Dubai yasema iko tayari kutoa $6 Bilion (Tsh. 15T) kujenga Reli ya Kenya, Uganda na DRC kwa sharti la kuwa na mgao mkubwa Mombasa Port

Dubai yasema iko tayari kutoa $6 Bilion (Tsh. 15T) kujenga Reli ya Kenya, Uganda na DRC kwa sharti la kuwa na mgao mkubwa Mombasa Port

Shida za forex Kwa Sasa ni pamoja na hayo madeni na pia mikopo haipatikani kirahisi Kwa Nchi Maskini ambazo ziko na risk kubwa.

Mwaka Jana Serikali imeshindwa ku meet obligation za kibajeti Kwa sababu haikuweza ku secure mikopo na misaada waliyotarajia.
Watawala Wanapoiba pesa za umma Kisha wakawaita Wageni na kuwapa rasilimali zetu Ili wafidie pesa walizoiba nadhani ni jambo lisilofaa kabisa . Hawa wanatakiwa wakutane na Kizazi kipya kisichokubali kushangilia Wezi . Hawa ni Wezi waliojificha NDANI ya CCM wanashirikiana na wageni kuiba Mali za umma bila Huruma.

Hakuna cha kuwafanya na ndivyo wanavyoamini . Zito Kabwe amelaani Mapinduzi ya Níger lakini hakuwahi kulaani Shida za Wanaiger WENGI.
Mapinduzi yanawaumiza wachache na kuwanufaisha WENGI lakini pia yanajenga usawa na Haki Kwa wote. Kuna wakati Wanasiasa Wanajisahau na kujiona kuwa wao ni miungu na Kila jambo Jema wameumbiwa wao na familia zao.
Mapinduzi yanawakumbusha watawala wahuni kuwa Dunia hii sio Mali Yao.

Mfano kule geita kuna MTU anajiona kiwa Jimbo Fulani ni Mali yake . Yuko tayari kumuua yeyote alimradi Jimbo kubaki kwake na chama chake . Ana pesa za kuwahonga wasimamizi Wa Sheria na kuajiri wauaji. Wakati huo huo haoni wizi unaofanywa na wawekezaji Wa Madini kutorosha Madini mchana na usiku. Sasa watawala Wa CCM Karibu Kila eneo Kwa Sasa wanaiba fedha kumiliki majimbo na uhuni mwingine. Nchi inageuka kuwa pango la wanyanganyi hakuna Tena usawa Wala siasa safi zaidí ya uhuni. Zito kabwa haoni uhuni huo Kwa sababu ananufaika yeye. Uwekezaji Wa kihuni ndio unaowanufaisha Wageni na kushirikiana na Wanasiasa kutorosha Mali za umma matokeo yake nchi nyingi zenye rasilimali Afrika Nzima zinaelekea kuingia kwenye vita . Sasa Majeshi yatakua yana kazi Gani kama Wanasiasa watageuza nchi zao kuwa eneo la Waporaji. Je,Wanajeshi wanagapi watabaki na Umaskini mkubwa Kwa kuwalea Wanasiasa !
Jeshi Kwa Mfano Lina askari laki moja . Karibu askari elfu tisini wanatoka kwenye familia Maskini kabisa . Wanabaki kuwalinda Wezi wasiojali mustakabali Wa Vizazi vijavyo . Hapo utalaumu vipi Jeshi la Niger?
 
Ccm sijui akili mmeziweka wapi, sasa mkataba wa hovyo namna hiyo una faida gani?

Bora hata kwa Kenya wanataka share kubwa, hapa kwetu wanapewa bure kabisa, bandari zote.

Hakuna mahali mkataba wa dpw unaekeza kuwa wataweka ntaji wa sh. Ngapi
 
Ccm sijui akili mmeziweka wapi, sasa mkataba wa hovyo namna hiyo una faida gani?

Bora hata kwa Kenya wanataka share kubwa, hapa kwetu wanapewa bure kabisa, bandari zote.

