Nipo najenga nyumbn huko mwakan mungu akinipa uzima nimejarbu kujenga kwenye karatasi na lengo ni kuihamia ikiwa na ukamilifu atleast 75/89% let go guys
BREAK DOWN
(NYUMBA YA ROOM 3+ MASTER BEDROOM, P.T, DN .SEBULE )
NONDO
MKANDA WA MSINGI NA LINTA
-Linta ya msingi nondo 28@22000/- 616000
-Linta ya juu nondo 35@22000/-= 770,000/-
Sub total Tshs 1333000/-
KOKOTO
TRIP 4 =M³2@ 200,000 = 800,000/-
Nb:- Kokoto ni hadi zege ndani
MCHANGA
MAXIMUM WA 800,0000/-
TOFAULI 2500/- @1000= 2500,000/-
CEMENT BAGS 135@14815. = 2,000,000/-
Sub total. 5,300,000/-
CHOO 2,500,000/-
(Ujenz wa shimo la choo ft 11]
UMALIZIAJI
MBAO ZA KUPAU ZOTE
2X4
2X2
2X3
TOTAL COST TSHS 2,000,000/-
MISUMARI TSHS 500,000/-
BATI (ALAFI)
BANDO TSHS 560,000/- PC16 35000
PC 120@35000 = 4,200,000/-
Sub total 6,700,000/-
Madirisha ya grili
Pc10@100,000/= 1,000,000/-
Mlango wa mbele na nyuma tshs 500,000/= Tshs 1,000,000/=
Tanki linta 1500. tshs 200,000/=
Mifumo ya maji ndani 500,000/-
Sink ya vyoo na jikon 500,000/
Electric installion tshs 1,000,000/=
Sub total 4,200,000/
Fundi tshs Tshs 3,000,000/=
Mengineyo tshs 2,000,000/=
Totol cost 26,633,000
ApproximatelyTSHS 27,000,00/=
View attachment 2811462View attachment 2811461View attachment 2811460View attachment 2811464View attachment 2811463View attachment 2811465
BREAK DOWN
(NYUMBA YA ROOM 3+ MASTER BEDROOM, P.T, DN .SEBULE )
NONDO
MKANDA WA MSINGI NA LINTA
-Linta ya msingi nondo 28@22000/- 616000
-Linta ya juu nondo 35@22000/-= 770,000/-
Sub total Tshs 1333000/-
KOKOTO
TRIP 4 =M³2@ 200,000 = 800,000/-
Nb:- Kokoto ni hadi zege ndani
MCHANGA
MAXIMUM WA 800,0000/-
TOFAULI 2500/- @1000= 2500,000/-
CEMENT BAGS 135@14815. = 2,000,000/-
Sub total. 5,300,000/-
CHOO 2,500,000/-
(Ujenz wa shimo la choo ft 11]
UMALIZIAJI
MBAO ZA KUPAU ZOTE
2X4
2X2
2X3
TOTAL COST TSHS 2,000,000/-
MISUMARI TSHS 500,000/-
BATI (ALAFI)
BANDO TSHS 560,000/- PC16 35000
PC 120@35000 = 4,200,000/-
Sub total 6,700,000/-
Madirisha ya grili
Pc10@100,000/= 1,000,000/-
Mlango wa mbele na nyuma tshs 500,000/= Tshs 1,000,000/=
Tanki linta 1500. tshs 200,000/=
Mifumo ya maji ndani 500,000/-
Sink ya vyoo na jikon 500,000/
Electric installion tshs 1,000,000/=
Sub total 4,200,000/
Fundi tshs Tshs 3,000,000/=
Mengineyo tshs 2,000,000/=
Totol cost 26,633,000
ApproximatelyTSHS 27,000,00/=