Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Update: lot 3 and lot 4 of SGR Dar-Mwanza about to be launched!




MY TAKE
  • 1 km of SGR in another countries in Africa $5-7 mln while in Tanzania is $3.5 mln!
  • diesel SGR is 3 times electrical SGR in running cost!
  • Tanzania's SGR is way more superior in tonnage capacity to be haulage than other SGR in Africa!
  • Tanzania SGR is faster (120km/h cargo n 160 km/h PAX) than other SGR than other SGRs around Africa (80 km/h cargo n 120 km/h PAX)! AND the speed can be increased to 250 km/h at no cost!
  • Mwanza city to be a logistic hub in the great lakes region, a massive inland depot (the largest in East and central Africa) is to be constructed at Fela in Mwanza city!

Kadanganye wajinga.
Your cost is more like $4.5m per km..

Your SGR has a capacity of only 17million tonnes p.a

The line, from Morogoro to Makutupora, both in central Tanzania, will have the capacity to transport 17 million tonnes of cargo each year, RAHCO said.


If your railway can achieve 250km/hr, It would have been said that the design speed of the railway is 250kmm/hr.... But they did not say that, they said maximum 160km/hr... I mean why even do 160km/hr if you can do 250km/hr? fikiria bana! Anyone who tells you that the speed can be increased to 250km/hr at no cost is lying to himself and to you... This is not some passenger dedicated rail service, your rail will be 95% freight oriented.


Alafu kama ulikua hujui, Yepi Markezi wanajenga reli ya 392km Awash-Weldiya SGR which is even cheaper than Tz-SGR

Alafu hio cladding waliotumia kujenga stesheni za Tanzania (nje ya Dar station) naona ni io hio ndo design wametumia kujenga kule Ethiopia

RMYhwUI.png


06-1-768x533.jpg



Hio reli ambayo Yepi wanajenga huko Ethiopia, wako 50 Months behind Schedule kama vile TZ, Sijui shida yao ni nini hawa jamaa, they need to consult another time-keeping god!

iu


iu

IZAXAJw.jpg



OiLxIhy.jpg

kfQwFVW.jpg

twNwIk0.jpg


FlbTx4x.jpg



Inside one of the stations
BsRsIfT.jpg


mMpeDq2.jpg



Bogi la kutembeza wanahabari ni kama lilelile la Tz
WG0Nnc9.jpg



TNNNyYI.jpg




-------Kwahivyo punguza kiherehere, reli yenu ni replica ya ile ambayo Yepi washajenga kule Ethiopia! mambo ya best in Africa sahau, maybe if Tz was the only country in Africa.







Bonus

National_Railway_Network_of_Ethiopia.png
 
Kadanganye wajinga.
Your cost is more like $4.5m per km..

Your SGR has a capacity of only 17million tonnes p.a



If your railway can achieve 250km/hr, It would have been said that the design speed of the railway is 250kmm/hr.... But they did not say that, they said maximum 160km/hr... I mean why even do 160km/hr if you can do 250km/hr? fikiria bana! Anyone who tells you that the speed can be increased to 250km/hr at no cost is lying to himself and to you... This is not some passenger dedicated rail service, your rail will be 95% freight oriented.


Alafu kama ulikua hujui, Yepi Markezi wanajenga reli ya 392km Awash-Weldiya SGR which is even cheaper than Tz-SGR

Alafu hio cladding waliotumia kujenga stesheni za Tanzania (nje ya Dar station) naona ni io hio ndo design wametumia kujenga kule Ethiopia

RMYhwUI.png


06-1-768x533.jpg



Hio reli ambayo Yepi wanajenga huko Ethiopia, wako 50 Months behind Schedule kama vile TZ, Sijui shida yao ni nini hawa jamaa

iu


iu

IZAXAJw.jpg



OiLxIhy.jpg

kfQwFVW.jpg

twNwIk0.jpg


FlbTx4x.jpg



Inside one of the stations
BsRsIfT.jpg


mMpeDq2.jpg



Bogi la kutembeza wanahabari ni kama lilelile la Tz
WG0Nnc9.jpg



TNNNyYI.jpg




-------Kwahivyo punguza kiherehere, reli yenu ni replica ya ile ambayo yepi washajenga kule Ethiopia!







Bonus

National_Railway_Network_of_Ethiopia.png
Huwa sikujibu umechukua lot2 ukaacha lot 1 and lot5 needed to get the everage of $3.5 mln per km! As for load capacity listen to TRC Managing Director he has clearly explained 17 mln is the minimum tonnage! Science has always proven an axle load of 35 tons to have more capacity tof carry more cargo than that of 25 tons! The rest is ukunya argument!
 
Huwa sikujibu umechukua lot2 ukaacha lot 1 and lot5 to get the everage of $3.5 mln per km! As fpr load capacity listen to TRC Managing Director he has clearly explained 17 mln is the minimum tonnage!
Hata sisi ile 22 Million tones ndo minimum
 
Kadanganye wajinga.
Your cost is more like $4.5m per km..