Hakuna mahali mkataba wa dpw unaekeza kuwa wataweka ntaji wa sh. Ngapi
Hao sio ..nao wamekopa duniani waje wawekeze. Wapo nasdaq..hivyo wakiona namna gani wanatutandika na kesibyabtrilioni 27 au tuwaachie nchi yote
 
Mkuu utaumiza kichwa bure hao wapingaji humu co wafanyabiashara Wala hawajawahi kutumia bandari ww usitumie nguvu kubwa kuwaaminisha ndio wakati wao wanaamini sio !
We bandarini ulipotisha nini na ulipata changamoto gani zinazokuja kutatuliwa
 
Baada ya China Kughairi kutoa pesa ya mkopo kujenga reli ya kulinganisha Nchi za Kenya,Uganda na DRC ,UAE Kupitia Dubai wamesema wako tayari kutoa Trilioni 15 kujenga reli hiyo Kwa Sharti kwamba wapewe share kubwa ya uendeshaji wa Bandari ya Mombasa.

Haijajulikana kama Serikali ya Kenya imekubaliana nao au hapana.


My Take
Tanzania tukivunga na kuleta mabishano yasiyo na Tija wenzio wanachangamkia fursa.

Siku inakuja ambayo Bandari ya Dar itakuwa tembo mweupe.

Kwa Mwarabu Kila Nchi ya Dunia itaoiga goti maana hao ndio wenye pesa Kwa Sasa.

----

Uganda and Kenya are seeking at least $6 billion from multiple lenders to jumpstart construction of the joint standard gauge railway (SGR) project, which stalled after the pull-out of the initial financier, China.

Last week, the two partners announced their intention to start construction of the line by December this year to improve flow of cargo and make the Northern Corridor competitive against Tanzania’s Central Corridor.

Transport ministers from the two states signed a deal to finalise a joint resource mobilisation drive in the next four months that will fund the railway line from Naivasha to Malaba to Kampala and from Kampala to Kasese to Mpondwe near Congo, with a branch line from Bihanga to Mirama Hills, near Rwanda.

Once the project is completed, goods from Mombasa to the Ugandan border with DRC, to Rwanda and South Sudan will be ferried by rail.

Now, the Northern Corridor partner states have tasked Kampala and Nairobi to ensure the project is on track.

In Kampala’s plan, the first phase will be Malaba-Kampala and the subsequent legs are supposed to be fast-tracked to link the capital with the borders of its neighbours DRC, Rwanda and South Sudan, to guarantee the project’s viability.

The search for financiers is on and Kenyan and Ugandan officials say financiers from Europe and the Middle East are being drafted into the project although they did not immediately name the targeted lenders.
Hunt for cash

During the announcement of the deal between the two governments in Mombasa on July 28, Kenya’s Transport Cabinet Secretary Kipchumba Murkomen said Nairobi has already done a feasibility study of the project.

“We are now going for financiers either from Europe or United Arab Emirates, or whoever comes with a good deal for our people in East Africa,” Murkomen said.

Kenya’s hunt for cash to build an extension of its SGR from Naivasha to Malaba may see it tie down related facilities, including the Port of Mombasa.

According to the people in the know, the UAE is being considered as a suitable candidate, as it has also offered to improve the port, the main gateway of goods destined for the Great Lakes region.

The EastAfrican has learnt that the UAE has dangled an offer to construct the line to Malaba as long as it is also allowed significant stake in the Port of Mombasa to operate.

Sources said Nairobi had not yet agreed to the deal, as there are political implications – akin to the now controversial Dubai deal with Dar es Salaam.

Yet frustrations over finding a suitable financier may see Nairobi go for UAE as Kenya continues to grapple with high debt, downgraded credit rating and a struggling economy.

