CEMENT BAGS 135@14,815. = 2,000,000/-Nipo najenga nyumbn huko mwakan mungu akinipa uzima nimejarbu kujenga kwenye karatasi na lengo ni kuihamia ikiwa na ukamilifu atleast 75/89% let go guys
BREAK DOWN
(NYUMBA YA ROOM 3+ MASTER BEDROOM, P.T, DN .SEBULE )
NONDO
MKANDA WA MSINGI NA LINTA
-Linta ya msingi nondo 28@22000/- 616000
-Linta ya juu nondo 35@22000/-= 770,000/-
Sub total Tshs 1333000/-
KOKOTO
TRIP 4 =M³2@ 200,000 = 800,000/-
Nb:- Kokoto ni hadi zege ndani
MCHANGA
MAXIMUM WA 800,0000/-
TOFAULI 2500/- @1000= 2500,000/-
CEMENT BAGS 135@14815. = 2,000,000/-
Sub total. 5,300,000/-
CHOO 2,500,000/-
(Ujenz wa shimo la choo ft 11]
UMALIZIAJI
MBAO ZA KUPAU ZOTE
2X4
2X2
2X3
TOTAL COST TSHS 2,000,000/-
MISUMARI TSHS 500,000/-
BATI (ALAFI)
BANDO TSHS 560,000/- PC16 35000
PC 120@35000 = 4,200,000/-
Sub total 6,700,000/-
Madirisha ya grili
Pc10@100,000/= 1,000,000/-
Mlango wa mbele na nyuma tshs 500,000/= Tshs 1,000,000/=
Tanki linta 1500. tshs 200,000/=
Mifumo ya maji ndani 500,000/-
Sink ya vyoo na jikon 500,000/
Electric installion tshs 1,000,000/=
Sub total 4,200,000/
Fundi tshs Tshs 3,000,000/=
Mengineyo tshs 2,000,000/=
Totol cost 26,633,000
ApproximatelyTSHS 27,000,00/=
View attachment 2811462View attachment 2811461View attachment 2811460View attachment 2811464View attachment 2811463View attachment 2811465
Kwenye breakdown ni vyema utenge na kutofautisha material cost na labour charges kwny kila kitu hasa zege, tofali, na garama ya cement ikiwemo plaster kwa stages yaani kwa msingi, boma na umaliziaji usiwe general nenda stage moja mpk nyingine.Nipo najenga nyumbn huko mwakan mungu akinipa uzima nimejarbu kujenga kwenye karatasi na lengo ni kuihamia ikiwa na ukamilifu atleast 75/89% let go guys
BREAK DOWN
(NYUMBA YA ROOM 3+ MASTER BEDROOM, P.T, DN .SEBULE )
NONDO
MKANDA WA MSINGI NA LINTA
-Linta ya msingi nondo 28@22000/- 616000
-Linta ya juu nondo 35@22000/-= 770,000/-
Sub total Tshs 1333000/-
KOKOTO
TRIP 4 =M³2@ 200,000 = 800,000/-
Nb:- Kokoto ni hadi zege ndani
MCHANGA
MAXIMUM WA 800,0000/-
TOFAULI 2500/- @1000= 2500,000/-
CEMENT BAGS 135@14815. = 2,000,000/-
Sub total. 5,300,000/-
CHOO 2,500,000/-
(Ujenz wa shimo la choo ft 11]
UMALIZIAJI
MBAO ZA KUPAU ZOTE
2X4
2X2
2X3
TOTAL COST TSHS 2,000,000/-
MISUMARI TSHS 500,000/-
BATI (ALAFI)
BANDO TSHS 560,000/- PC16 35000
PC 120@35000 = 4,200,000/-
Sub total 6,700,000/-
Madirisha ya grili
Pc10@100,000/= 1,000,000/-
Mlango wa mbele na nyuma tshs 500,000/= Tshs 1,000,000/=
Tanki linta 1500. tshs 200,000/=
Mifumo ya maji ndani 500,000/-
Sink ya vyoo na jikon 500,000/
Electric installion tshs 1,000,000/=
Sub total 4,200,000/
Fundi tshs Tshs 3,000,000/=
Mengineyo tshs 2,000,000/=
Totol cost 26,633,000
ApproximatelyTSHS 27,000,00/=
View attachment 2811462View attachment 2811461View attachment 2811460View attachment 2811464View attachment 2811463View attachment 2811465