Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

The first SGR cable stayed overpass in the whole of East and central Africa

2885617_IMG_20210817_074711_129.jpg


courtesy: The best 007
 
Riding high: Prasa’s ‘useless’ engines find new purpose up north

TD_G6bo8K_dfZ2XfnZoTcJ3z-no8XaqE-oOhV9Yr4VsoHPK4jiI_5Y9JHfGnoVvPg8wjvzFddwzzYD04aSkhsDbdWC6bTeGZa6Y=s750



There is a happy ending for some of the leading characters in the famous “too tall” locomotive saga that cost the Passenger Rail Agency billions of rand and hastened the demise of SA’s long-distance passenger trains.

Six of the Spanish-built AFRO 4000 locomotives that were found to be too high for parts of SA’s rail network are now working flat-out on freight trains for a private operator on the 1,400km Tazara Railway that runs between Tanzania and Zambia.

James Holley, CEO of private locomotive operator Traxtion, which bought the seven engines at auction in 2019, said the locomotives were already proving to be a success.

“Apart from some electrical issues, none of which caused train failure, they have been performing very well,” he said.

Traxtion, a well-established rail business that supplies locomotives, crews and rail services to South African industry and state-owned railway companies in Africa, has a concession to generate freight traffic for another third-party private operator on the Tazara.

Funded and built by China in the late 1970s, the Tazara — also known as the “Uhuru” or Freedom Railway — has long struggled to be viable.

Now, with private operators attracting new freight, the line is finally earning money from the access fees paid by private operators, Holley said.




MY TAKE
TAZARA operations r not left behind...!
 
pale mkunya anapojifanya kipofu wakati hamna station hata moja kule Kunyaland yenye dedicated cargo terminal! That SGR station is to have 5 rail tracks one for each terminals i.e. cargo and passenger and 3 for passing trains!


View attachment 1894308


View attachment 1894309


View attachment 1894311
Haujawahi kuona haya mambo ndo maana bado uko na ushamba navyo, vile ilivyo hapo kwa picha, only one track (hio ya Kwanza) ndo inaweza kutumika kushukishwa mizigo kutoka kwa reli , hizo track za katikati haziwezi kutumika kushukisha Wala kupakia mizigo.
Ningesema labda kue na gantry crane ambayo itakua inabeba contena juu kwa juu from any track but Kuna nyaya za stima juu ya kila reli so that's not possible...
 
Ruvu's marshalling yard
E8vYtf9WUAAuRZb




2881354_IMG_0500.jpg








VS


SGR Kenya's Kilindini Marshalling yard!
DgDicK9WAAA6xl5









MY TAKE
yajayo yanafurahisha

Hehe, Mombasa port handles double your cargo and you have the audacity to even imagine that your marshaling yard is bigger than ours, wah!? Kwanza unajua Marshalling yard Mombasa ni mbili? The one with red gantry cranes belongs to CRBC it is like 1 km away from the port, but there is another one with blue gantry cranes that belongs to KPA...


Alafu isitoshe, hapo kwa picha za Tz umetuonyesha tracks leading to Ruvu marshaling yard, haujaonyesha the actual yard where containers will be loaded or unloaded from....as opposed to the Kenyan pics ambapo umeonyeshesha the actual yard - Yani pale contena zinashukishwa au kupandishwa
 
Haujawahi kuona haya mambo ndo maana bado uko na ushamba navyo, vile ilivyo hapo kwa picha, only one track (hio ya Kwanza) ndo inaweza kutumika kushukishwa mizigo kutoka kwa reli , hizo track za katikati haziwezi kutumika kushukisha Wala kupakia mizigo.
Ningesema labda kue na gantry crane ambayo itakua inabeba contena juu kwa juu from any track but Kuna nyaya za stima juu ya kila reli so that's not possible...

Kwahiyo only gantry ndo inafaa? Reach stacker je? Kumbuka hiyo si port au dry port!
800px-Kalmar_Peinemann_reach_stacker.jpg



Flat-rack-small-vessel.jpeg


At Naivasha dry port, i see reach stacker too and no single gantry crane! 👇 👇 👇👇👇👇




At all electrical SGR Tanzania's cargo terminals kumewekwa mpaka ramp read to load and load yaani kiufupi unaweza kushusha au kupandisha gari toka kwenda wagon car bila kuhitaji gantry crane au reach stacker!
2883788_Screenshot_2021-08-16_11.05.35.png





MY TAKE
Mchina wa first class kwa Mkunya hakukumbuka facilities kama hizi!
 
[emoji23][emoji23]afadhar umeleta hio picha ya mwisho ili aelewe nilichomweleza.. jamaa anajikuta mjuaji kwa kuielezea sgr system yao kwa sgr system yetu[emoji23]
mchina kawapiga afu kawadanyanga eti ni chinese class one.. mpk leo wanaamin hivyo[emoji52]
roho inamuuma ile first class yao haina vitu kama hivi yaani hapa SGR Tanzania itabeba mpaka livestocks! Yaani wanapanda kwenye mabehewa wanapelekwa sokoni/mnadani/machinjioni!
 
1. Dar es Salaam passenger station only
IMG_0926.jpg



2. Pugu passenger & freight station
IMG_0996.jpg

IMG_0997.jpg

IMG_0998.jpg



3. Soga passengers station only
IMG_0999.png



4. Ruvu passenger & freight station
IMG_1001.jpg

IMG_1002.jpg

IMG_1004.jpg



5. Ngerengere passenger & freight station
IMG_1005.jpg

IMG_1006.jpg

IMG_1007.jpg



6. Morogoro passenger & freight station
IMG_1008.jpg

IMG_1009.jpg

IMG_1010.jpg


SIMPLE & CLASSIC

In each passenger & freight station, there’re five lines (tracks).. and each electric pole will serve two lines
 
[emoji23][emoji23]afadhar umeleta hio picha ya mwisho ili aelewe nilichomweleza.. jamaa anajikuta mjuaji kwa kuielezea sgr system yao kwa sgr system yetu[emoji23]
mchina kawapiga afu kawadanyanga eti ni chinese class one.. mpk leo wanaamin hivyo[emoji52]
Twende nao taratibu, wenzetu hawa bado ni washamba wa reli na treni ya umeme, kwahiyo hawajui mambo mengi mno kuhusu electrical SGR, so twende nao taratibu mkuu wataelewa kdg kdg hvyo hvyo kwa kupenda kujifanya wajuaji.
 
Back
Top Bottom