Turkey deal

In Kampala, things are smoother, with Yapi Merkezi, the Turkish firm that was exclusively selected as contractor for the Kampala-Malaba line, having submitted its technical and financial bids to the SGR project, to lead towards evaluation, negotiation and contract signing, which is expected to be concluded by November 1.

Yapi Merkezi is also one of the companies building Tanzania’s 754km SGR line. The others are two Chinese firms – China Civil Engineering Construction Corporation and China Railway Construction Company – and Portugual’s Mota-Engil Africa.

"Uganda’s financial bid includes a proposal for a changed model of financing that brings on board a number of export credit agencies (ECAs)," officials said.

“The details on financing are with the Ministry of Finance. The financiers have made contact [with the ministry],” said Eng Perez Wamburu, SGR project coordinator, who confirmed that a number of ECAs have come together to bankroll the Ugandan section, which has been in limbo for years.

Finance Minister Matia Kasaija confirmed that some ECAs “have approached us,” but added that his ministry has also approached other financiers to come into the project during the later phases of development.

Kenya’s State Department of Transport has picked up the Uhuru Kenyatta government SGR plan, which proposed two phases at a cost of about $3.6 billion. The government intends to prioritise Phase 2B, from Naivasha to Kisumu estimated to cost $2.68 billion, while the last leg, 2C, from Kisumu to Malaba, will take another $896 million.

The Kenya-Uganda SGR line has a chequered history.

In November 2022, Uganda formally terminated its contract with China Harbour Engineering Company (CHEC) awarded in 2015, to build the first phase of SGR, a 273km stretch from Malaba to Kampala. The deal was tied to the contractor securing financing from China Exim Bank.

But after years of no progress with the Chinese, President Yoweri Museveni directed his officials in 2021 to open up the project’s financing and seek new lenders, pitching the viability of the railway connecting all the countries of the Northern Corridor.

At the back of the Chinese reluctance was doubt that Kenya would build its SGR – also funded by the China Exim Bank – all the way to Malaba, to link with the Uganda line. Kenya and Uganda have now both ditched Beijing.

Under pressure to tie up its end of the deal and clear the way for other Northern Corridor partner states to get their plans off the ground, Uganda has now set January 2024 as the tentative date for start of construction, Wamburu said.

The attention now turns to securing the required financing.

First off, the blocks were UK Export Finance (UKEF), which Ugandan officials approached in 2021 to consider financing the 273km Kampala-Malaba leg.

People familiar with the deal told The EastAfrican that UKEF will lead the project ECAs and provide the biggest chunk of financing, estimated at $2.6 billion, for the critical Kampala-Malaba section.

Contacted, the lender did not deny nor confirm its funding for the rail projects.

“We do not comment on speculation about potential transactions,” said Patrick Lillie, its press officer. “Previous speculation about loan requests and loan values did not originate from UKEF.”

Besides UKEF, European, Chinese and Middle East-based lenders are also understood to be in the picture, to provide loans that will help Uganda extend its SGR to Mpondwe at the border with DRC, Mirama Hills to connect with Rwanda and Elegu to South Sudan.

This corroborates what Gen Katumba Wamala and Kipchumba Murkomen said in the joint communiqué issued in Mombasa.

“The Republic of Kenya, the Republic of Rwanda, the Republic of South Sudan and the Republic of Uganda signed on 11th May 2014 and ratified the Standard Gauge Railway Protocol for the development and operation of the (SGR) connecting the Port of Mombasa to Kampala, Kigali and Juba,” said the communique.
Connecting to Rwanda

People involved in the project say that once the commercial contract for construction of the Malaba-Kampala section is signed, Kampala will embark on the next phase to extend the SGR to the DRC border, and to Bihanga-Mirama Hills to Rwanda.

“It’s our desire to have financing for the western route as soon as possible, but the reality is that we shall start seeking funds for Kampala-Kasese after signing the contract for the first phase this year,” an official who is not authorised to speak on behalf of the government told The EastAfrican this week.

