Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

A stretch of 1km of land reclaimed halafu una-brag? hebu ficha aibu Ruvu marshalling yard inaunganisha a cargo train of over 2 km! Na size as total square km-wise haina comparison south of sahara!
Excuses mingi tuu

Nairobi ICD and Mombasa SGR yard were both built and equipped, much bigger and complicated stations in Kenya within the same 3 years

Does your biggest rail marshalling yard surpass the extra 150km that Kenya built in the longer SGR distance?
 
Excuses mingi tuu

Nairobi ICD and Mombasa SGR yard were both built and equipped, much bigger and complicated stations in Kenya within the same 3 years

Does your biggest rail marshalling yard surpass the extra 150km that Kenya built in the longer SGR distance?
Kuna marshalling yard isio na railtracks? BTW angalia how another massive marshalling yard ya Chamwino Dodoma inavyokaa! Huku ukisubiria ya Fella kule Mwanza!
 


SGR lots scorecard Tanzania vs Kenya

ilianza
Tanzania 0 : 1 Kenya

Ikaja Tanzania 0 : 2 Kenya

Ikaja Tanzania 1 : 2 Kenya

Halafu
Tanzania 2 : 2 Kenya (equalizer)

Then

Tanzania 3 : 2 Kenya (pindua meza kibabe! )

So far SGR lots scorecard inasoma

Tanzania 4 : 2 Kenya

By August 2022 itasoma

Tanzania 5 : 2 Kenya

CC: Tony254 n all other naysayers from Kenya!
 


SGR lots scorecard Tanzania vs Kenya

ilianza
Tanzania 0 : 1 Kenya

Ikaja Tanzania 0 : 2 Kenya

Ikaja Tanzania 1 : 2 Kenya

Halafu
Tanzania 2 : 2 Kenya (equalizer)

Then

Tanzania 3 : 2 Kenya (pindua meza kibabe! )

So far SGR lots scorecard inasoma

Tanzania 4 : 2 Kenya

By August 2022 itasoma

Tanzania 5 : 2 Kenya

CC: Tony254 n all other naysayers from Kenya!

Hivi kipande cha Makutopora -Tabora ni mkopo toka wapi?
 
2022 na nikienda Danganyika land bado siwezi panda treni ya SGR nisafiri [emoji23][emoji23][emoji23] CCM ni chama cha mafala.
 
KORAIL wins contract for feasibility study for Tanzania railway education center construction project

Lee Jun-sung 승인 2021.12.31 08:53 댓글 0

KORAIL.jpg
Headquarters of KORAIL / Courtesy of KORAIL
출처 : Korea IT Times(http://www.koreaittimes.com)

Korea Railroad Corporation (KORAIL) announced on December 30 that it had won a feasibility study service for the Tanzania Railway Education Center construction project ordered by the Export-Import Bank of Korea.

This project is a service to confirm the feasibility of establishing a railway operator training institute to complete the 1,219km central line railway construction project, which is being promoted by the Tanzanian government on the largest scale in East Africa.

KORAIL, the organizer of the consortium, plans to conduct a feasibility study for about 7 months from January 2022.

KORAIL decided to take this service as an opportunity to introduce Korea's railroad technology, and to present an educational system and educational content development direction tailored to the current situation of railroads in Tanzania.

"We will do our best so that KORAIL's world-class railroad talent development center operation know-how and railroad education contents can serve as a cornerstone for nurturing train talents in Tanzania," said Park Tae-hoon, head of KORAIL's overseas business division.

Meanwhile, KORAIL is successfully carrying out the "Tanzania Central Line Railway Construction Supervision Project", which it won in 2017.

“This is an opportunity for KORAIL to pass on advanced railroad education to the African continent beyond Asia,” said KORAIL CEO Na Hee-seung.

저작권자 © Korea IT Times 무단전재 및 재배포 금지

출처 : Korea IT Times(Korea IT Times)

source:

KORAIL wins contract for feasibility study for Tanzania railway education center construction project
 
KORAIL wins contract for feasibility study for Tanzania railway education center construction project

Lee Jun-sung 승인 2021.12.31 08:53 댓글 0

Headquarters of KORAIL / Courtesy of KORAIL
출처 : Korea IT Times(Korea IT Times)

Korea Railroad Corporation (KORAIL) announced on December 30 that it had won a feasibility study service for the Tanzania Railway Education Center construction project ordered by the Export-Import Bank of Korea.

This project is a service to confirm the feasibility of establishing a railway operator training institute to complete the 1,219km central line railway construction project, which is being promoted by the Tanzanian government on the largest scale in East Africa.

KORAIL, the organizer of the consortium, plans to conduct a feasibility study for about 7 months from January 2022.

KORAIL decided to take this service as an opportunity to introduce Korea's railroad technology, and to present an educational system and educational content development direction tailored to the current situation of railroads in Tanzania.

"We will do our best so that KORAIL's world-class railroad talent development center operation know-how and railroad education contents can serve as a cornerstone for nurturing train talents in Tanzania," said Park Tae-hoon, head of KORAIL's overseas business division.

Meanwhile, KORAIL is successfully carrying out the "Tanzania Central Line Railway Construction Supervision Project", which it won in 2017.

“This is an opportunity for KORAIL to pass on advanced railroad education to the African continent beyond Asia,” said KORAIL CEO Na Hee-seung.

저작권자 © Korea IT Times 무단전재 및 재배포 금지

출처 : Korea IT Times(Korea IT Times)

source:

KORAIL wins contract for feasibility study for Tanzania railway education center construction project
Beautiful building
 
Yani ukigoogle 'Tanzania SGR' picha ya kwanza ni ya SGR ya Kenya [emoji23][emoji23][emoji23][emoji23]
Screenshot_20220111-200020.jpg
 
Back
Top Bottom