The only cable stayed bridges in East and central Africa

The only cable stayed bridges in East and central Africa

Status
Not open for further replies.
Watakwambia kwani nairobi ipo na bahari mpaka tuwe na cable bridge. Subir tu soon watakuja kusema hivyo. Au watasema pale ferry lokoni wataweka cable cars.
Kwani si wajenge Mombasa
 
Wow...the real cable bridge.

Another of Kunyaland bridge
bridge.jpg


 
Still ya Mozambique ni better by far.
San Francisco stuffs
Wapi ya Kunyaland?

If that is better than this

Tanzania to commence construction of the new Selander Bridge in Dar es Salaam
By Dorcas Kang'ereha -

Last Updated: Jul 27, 2018


Tanzania is set to begin construction of the 6.2 km Selander bridge in Dar es Salaam following signing of a Memorandum of Understanding between Tanzania and South Korea.

The MOU which was signed in the presence of President John Magufuli and the visiting South Korea Premier, Mr Lee Nak-yeon, will see construction costs of the bridge at US $126.26m and is expected to be completed by 2021.

The new edifice will run from Selander bridge and along the Indian Ocean beach front in the city. The 180-tonnage capacity bridge will ferry 55,000 vehicles per day and is expected to greatly reduce congestion along the overwhelmed independence-time Selander bridge.

Also read: The government of Tanzania constructs Mbaka and Lufilo bridges

Tanzania National Roads Agency (Tanroad) chief executive officer Patrick Mfugale said South Korea will cover 82.9% of the cost while Tanzania will fund the remainder.

Project link
Tanzania National Roads Agency (Tanroad) chief executive officer Patrick Mfugale said South Korea will cover 82.9% of the cost while Tanzania will fund the remainder.

Mfugale said the bypass will connect Aga-Khan Obama drive and Coko Beach at the junctions of Kenyatta and Toure roads.

President Magufuli urged the contractor to speed up work. “With advanced technology that Korea has, I don’t expect the contractor to delay in completing the project.,” noted the Head of State.

Morever, the President said he had requested South Korean through Exim Bank to help Tanzania with a soft loan for construction of the Mwanza-based 3 km Kigongo-Busisi Bridge.

“The Good news is that he has promised to convey my request to his President,” said Dr Magufuli.

Tanzania to commence construction of the new Selander Bridge in Dar es Salaam
 
Watakwambia kwani nairobi ipo na bahari mpaka tuwe na cable bridge. Subir tu soon watakuja kusema hivyo. Au watasema pale ferry lokoni wataweka cable cars.

Kumbe unaelewa. Just covering your a** because you knew it was coming.
Do you want us to invent water bodies?
The only bridge under congestion/ traffic jam stress in Kenya is Likoni. And we'll be building a second one very soon.
 
Kumbe unaelewa. Just covering your a** because you knew it was coming.
Do you want us to invent water bodies?
The only bridge under congestion/ traffic jam stress in Kenya is Likoni. And we'll be building a second one very soon.
Renders please😂😂😂 So no those cable cars??
 
Renders please😂😂😂 So no those cable cars??

Kenya is a multi-project country. We don't build one flyover and everything else comes to a standstill.
We are going to build both the bridge and cable cars.
And the cable cars are a private project.

The Likoni bridge final design is not out, but just know it will be the most ambitious in the region.
It will cost about 6 times your Kigamboni bridge.

https://www.nation.co.ke/counties/m...oni-bridge/1954178-4283550-13v9hxg/index.html
 
Kumbe unaelewa. Just covering your a** because you knew it was coming.
Do you want us to invent water bodies?
The only bridge under congestion/ traffic jam stress in Kenya is Likoni. And we'll be building a second one very soon.

The only existing suspension bridge in Kenya
Masalani_03.jpg
 
Kenya is a multi-project country. We don't build one flyover and everything else comes to a standstill.
We are going to build both the bridge and cable cars.
And the cable cars are a private project.

The Likoni bridge final design is not out, but just know it will be the most ambitious in the region.
It will cost about 6 times your Kigamboni bridge.

900 buildings to pave way for Likoni bridge

We want a design not the cost unless another SGR pillage is on the way!
 
We want a design not the cost unless another SGR pillage is on the way!

Wait for it.
Unless you bring it up, we don't talk much about projects that are yet to start. We are not 'tuta' people.
When the time arrives, we will have a Likoni bridge thread.
 
Status
Not open for further replies.
Back
Top Bottom