Last week, Katumba and Murkomen noted that it was crucial for Uganda to ensure the SGR is extended to the border with Rwanda, South Sudan and DR Congo as soon as possible to improve the viability and attractiveness for financing.

Observers argue that the tight timelines suggest both governments are confident about reaching financial close this time round.
Indeed, in his budget speech for 2023/24, Finance Minister Kasaija said 49 percent of the right of way for the Kampala-Malaba SGR had been acquired and construction would commence this financial year and provided Ush535 billion ($146.7 million) as compensation for project-affected persons.

In 2014, Kenya, Uganda and Rwanda entered into a tripartite agreement to construct a railway from Mombasa through Kampala to Kigali.

Kenya built its line in two phases but abruptly terminated it in Naivasha after China declined to finance the last leg after failing to strike an agreement with Uganda and fearing that Kenya was also now saddled with too much debt.

In April 2019, then Kenyan president Uhuru Kenyatta went to Beijing hoping to secure $3.68 billion — in loans and grant — to take the SGR line from Naivasha to Kisumu and Malaba but China declined. Nairobi henceforth started looking for funds to upgrade the metre gauge railway segment as a priority.

The new administration of President William Ruto has rekindled the plans to complete the SGR project and Kampala is upbeat that this time it will not be derailed.
Lapsset railway line

Still, Kenya plans to link Mombasa and Lamu ports and Isiolo in the north with a modern railway line by end of June 2027. As per plans by the previous government, Kenya plans to build a $24.9 billion Lamu Port South Sudan-Ethiopia Transport (Lapsset) railway line to open up northern Kenya and connect Kenya with South Sudan and Ethiopia.

The planned line will move from Mariakani in Mombasa to Lamu then onward to Isiolo and Moyale, which borders Ethiopia.

Meanwhile, against steep competition from Tanzania’s Dar es Salaam port, Kenya has agreed with Uganda to increase the usage of rail to haul Uganda cargo using the SGR from Mombasa to Naivasha and the metre gauge line from Naivasha to Malaba border in coming months.

Uganda’s commitment is a relief for Kenya as it will shore up its rail revenues, crucial to repaying its loan with China. The SGR from Mombasa to Naivasha was financed by the Chinese at a cost of $4.7 billion.

Kenya signed a 15-year agreement “take or pay” loan with the Exim Bank of China where the Kenya Ports Authority undertook to “take” cargo on the new railway every year failure to which it would draw from its revenues to “pay” for the shortfall.

Kenya’s loan repayment to Exim Bank of China this financial year has jumped to $800 million, an increase of over 126 percent compared with the last financial year.

According to data from the Kenya National Bureau of Statistics for 2022, in the five years that the SGR has been in operation, it has generated $4.6 billion from cargo freight. Passenger trains generated $760 million over the period, indicating cargo is keeping it afloat.


Source: Uganda, Kenya seek funds in joint bid to take SGR to DRC
Haya masharti yanatofauti Gani na kuambiwa utapewa mihela kama utakubali wakunanihihiii............[emoji28][emoji28][emoji28][emoji28][emoji28][emoji28][emoji28] Changamkia fursa ila make Shure unavaaa kanga kabisa
 
Hatuhangaiki tatizo mkataba mbovu, haijalishi race yake
Kifupi . Hao ni Port and Free Zone World FZE. Na wamekopa large banks duniani. Nakumbuka Saaed Al Kazmi of Rothchild and co ndio financial advisor. Hii kitu ipo kwenye net. Kwa hiyo we are in deep shit indeed.
 
Tanzania tukivunga na kuleta mabishano yasiyo na Tija wenzio wanachangamkia fursa.

Siku inakuja ambayo Bandari ya Dar itakuwa tembo mweupe.

Kwa Mwarabu Kila Nchi ya Dunia itaoiga goti maana hao ndio wenye pesa Kwa Sasa
Mawazo ya kipumbavu sana haya.

