Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Kama wenyewe kwa wenyewe hamjui vilivyoagiziwa ni vipi Sasa mnatarajia sisi tuwaone vipi? Afadhali mtulie nyinyi mpaka vitu vifike ndo muanze kuongea manake mkiongea sana na hakuna kilichowasili mtatuchokesha hadi vikifika itakua ni kama mlikua navyo tokea miaka miwili iliopita...
Subiri sindano iingie...
 
bombardier ‘s double decker.. najipostia tu[emoji23][emoji23][emoji1241]
IMG_0869.jpg
 
watch the video idiot! i gave u the link!

Old photos

Ruvu electrical SGR station!
2415679_Screenshot_2020-05-31_09.44.37.png



Ngerengere electrical SGR station
2415687_Screenshot_2020-06-02_07.49.57.png



Morogoro electrical SGR station
View attachment 1879051



E7kKTafX0AUMFNU


Hapo sijaona reli iki branch from the passenger station kwenda kwa hio so called container yard, Alafu umesahau reli yenu ni Electrical, hizo line za reli hapo zote zitakua na nyaya za stima juu yake kwahivyo hapo hawawezi kutumia cranes kushukisha mizigo, tofauti na kama pale kwala dry port ambapo watatumia shunting ya Diesel ndo itapeleka treni kupakia mizigo kwa container yard.


2868531_sgr_Morogoro.png


E7kKTafX0AUMFNU
 
Approaching Mombasa via Dongo-Kundu Bypass, That section is very epic, especially when the road meets the massive SGR bridges

20210728_114653-jpg.1870521


20210728_114731-jpg.1870526


20210728_114744-jpg.1870528


20210728_114758-jpg.1870532


20210728_114854-jpg.1870558


20210728_114855-jpg.1870557

20210728_114904-jpg.1870561


20210728_115059-jpg.1870577


20210728_114952-jpg.1870564

20210728_120018-jpg.1870599
Hii barabara Mchina aliwafinya pia!

Hole cracks open on Mombasa's Sh5.2bn Port Reitz road​

the-star.co.ke/news/2018-09-27-hole-cracks-open-on-mombasas-sh52bn-port-reitz-road
A gaping hole on the new Sh5.2 billion Port Reitz - Moi International Airport access road. /ANDREW KASUKU
A gaping hole on the new Sh5.2 billion Port Reitz - Moi International Airport access road. /ANDREW KASUKU
A contractor has repaired a gaping hole on the Port Reitz-Moi International Airport access road.

The Sh5.2 billion road has been in use for less than a year.

Part of road caved in last Sunday, causing residents to raise questions about quality.

The road, co-funded by the British government through Trademark East Africa and the Kenyan government, was officially opened by President Uhuru last year.


On Thursday, Kenya National Highway Authority (KeNHA) Coast regional direct Jared Makori said underground water had caused the collapse of the road built by Chinese contractor China Wu Yi.

Makori said no extra cost was incurred as the road is still under defect liability period.



DcsEFsXW0AAKQ-H




Roads agency closes key Mombasa bypass over cracks​

Monday, July 13, 2020
bypass.jpg

The Dongo Kundu bypass. PHOTO | WACHIRA MWANGI | NATION MEDIA GROUP
logo (9)
By Wachira Mwangi

What you need to know:​

  • The temporal closure of the road started at 7pm on Sunday evening and motorists have been advised to use the Miritini-Kwa Jomvu-Mombasa road as an alternative route.
  • Most affected will be the access of the Mombasa Standard Gauge Railway (SGR) Miritini station given that the train services resume today morning.
The Kenya National Highways Authority (KeNHA) has closed a section of the Mombasa Southern bypass for two days, as part of the new road infrastructure touching on Moi International Airport developed cracks.

In a statement, the Authority warned motorists of temporary closure of the Miritini- Mwache-Kipevu road for period of 48 hours to allow for necessary monitoring and further engineering interventions.

“A limited section of the cut slope along the said road and adjacent to the Moi International Airport fenceline has been observed to exhibit movement as a result of previous moisture ingress and unfavourable subsurface conditions,” read the statement from KeNHA Director General Peter Mundinia.

The temporal closure of the road started at 7pm on Sunday evening and motorists have been advised to use the Miritini-Kwa Jomvu-Mombasa road as an alternative route.

Most affected will be the access of the Mombasa Standard Gauge Railway (SGR) Miritini station given that the train services resume this morning.

KeNHA, through its Assistant Director of Corporate Communications Charles Njogu, noted that the Moi Airport is also experiencing a similar phenomenon on slopes away from the road construction.

“Seems like a geological phenomenon over a wide cross section. Our engineers have moved to site this evening. Traffic at the section port bound has been diverted to one lane over a section of 800 metres,” Mr Njogu said.

The cracks have been at the road section for over three weeks.

Nation. Empower Africa.​


Roads agency closes key Mombasa bypass over cracks
 
Back
Top Bottom