Your SGR has a capacity of only 17million tonnes p.a



If your railway can achieve 250km/hr, It would have been said that the design speed of the railway is 250kmm/hr.... But they did not say that, they said maximum 160km/hr... I mean why even do 160km/hr if you can do 250km/hr? fikiria bana! Anyone who tells you that the speed can be increased to 250km/hr at no cost is lying to himself and to you... This is not some passenger dedicated rail service, your rail will be 95% freight oriented.


Alafu kama ulikua hujui, Yepi Markezi wanajenga reli ya 392km Awash-Weldiya SGR which is even cheaper than Tz-SGR

Alafu hio cladding waliotumia kujenga stesheni za Tanzania (nje ya Dar station) naona ni io hio ndo design wametumia kujenga kule Ethiopia

RMYhwUI.png


06-1-768x533.jpg



Hio reli ambayo Yepi wanajenga huko Ethiopia, wako 50 Months behind Schedule kama vile TZ, Sijui shida yao ni nini hawa jamaa, they need to consult another time-keeping god!

iu


iu

IZAXAJw.jpg



OiLxIhy.jpg

kfQwFVW.jpg

twNwIk0.jpg


FlbTx4x.jpg



Inside one of the stations
BsRsIfT.jpg


mMpeDq2.jpg



Bogi la kutembeza wanahabari ni kama lilelile la Tz
WG0Nnc9.jpg



TNNNyYI.jpg




-------Kwahivyo punguza kiherehere, reli yenu ni replica ya ile ambayo Yepi washajenga kule Ethiopia! mambo ya best in Africa sahau, maybe if Tz was the only country in Africa.







Bonus

National_Railway_Network_of_Ethiopia.png
Unaweza compare na Chinese sgr ya Ethiopia tooo with pics?
Tuone nani constructor wa maana
 
Kadanganye wajinga.
Your cost is more like $4.5m per km..

Your SGR has a capacity of only 17million tonnes p.a



If your railway can achieve 250km/hr, It would have been said that the design speed of the railway is 250kmm/hr.... But they did not say that, they said maximum 160km/hr... I mean why even do 160km/hr if you can do 250km/hr? fikiria bana! Anyone who tells you that the speed can be increased to 250km/hr at no cost is lying to himself and to you... This is not some passenger dedicated rail service, your rail will be 95% freight oriented.


Alafu kama ulikua hujui, Yepi Markezi wanajenga reli ya 392km Awash-Weldiya SGR which is even cheaper than Tz-SGR

Alafu hio cladding waliotumia kujenga stesheni za Tanzania (nje ya Dar station) naona ni io hio ndo design wametumia kujenga kule Ethiopia

RMYhwUI.png


06-1-768x533.jpg



Hio reli ambayo Yepi wanajenga huko Ethiopia, wako 50 Months behind Schedule kama vile TZ, Sijui shida yao ni nini hawa jamaa, they need to consult another time-keeping god!

iu


iu

IZAXAJw.jpg



OiLxIhy.jpg

kfQwFVW.jpg

twNwIk0.jpg


FlbTx4x.jpg



Inside one of the stations
BsRsIfT.jpg


mMpeDq2.jpg



Bogi la kutembeza wanahabari ni kama lilelile la Tz
WG0Nnc9.jpg



TNNNyYI.jpg




-------Kwahivyo punguza kiherehere, reli yenu ni replica ya ile ambayo Yepi washajenga kule Ethiopia! mambo ya best in Africa sahau, maybe if Tz was the only country in Africa.







Bonus

National_Railway_Network_of_Ethiopia.png
Ya Ethiopia ni bora zaidi ya Kunyaland at every aspect!
 
Unaweza compare na Chinese sgr ya Ethiopia tooo with pics?
Tuone nani constructor wa maana
Hio ya Yepi haijamalizwa wakati ile ya China inafanya kazi, kwahivyo itakua unfare ku compair working railway with one that still U/C....
Yepi was supposed to finish their line back in 2016, they have yet to complete the railway as we speak!
 
Hio ya Yepi haijamalizwa wakati ile ya China inafanya kazi, kwahivyo itakua unfare ku compair working railway with one that still U/C....
Yepi was supposed to finish their line back in 2016, they have yet to complete the railway as we speak!
Na haitawahi tokea comparison ya electrical SGR vs diesel SGR, never ever on earth.
 
SGR yetu ni ya kiwango cha hali ya juu sn yn kila siku inavyozidi kuisha waturuki wanazidi kutushangaza, wallahi JPM alikuwa na nia thabiti na nchi yake, yn hii SGR ni haijawahi kuwepo Africa, ni Europe standard.
Huwa anasumbuliwa na wivu pamoja na chuki.

Hivi unadhani wanapenda Tanzania kujenga SGR tena ya umeme halafu wao wamejengewa ya diesel yaani upgraded MGR [emoji23][emoji23][emoji23]
 
Back