Na kwa bahati mbaya tunao wapumbavu wengi waliojazana huko ndani ya serikali, sijui walifikafikaje huko?
 
Baada ya China Kughairi kutoa pesa ya mkopo kujenga reli ya kulinganisha Nchi za Kenya,Uganda na DRC ,UAE Kupitia Dubai wamesema wako tayari kutoa Trilioni 15 kujenga reli hiyo Kwa Sharti kwamba wapewe share kubwa ya uendeshaji wa Bandari ya Mombasa.

Haijajulikana kama Serikali ya Kenya imekubaliana nao au hapana.


My Take
Tanzania tukivunga na kuleta mabishano yasiyo na Tija wenzio wanachangamkia fursa.

Siku inakuja ambayo Bandari ya Dar itakuwa tembo mweupe.

Kwa Mwarabu Kila Nchi ya Dunia itaoiga goti maana hao ndio wenye pesa Kwa Sasa.

----

Uganda and Kenya are seeking at least $6 billion from multiple lenders to jumpstart construction of the joint standard gauge railway (SGR) project, which stalled after the pull-out of the initial financier, China.

Last week, the two partners announced their intention to start construction of the line by December this year to improve flow of cargo and make the Northern Corridor competitive against Tanzania’s Central Corridor.

Transport ministers from the two states signed a deal to finalise a joint resource mobilisation drive in the next four months that will fund the railway line from Naivasha to Malaba to Kampala and from Kampala to Kasese to Mpondwe near Congo, with a branch line from Bihanga to Mirama Hills, near Rwanda.

Once the project is completed, goods from Mombasa to the Ugandan border with DRC, to Rwanda and South Sudan will be ferried by rail.

Now, the Northern Corridor partner states have tasked Kampala and Nairobi to ensure the project is on track.

In Kampala’s plan, the first phase will be Malaba-Kampala and the subsequent legs are supposed to be fast-tracked to link the capital with the borders of its neighbours DRC, Rwanda and South Sudan, to guarantee the project’s viability.

The search for financiers is on and Kenyan and Ugandan officials say financiers from Europe and the Middle East are being drafted into the project although they did not immediately name the targeted lenders.
Hunt for cash

During the announcement of the deal between the two governments in Mombasa on July 28, Kenya’s Transport Cabinet Secretary Kipchumba Murkomen said Nairobi has already done a feasibility study of the project.

“We are now going for financiers either from Europe or United Arab Emirates, or whoever comes with a good deal for our people in East Africa,” Murkomen said.

Kenya’s hunt for cash to build an extension of its SGR from Naivasha to Malaba may see it tie down related facilities, including the Port of Mombasa.

According to the people in the know, the UAE is being considered as a suitable candidate, as it has also offered to improve the port, the main gateway of goods destined for the Great Lakes region.

The EastAfrican has learnt that the UAE has dangled an offer to construct the line to Malaba as long as it is also allowed significant stake in the Port of Mombasa to operate.

Sources said Nairobi had not yet agreed to the deal, as there are political implications – akin to the now controversial Dubai deal with Dar es Salaam.

Yet frustrations over finding a suitable financier may see Nairobi go for UAE as Kenya continues to grapple with high debt, downgraded credit rating and a struggling economy.

Turkey deal

In Kampala, things are smoother, with Yapi Merkezi, the Turkish firm that was exclusively selected as contractor for the Kampala-Malaba line, having submitted its technical and financial bids to the SGR project, to lead towards evaluation, negotiation and contract signing, which is expected to be concluded by November 1.

Yapi Merkezi is also one of the companies building Tanzania’s 754km SGR line. The others are two Chinese firms – China Civil Engineering Construction Corporation and China Railway Construction Company – and Portugual’s Mota-Engil Africa.

"Uganda’s financial bid includes a proposal for a changed model of financing that brings on board a number of export credit agencies (ECAs)," officials said.

