daraja la magari mlishindwa kujenga ndo uongelee daraja la train?Rail over Rail nayo ni celebration,
Hizi nugu zilisomea wapi aki
The tallest SGR station in EA is Miritini and the largest is Syokimau. Both are more modern and beautiful than that cowshed.Rail over rail is state of the art design! Aside that here is the largest, most modern and tallest SGR train station in the whole of East and central Africa!
Unless u choose to count out the office building! How big is Sokimayu in square meters? I mean inside space!The tallest SGR station in EA is Miritini and the largest is Syokimau. Both are more modern and beautiful than that cowshed. View attachment 1341066View attachment 1341067
Sent using Jamii Forums mobile app
Make good use of your eyes Methuselah.Unless u choose to count out the office building! How big in sq m is Sokimayu? I mean inside space!
Didn't I just write a whole paragraph on how the cost of TZ SGR does not account for everything while the cost of Kenya's SGR account for everything!!!!!! And here you are again listing things that are in your SGR.. WTF! Are you really this dumb to understand??? Where is the cost of the TL, Cost of Trains, Cost of wagons and coaches, Cost of sending professionals to learn railway engineering abroad...??????and yet not electrified n SGR track not joint welded!
While Mombasa-Naivasha diesel SGR track length 609+120= 726 km is $3.8+1.5= $5.4 bln, our Dar-Makutupora SGR track length of over 700km (305km SGR I+409km SGR II) of electrified joint welded SGR is $3.1 (1.2 SGR I + 1.9 SGR II) bln as TL is not part of the TRC cost but part of Tanesco's costs! As for structures the Ruvu bridge across swampy Ruvu basin is 3 km n Dar viaduct is 2 km! As for tunnels there r also tunnels (whose lengths are T1 424 m, T2 1.031 m, T3 318 m and T4 847 m) for Morogoro -Makutupora with a total length of 2.6 km!
Punguzeni Ushamba, kwani hakuna mahali Kenya ambapo SGR inapita juu ya MGR !?Rail over rail only in Tanzania
View attachment 1340360
View attachment 1340361
View attachment 1340362View attachment 1340363
I think you have a comprehention problem Geza, get yourself checked out, manake naona vitu vinapita sikio moja na vinatoka sikio lengine.... Hii ndio commet niliowekaDar -Moro SGR is $1.2 bln! U r talking of poles inside perimeter wall but I see none of that to call a dedicated TL for ur SGR! U r simply naive to say the electrification cost was covered within that $3.8 bln figure! If so, then why this signing happened? here they say Mombasa Nairobi costed Kshs 447 bln meaning above that $3.8 bln mark! That means $4.47 bln + 0.24 bln leads to $4.71 bln for 628 km track of SGR!
Chinese firm lends Kenya Sh25bn to electrify SGR - VIDEO
The loan, which has been obtained through Ketraco, will be used to build power stations, linewww.businessdailyafrica.com
Can u show me those poles for TL? And if what u say is true why ur government signed a loan of $240 mln for SGR electrification? Was that for fighting hunger?I think you have a comprehention problem Geza, get yourself checked out, manake naona vitu vinapita sikio moja na vinatoka sikio lengine.... Hii ndio commet nilioweka
------quote-----
Do you sometimes just pretend to be oblivious or is it an actual real thing? You seem to completely miss the point on this issue, I thought you would have got it by now, but you haven't.
This is not about if tanesco is building other TLs, this is about one specific TL built for the SGR and who should pay for it!
Kenya's SGR might not be elelectric, but from Mombasa-Nairobi there is a 32kv continuous power supply line (which is the equivalent of the 220kv TL bieng built by Tanesco) thats powers the sensors,traffic control systems, stations along the line, the cost of this continuous power line was part of the contract with CCCC/CRBC. even though the line is maintained by KPLC! This is what i'm talking about, where in Tanzania, its tanesco that will foot the bill of that TL thats is exclusively built for the SGR.
If you have never noticed, there are concrete electric poles inside the perimeter fence of Kenyas SGR, those power lines go from Mombasa the way to Nairobi, the cost of that power line was included in the contract together with other things, unlike in TZ where the construction contract excludes other expenses of which without them the rail won't work. e.g Trains, Wagons, TL...etc
----end quote----
Nilisema very clearly, kwamba reli ya Kenya kuna 32kv continuous power line ambayo inatumika ku power stations, sensors...etc this 32kv line is essetially the equivalent of the 220kv line in Tanzania the only difference is that in Kenya, the line was part of the funding.....
