Likoni bridge (450m span) vs Selander alias Nyerere bridge (1.03 km)

Geuza Ulale ame'salenda'. Ako busy anageuzia wanaume saa hii 😂 😂
 
Likoni Bridge Facts

COMPENSATION

About 1,200 residential and 833 commercial buildings will be brought down to pave the way for the bridge on both sides of the channel. The cost of compensation is expected to hit Sh12 billion even before construction starts three years from now, in 2022.
Among the 725 parcels of land that will be repossessed by the government are 125 commercial and 10 residential plots in the Majengo area of the island, 234 residential and 38 commercial parcels in Likoni, and 46 residential plots in Mtongwe. Others are 263 parcels in Shika Adabu and nine agricultural tracts in Ng’ombeni, Kwale County.
Likoni sub-county will account for 82.5 per cent of land to be acquired for the project

construction
The bridge will start on Lumumba Road, near Jela Baridi Prison in Majengo. It will go over the Mombasa Railway Station, Moi Avenue and Archbishop Makarios Road before it starts the arc over the Likoni Channel at Mwenza Creek. On the mainland side, it will join the Southern Bypass at Ziwani through Mtongwe Road.
The cable-supported bridge will tower over the channel by 69 metres at the highest water level and will be 1.4 kilometres long.
 
So if the project is to start in 2022, why r u people making noises in here!? Finish compensation first! And Fools, get things to do!
 
So if the project is to start in 2022, why r u people making noises in here!? Finish compensation first! And Fools, get things to do!
You started a topic with false information and lies as you Tanzanians always do. I do not know what your problem with Kenya is but you need mental health checkup. The "Kenya derangement syndrome" has driven you and your compatriots to idiocy and lunacy.
Kenya keeps moving forward and growing everyday by leaps and bounds while your country is stagnating and your beloved south africa is regressing.
 
So if the project is to start in 2022, why r u people making noises in here!? Finish compensation first! And Fools, get things to do!
Also next time do not compare a massive project like Likoni Bridge with your glorified foot bridge.
 
Still the Likoni bridge span stands at 450m! U argue on a project that even a compensation to pave a way for the structure is not ready! How sure r u the GoK will manage to raise the money needed for compensation?
 
Still the Likoni bridge span stands at 450m! U argue on a project that even a compensation to pave a way for the structure is not ready! How sure r u the GoK will manage to raise the money needed for compensation?
You are insane, it is 1.4 KM go to Kenha portal also confirm the same with JICA. Money for compensation is not your problem it is ours(We have done it before on sgr, thika road, highways we will not ask you for help). Japan will fund construction through JICA and the deal has already been signed.
 
You are insane, it is 1.4 KM go to Kenha portal also confirm the same with JICA. Money for compensation is not your problem it is ours. Japan will fund construction through JICA and the deal has already been signed.
Ya right...From start date in 2018 to now 2022! 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣
 
Ya right...From start date in 2018 to now 2022! 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣 🤣
Better late than never. I prefer due diligence over launching projects without feasibility studies like your "Biggest port in africa" aka bagamoyo.
 