Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Ndio hii double track SGR ya Nigeria iliyoanza testing juzi. Imejengwa na Wachina. Nataka kusikia ng'ombe za Kitanzania zikicheka SGR ya Nigeria.


garimoshi la Nigeria ni kama "lenyu" tena in less than a month lime-break down tayari! Kenya and Nigeria r birds of the same feathers!

 
garimoshi la Nigeria ni kama "lenyu" tena in less than a month lime-break down tayari! Kenya and Nigeria r birds of the same feathers!


Wewe ni mbumbumbu hata hujui kuwa Nigeria wana Sgr rail mbili. Moja ya Abuja-Kaduna ambayo iluzinduliwa hata kabla ya Sgr ya Kenya kuzinduliwa na Lagos-Kano ambayo bado haijazinduliwa na testing ndio imeanza juzi. Naona hujui lolote kuhusu Nigeria. Wewe uko obsessed na Kenya tu.
 
garimoshi la Nigeria ni kama "lenyu" tena in less than a month lime-break down tayari! Kenya and Nigeria r birds of the same feathers!


Unamaanisha nini eti imebreak down in less than a month na Abuja-Kaduna rail ni nzee hata kushinda ya Kenya? Hii ilizinduliwa July 2016.
 
Unamaanisha nini eti imebreak down in less than a month na Abuja-Kaduna rail ni nzee hata kushinda ya Kenya? Hii ilizinduliwa July 2016.
Wacha ujinga the said trains have few months


 
Former Minister of Transportation, Rotimi Amaechi. [PHOTO CREDIT: Official twitter page of Rotimi Amaechi]
Former Minister of Transportation, Rotimi Amaechi. [PHOTO CREDIT: Official twitter page of Rotimi Amaechi]

Amaechi apologises for Abuja-Kaduna train breakdown​

The minister made the plea on Monday at the Moniya rail station during the routine inspection of the ongoing rail project in Ibadan.​

By
Agency Report

November 24, 2020
2 min read


The Minister of Transportation, Rotimi Amaechi, has apologised to Nigerians for the breakdown on the Abuja-Kaduna rail locomotives which occurred between November 18 and 20.

The minister made the plea on Monday at the Moniya rail station during the routine inspection of the ongoing rail project in Ibadan.

“I want to apologise to Nigerians over what happened at the Abuja-Kaduna rail station.

“We now have new locomotives and we have called the Chinese because we never expected the mechanical fault at this early stage.

“On behalf of the Federal Government, the ministry and the Nigerian Railway Corporation (NRC), we apologise to Nigerians and I have instructed the NRC to fix it or invite the Chinese.

“If this is happening now, then they should bring back our old locomotives, it will just affect turnaround times because we get the new locomotive to increase the turnaround time,” he said.

Mr Amaechi called for an increase in the pace of work by the China Civil Engineering Construction Corporation (CCECC) adding that COVID-19 pandemic was no longer an excuse.

The minister said although the CCECC were doing well, they need to increase their pace to enable the ministry to deliver the project on schedule.

The Permanent Secretary, Federal Ministry of Transportation, Madeleine Ajani, said there was significant improvement in the ongoing work from what it was in October.

Mrs Ajani said the ministry was not shifting their date of the commissioning but would rather put more pressure on the CCECC to enable them achieve their targets.


She explained the need for Lagos to have a standard gauge train due to the population, adding that the train would move from Lagos to Ibadan in less than one and half hours,

Mrs Ajani said that the establishment of the standard gauge railway would also decongest both the road transportation and movement of cargo from the ports while people living in Ibadan could come and work in Lagos on a daily basis.

The Managing Director, Nigeria Railway Corporation, Fidet Okhiria, said there was improvement in the construction output by the contractors adding ”hopefully by December some of the stations would be completed’’.

“We also need to have more stations so that passengers will not need to wait for the train to leave Ebute-Meta Station before getting to Agege station which means that the two trains can be in a section.

“This can be done with the help of signal and communication hence trains should be able to communicate with trains as well as stations should be able to communicate with stations simultaneously.

“The delay in the rail construction along Apapa ports corridors is due to the Oando pipeline along Apapa corridor,” Mr Okhiria said.

He disclosed that the train would start operating from Lagos to Moniya in Ibadan by December 7.

According to Mr Okhiria, 24 coaches, four passenger locomotives, nine freight locomotives and shunting locomotives had arrived Lagos while two of the freight locomotives would be transferred to Warri for a project.


 
upcoming Dodoma SGR station
EdE7iYFXYAArKJm
 
The Geza meat consortium pledges to kuzinduwa 10 meter guage train to subawanga meat plant.
 
In Tanzania, all people through whose land the SGR passed were properly and generously compensated. I have live examples of this.
cost of Kenyan rail is high because unlike Tanzania and Ethiopia where land is under government, land is owned by individuals and must be compensated. A good example is lamu port where the feasibility study was done back in 2011 but took 4 years for compensation to be completely done.
 
In case you missed it:

THe CEO Mr geza will be holding a press conference in dodoma before catching aplane heading to genzhu in China.
The press is having today is to literate his full commitment he has put in place to make geza kiti mtu meat processing plant in subawanga the best investment in region.

With the exclusive license his is acquiring, ndanganyass should be eating kiti mtu products.
 