“The details on financing are with the Ministry of Finance. The financiers have made contact [with the ministry],” said Eng Perez Wamburu, SGR project coordinator, who confirmed that a number of ECAs have come together to bankroll the Ugandan section, which has been in limbo for years.

Finance Minister Matia Kasaija confirmed that some ECAs “have approached us,” but added that his ministry has also approached other financiers to come into the project during the later phases of development.

Kenya’s State Department of Transport has picked up the Uhuru Kenyatta government SGR plan, which proposed two phases at a cost of about $3.6 billion. The government intends to prioritise Phase 2B, from Naivasha to Kisumu estimated to cost $2.68 billion, while the last leg, 2C, from Kisumu to Malaba, will take another $896 million.

The Kenya-Uganda SGR line has a chequered history.

In November 2022, Uganda formally terminated its contract with China Harbour Engineering Company (CHEC) awarded in 2015, to build the first phase of SGR, a 273km stretch from Malaba to Kampala. The deal was tied to the contractor securing financing from China Exim Bank.

But after years of no progress with the Chinese, President Yoweri Museveni directed his officials in 2021 to open up the project’s financing and seek new lenders, pitching the viability of the railway connecting all the countries of the Northern Corridor.

At the back of the Chinese reluctance was doubt that Kenya would build its SGR – also funded by the China Exim Bank – all the way to Malaba, to link with the Uganda line. Kenya and Uganda have now both ditched Beijing.

Under pressure to tie up its end of the deal and clear the way for other Northern Corridor partner states to get their plans off the ground, Uganda has now set January 2024 as the tentative date for start of construction, Wamburu said.

The attention now turns to securing the required financing.

First off, the blocks were UK Export Finance (UKEF), which Ugandan officials approached in 2021 to consider financing the 273km Kampala-Malaba leg.

People familiar with the deal told The EastAfrican that UKEF will lead the project ECAs and provide the biggest chunk of financing, estimated at $2.6 billion, for the critical Kampala-Malaba section.

Contacted, the lender did not deny nor confirm its funding for the rail projects.

“We do not comment on speculation about potential transactions,” said Patrick Lillie, its press officer. “Previous speculation about loan requests and loan values did not originate from UKEF.”

Besides UKEF, European, Chinese and Middle East-based lenders are also understood to be in the picture, to provide loans that will help Uganda extend its SGR to Mpondwe at the border with DRC, Mirama Hills to connect with Rwanda and Elegu to South Sudan.

This corroborates what Gen Katumba Wamala and Kipchumba Murkomen said in the joint communiqué issued in Mombasa.

“The Republic of Kenya, the Republic of Rwanda, the Republic of South Sudan and the Republic of Uganda signed on 11th May 2014 and ratified the Standard Gauge Railway Protocol for the development and operation of the (SGR) connecting the Port of Mombasa to Kampala, Kigali and Juba,” said the communique.
Connecting to Rwanda

People involved in the project say that once the commercial contract for construction of the Malaba-Kampala section is signed, Kampala will embark on the next phase to extend the SGR to the DRC border, and to Bihanga-Mirama Hills to Rwanda.

“It’s our desire to have financing for the western route as soon as possible, but the reality is that we shall start seeking funds for Kampala-Kasese after signing the contract for the first phase this year,” an official who is not authorised to speak on behalf of the government told The EastAfrican this week.

Last week, Katumba and Murkomen noted that it was crucial for Uganda to ensure the SGR is extended to the border with Rwanda, South Sudan and DR Congo as soon as possible to improve the viability and attractiveness for financing.

Observers argue that the tight timelines suggest both governments are confident about reaching financial close this time round.
Indeed, in his budget speech for 2023/24, Finance Minister Kasaija said 49 percent of the right of way for the Kampala-Malaba SGR had been acquired and construction would commence this financial year and provided Ush535 billion ($146.7 million) as compensation for project-affected persons.

