Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Tanzania to invite tenders for SGR to connect Rwanda, DR Congo
TUESDAY MARCH 3 2020


Passengers at the Nairobi SGR terminus. Tanzanian President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR. PHOTO | FILE | NATION MEDIA GROUP
In Summary
President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR that will connect to the two neighbouring countries.
ADVERTISEMENT


By XINHUA
More by this Author
The government of Tanzania has said it is in final touches of inviting international tenders for the construction of a standard gauge railway (SGR) from Isaka dry port to neighbouring countries of Rwanda and the Democratic Republic of Congo (DRC).
"Tenders for the construction of the SGR project to Rwanda and DRC will be announced anytime from now," said Hassan Abbasi, chief government spokesperson and permanent secretary for the Ministry of Information, Culture, Arts and Sports.
He told a news conference in the capital Dodoma on Sunday that President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR that will connect to the two neighbouring countries.
Abbasi said construction of the SGR from the commercial capital Dar es Salaam to Morogoro covering about 200 kilometers has reached 75 percent, adding that construction of the SGR from Morogoro to Makutopora in Dodoma has reached 28 per cent.
"Tanzanians will this year begin enjoying travelling in electric trains plying on SGR," said Abbasi, adding that the government has until now spent about Tsh2.957 trillion (about $1.3 billion) on construction of the SGR.
He said permanent secretaries from the country's ministries will next week spend two days inspecting progress made.

Kuna watu watakimbia humu!
 
Umemjibu vizuri sana, huwa nashindwa kuelewa some fellas ambao kazi yao ni kupinga kila kitu hata vitu vya muhimu kama strategic infra projects. Miradi kama hio ikifanyika nchi jirani same people watashnagilia na kusema tunaachwa mbalo kwanini hatujengi.

Kuna wengine walisema kwanini tunatumia hela za ndani badala ya kukopa ktk ujenzi wa miradj mikubwa, haya sasa tumepata mkopo kwa kazi hio the same fellas wanasema kwanini tunakopakopa deni la taifa linaku kubwa🙂
Bro, some fellas really have no idea of what they do talk about. Watu kama hao ni kuwaacha tu na ma-negativity yao.

Sent using Jamii Forums mobile app
 
Mahitaji ni mbili, zinajengwa mbili. Pugu zinatakiwa tatu, zimejengwa tatu mzazi. Kuhusu flatness ni design inayosmua wapi tuta (dyke) liwe elevated na wapi liwe low kwa kuzingatia gradient requirements.

Kuhusu quality hatuhitaji mjadala. Unataka fananisha European product na ipi mkuu?
Inakaa cheap sana,
Flat kama lami,
Passing tracks Kwa stations mbili pekee!!!!!

Sent using Jamii Forums mobile app
 
88177380_1096350817381284_4619889264228827136_o.jpg
 
Tanzania to invite tenders for SGR to connect Rwanda, DR Congo

TUESDAY MARCH 3 2020


Passengers at the Nairobi SGR terminus.

Passengers at the Nairobi SGR terminus. Tanzanian President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR. PHOTO | FILE | NATION MEDIA GROUP

In Summary
  • President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR that will connect to the two neighbouring countries.

XINHUA

By XINHUA
More by this Author
The government of Tanzania has said it is in final touches of inviting international tenders for the construction of a standard gauge railway (SGR) from Isaka dry port to neighbouring countries of Rwanda and the Democratic Republic of Congo (DRC).

"Tenders for the construction of the SGR project to Rwanda and DRC will be announced anytime from now," said Hassan Abbasi, chief government spokesperson and permanent secretary for the Ministry of Information, Culture, Arts and Sports.

He told a news conference in the capital Dodoma on Sunday that President John Magufuli had already given directives on construction of the Mwanza-Isaka SGR that will connect to the two neighbouring countries.

Abbasi said construction of the SGR from the commercial capital Dar es Salaam to Morogoro covering about 200 kilometers has reached 75 percent, adding that construction of the SGR from Morogoro to Makutopora in Dodoma has reached 28 per cent.

"Tanzanians will this year begin enjoying travelling in electric trains plying on SGR," said Abbasi, adding that the government has until now spent about Tsh2.957 trillion (about $1.3 billion) on construction of the SGR.
He said permanent secretaries from the country's ministries will next week spend two days inspecting progress made.

In November 2019, Magufuli had said the governments of Tanzania and Rwanda were in final touches of negotiations to construct the SGR from the Isaka dry port in Tanzania to Rwanda.

He said feasibility studies for the SGR linking Tanzania and Rwanda have already been undertaken, adding that the two countries were now looking for financiers of the project.

Trade and Development Bank, a trade and development financial institution in Africa, said in November 2019 it had approved a $1 billion soft loan to Tanzania for implementation of infrastructure projects, including the construction of the SGR.

Tanzania to invite tenders for its SGR

CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096
 
HAhaha mbona unaanzisha kitu unajua hauwezi shinda!

Alafu BTW, Kila station iko na 2 ramps, one for disabled people and another one for heavy language ambapo hata pickup inaweza kutumia kupanda hadi hapo juu
the thing is still not friendly unless all disabled in Kenya have motorized wheel chairs! I dont see the essence of putting all those stairs! no wonder the station is growing grass about time u allow cattle to graze over there!
 
Back
Top Bottom