Alafu wewe unaenda kusema mambo ya Kenya SGR electrification !!!!!!! wapi nimesema kwamba electrification ya SGR iko ndani ya kandarasi!!!!??? nimesema kuna nyaya za stima zinazo sambaza stima exclusivley kwenye SGR stations, sensors...etc
Alafu kuhusu hio $3.8 vs Ksh 447 Billion, first of all, hio Ksh447B hua inakua quoted ni Loan + Interest payment, alafu Mkataba wa SGR Kenya ulitiwa sign mwazo wa 2012, Wakati huo $1 ilikua sawa na 84 pesa za Kenya, si kama sasa ambapo $1 ni sawa na Ksh 100.
View attachment 1341392
Hebu soma tena hii line, kama bado maneno yanapita sikio moja na kutoka kwa sikio lengine, niambie nikuelezee tenaCan u show me those poles for TL? And if what u say is true why ur government signed a loan of $240 mln for SGR electrification? What that for fighting hunger?
Tofautisha kupishana, na kwenda sambamba.Punguzeni Ushamba, kwani hakuna mahali Kenya ambapo SGR inapita juu ya MGR !?
Ss jibu la picha linajibiwa na picha nduguPunguzeni Ushamba, kwani hakuna mahali Kenya ambapo SGR inapita juu ya MGR !?
sambamba kwa urefu kiasi gani ?Tofautisha kupishana, na kwenda sambamba.
Labda ile cable-stayed rail bridge ndo mnaeza mkajisifu nayo, lakini hio rai-over-rail tunayo.Ss jibu la picha linajibiwa na picha ndugu
Jirani wamechanganyikiwa mambo tunayoyafanya kwa ss hawaamini na jinc walivyokuwa wanatuchukulia hapo mwanzo lazima wapagawe hvyo twendeni nao taratibu wataelewa tu na watazoea kwmb sisi ni baba zao kwny ukanda huu.eti umepoteza picha [emoji16][emoji16].. kwamba ulikuwa nazo wewe tu hata google hazipo?
afu ili kutupoteza umeweka vitu hata ambavyo hujaulizwa
So there is no existing TL from Kinyerezi to Morogoro? Electrification means dedicated TL for SGR! Where u not arguing about already existing TL in Tanzania? Can u substantiate that any TL at all was covered with that $4.4 bln SGR?Hebu soma tena hii line, kama bado maneno yanapita sikio moja na kutoka kwa sikio lengine, niambie nikuelezee tena
----
Kenya's SGR might not be elelectric, but from Mombasa-Nairobi there is a 32kv continuous power supply line (which is the equivalent of the 220kv TL bieng built by Tanesco) thats powers the sensors,traffic control systems, stations along the line, the cost of this continuous power line was part of the contract with CCCC/CRBC. even though the line is maintained by KPLC!
-------
Laggard, hanging basket technology has been in Tanzania since 1970s (during black n white photos era) across Mpanga river! Check TAZARA a replica of ur bridges n viaducts across Thika River!sambamba kwa urefu kiasi gani ?
Labda ile cable-stayed rail bridge ndo mnaeza mkajisifu nayo, lakini hio rai-over-rail tunayo.
Kuna sehemu nyingi ambapo SGR ya Kenya inapishana na MGR kwa daraja la kawaida, lakini kunazo sehemu zengine SGR na MGR zinaenda sambamba juu na chini hadi inabidi kujengwa daraja la aina hio iliojengwa huko Tz
Una bahati nimepoteza picha nilizokua nazo kitambo kwani zilikua zinaonyesha vizuri sana, hii nimepata mtandaoni sahii tu baada ya ku google..
hata kama ni kwa meter 20,bado ni rail-over-rail bridge!
View attachment 1341630
Kwahivyo Tanzania is not the first in the region
And speaking of firsts, Kenya tume achieve alot many firsts kwa SGR, hadi sasa hakuna nchi inafanya Double-stack containers in Africa!
Hakuna mtu alie na SGR ambayo inavuka baharini
Hakuna daraja ra reli limejengwa kutumia hanging basket technology .
On January 10, China State Councilor and Foreign Minister Wang Yi said this!It may be called the Tanzania-Zambia Railway of the new era and is becoming a new symbol of the friendship between China and Kenya and between China and Africa. As a good friend, good partner and good brother of Africa, China has always fully respected Africa and helped Africa build infrastructure and accelerate economic and social development in accordance with the needs of African countries, which has brought tangible benefits to African countries and people. This is also the fundamental reason why China-Africa cooperation has been welcomed by African countries.