Nyinyi hamna viaduct ya barabara. Nyamaza tu hadi mjenge yenu ya kwanza mwaka wa 2032.I came to learn only 8.2 km of 26.4 km of ur express highway will be a viaduct! IRMAO n u r to pay over $2 bln after they collected their charges!
Usishtuke, atleast nyinyi hampigwiLkn mnapigwa sana mazee, I hope nyie washkaji humu mnapata chochote kitu
Na kwanini tujenge viaduct ya magari ya kulipia badala ya public metro?Nyinyi hamna viaduct ya barabara. Nyamaza tu hadi mjenge yenu ya kwanza mwaka wa 2032.
The elevated section is 11.1km, stop talking about things you don't know. The road also has a total of 10 interchanges which is more than the total number of interchanges in East and Central Africa outside Kenya.I came to learn only 8.2 km of 26.4 km of ur express highway will be a viaduct! IRMAO n u r to pay over $2 bln after they collected their charges!
I am just asking this out of curiosity because I am not an Engineer. In Engineering, when they say 4-lane dual carriageway do they mean 4 lanes on either side or four lanes total?The elevated section is 11.1km, stop talking about things you don't know. The road also has a total of 10 interchanges which is more than the total number of interchanges in East and Central Africa outside Kenya.
View attachment 1803335
They say 8.2 km 👇The elevated section is 11.1km, stop talking about things you don't know. The road also has a total of 10 interchanges which is more than the total number of interchanges in East and Central Africa outside Kenya.
View attachment 1803335
The guy has showed you a scope of work from KENHa.They say 8.2 km [emoji116]
https://www.kenyanews.go.ke/construction-of-nairobi-expressway-on-top-gear/
unajua maana ya scope? Is scope the final say? Au unataka tuanze kubishana kuhusu feasibility study of a project?The guy has showed you a scope of work from KENHa.
Hawa kenya.ke ni mediocres sana
The project is already being constructed. Feasibility stufy was done and completed. Kenha source shows 11km viaduct so pissunajua maana ya scope? Is scope the final say? Au unataka tuanze kubishana kuhusu feasibility study of a project?
What Is Scope in Project Management?
Just as you wouldn't build a house without blueprints, you should start your project without a clear project scope. Learn how to define and manage your scope in project management, including vital tools such as PERT charts and work breakdown structures.www.lucidchart.com
4 lanes in total. The expressway has 6 lanes (4 normal and one emergency), the ground has 6 (4 normal, 2 BRT) a total of 12 lanes excluding service lanes.I am just asking this out of curiosity because I am not an Engineer. In Engineering, when they say 4-lane dual carriageway do they mean 4 lanes on either side or four lanes total?
I'm sending you the project report and you're sending me an article from a blog. Is your head okay?