In 2014, Kenya, Uganda and Rwanda entered into a tripartite agreement to construct a railway from Mombasa through Kampala to Kigali.

Kenya built its line in two phases but abruptly terminated it in Naivasha after China declined to finance the last leg after failing to strike an agreement with Uganda and fearing that Kenya was also now saddled with too much debt.

In April 2019, then Kenyan president Uhuru Kenyatta went to Beijing hoping to secure $3.68 billion — in loans and grant — to take the SGR line from Naivasha to Kisumu and Malaba but China declined. Nairobi henceforth started looking for funds to upgrade the metre gauge railway segment as a priority.

The new administration of President William Ruto has rekindled the plans to complete the SGR project and Kampala is upbeat that this time it will not be derailed.
Lapsset railway line

Still, Kenya plans to link Mombasa and Lamu ports and Isiolo in the north with a modern railway line by end of June 2027. As per plans by the previous government, Kenya plans to build a $24.9 billion Lamu Port South Sudan-Ethiopia Transport (Lapsset) railway line to open up northern Kenya and connect Kenya with South Sudan and Ethiopia.

The planned line will move from Mariakani in Mombasa to Lamu then onward to Isiolo and Moyale, which borders Ethiopia.

Meanwhile, against steep competition from Tanzania’s Dar es Salaam port, Kenya has agreed with Uganda to increase the usage of rail to haul Uganda cargo using the SGR from Mombasa to Naivasha and the metre gauge line from Naivasha to Malaba border in coming months.

Uganda’s commitment is a relief for Kenya as it will shore up its rail revenues, crucial to repaying its loan with China. The SGR from Mombasa to Naivasha was financed by the Chinese at a cost of $4.7 billion.

Kenya signed a 15-year agreement “take or pay” loan with the Exim Bank of China where the Kenya Ports Authority undertook to “take” cargo on the new railway every year failure to which it would draw from its revenues to “pay” for the shortfall.

Kenya’s loan repayment to Exim Bank of China this financial year has jumped to $800 million, an increase of over 126 percent compared with the last financial year.

According to data from the Kenya National Bureau of Statistics for 2022, in the five years that the SGR has been in operation, it has generated $4.6 billion from cargo freight. Passenger trains generated $760 million over the period, indicating cargo is keeping it afloat.


Source: Uganda, Kenya seek funds in joint bid to take SGR to DRC

Chambo cha divide and rule
 
Yaani wapewe bandari na wasitoe hata 100, faida yote kwao ilhali sie tulikopa kujenga bandari na deni halijaisha, tuwalipie mkopo na riba wakati pesa zote wapeleke uarabuni.

Huu ni ukichaa wa viwango vya juu sana.


CCCM must go!!!
Mtindo huu umeshika kasi sana, na wachagizaji wakuu ni hao tunaowaita 'partners' wetu wa maendeleo; World Bank; IMF, na hata AfDB na wengine wengi.

Sielewi kwa nini 'model' hii ya maendeleo inasukumizwa sana kwa nchi hizi za kiafrika zaidi, kwa maana huko nyuma hili halikuwa ndilo likihimizwa kwa nguvu kama inavyofanyika sasa.

Sijui ni nchi zipi tunazoweza kuziangalia kama mifano iliyopitia njia hii katika maendeleo yao.

Kuna jambo hapa.

Lakini naona kuna nchi wameanza kusukuma kukataa upuuzi huu. Ndiyo maana mapinduzi ya kijeshi yanarudi kwa kasi kubwa.
 
Hata wakiinunua Kenya yoote sawa tu sisi tunachotaka ni win win pact siyo majitu yaje kutumia vitu vyetu tulivyonunua Kwa kukopa na hata deni halijaisha Kwa ahadi hewa zilizomo kwenye mdomo wa mbarawa badala ya kwenye hard copy ya mkataba sasa ikitokea mbarawa kafa Si matrilioni yaliyomo mdomoni mwake ataenda nayo?
 
Back
Top Bottom