Ujenzi upo asilimia ngapi sasa???
Construction is expected to start in October 2018 at an estimated total cost of US$2.5 billion. The Isaka–Rusumo section, measuring approximately 371 kilometres (231 mi) of relatively flat terrain in Tanzania, will cost a total of US$942 million. The more mountainous Rusumo–Kigali section in Rwanda, measuring approximately 150 kilometres (93 mi), will cost a total of US$847 million. Burundi has put its standard gauge railway project on hol
Construction is expected to start in October 2018 at an estimated total cost of US$2.5 billion. The Isaka–Rusumo section, measuring approximately 371 kilometres (231 mi) of relatively flat terrain in Tanzania, will cost a total of US$942 million. The more mountainous Rusumo–Kigali section in Rwanda, measuring approximately 150 kilometres (93 mi), will cost a total of US$847 million. Burundi has put its standard gauge railway project on hol