KIBAKI GENIOUS
Member
- Jan 29, 2020
- 36
- 35
Designed for pedestrians only, the Likoni floating bridge deck which comprise a 529 m long floating and movable section is now 70% complete ( Expected to be fully complete by end of this month)
First of its kind in Africa it connects Mombasa Island to the Mainland south.
Kenya on the moveā¤š°šŖ
First of its kind in Africa it connects Mombasa Island to the Mainland south.
Kenya on the moveā¤š°šŖ