Tz Current Installed Capacity
1.JNHPP 2115Mw
2.Kinyerezi 1 150Mw
3.Kinyerezi 1 extension 185Mw
4. Kinyerezi 2 240Mw
5.Ubungo 1 100Mw
6.Ubungo 2 120Mw
7. Ubungo 3 112mw
8.Tegeta Thermal 45Mw
9 Mtwara thermal Gas 18Mw
10 Kihansi Hep 180mw
11.Kidatu Hep 204 Mw
12. Mtera Hep 80mw
13. Hale 21 mw
14. Pangani 66mw
15 Somanga 7.5mw Gas
16. Rusumo 23Mw
17. songas power plant 207mw
Hapo total 3873 mw
Sijaweka off grid plants ie Bukoba , Kigoma, Mpanda , Sumbawanga cause nying hapo ziko chini ya Mw 5 so kwa ujumla zinaweza kuta zina Mw 15
U/C project and projects with funds already
1.Malagarasi HEP 50mw
2. Kakono Hep 87mw
3.Shinyanga Solar Farm 150mw 1st phase is 50Mw
Hapo Tz haijaamua kugusa other potential sources Geothermal, Wind hatujazipa umuhimu bado , hata Solar bado tunaigusia gusia, Coal ndo hatujataka hata kuigusa
planned projects mostly to be implemeted 2030 plus
1.Kikonge Hep 300Mw
2.Ruhudji Hep 222mw
3.Rumakali Hep 358mw
4.Somanga Gas Plant 300mw
5.Kuna nyingine hata 20 sijagusia potential ni kubwa sana kuna Kinyerezi 3 and 4 kuzalisha kama 1GW,