said.
 
Ahaaa haaa haaa
Wishful thinkers with their feel good stories.
 
Duh! I will hate to be you, unapata tabu sana kwa kweli....This thing is unstoppable.

Ahaaa haaa haaa
Ok le me put like this, the mighty Kenya SGR will reach all the way to Congo Brazaville. I think now your heart beats are in good pace.
 
Hiki ktu siku tutafikisha kwa Msudan, Mkongoman na Mnyarwanda ndio akili zangu zitatulia, lakini kwa sasa naomba ipelekeshwe kwa nguvu zote.
kiswahili chako hakieleweki labda jalibu kutuelewesha kwa kutumia lugha nyingine
 
moro has a pop of 100000 ..stop lying to us

Brother understand the theme. We r talking about the people who are moving, we mean a travel count. How many an individual can travel per year.
Again the facility will be mostly used by the Dar, Coastal and Moro population.
So100k population of Moro, which I doubt, is just a part of user population.
 
Brother understand the theme. We r talking about the people who are moving, we mean a travel count. How many an individual can travel per year.
Again the facility will be mostly used by the Dar, Coastal and Moro population.
So100k population of Moro, which I doubt, is just a part of user population.
i doubt if it would busy as mombasa - nai
 
i doubt if it would busy as mombasa - nai
Wakati una anza kuhesabu traffic ya Dar-Moro kabla hujamaliza Dar-Dom inaanza kupiga kazi, ukianza kuhesabu na yenyewe unashtuka Dar-Mwanza iko tayari huku Isaka-Kigali ikichanja mbuga. Msee jipe shughuli nyingine, hii yetu tofauti na yenu ambayo go ahead ya ujenzi inatoka Beijing.
 
Back
Top Bottom