Kipeto Wind Farm (100 MW):
The final turbine was installed at Kipeto wind Farm on 8th of june 2020. Located at Esilanke area in the foothills of Ngong Hills, about 30 km southwest of Nairobi, the Kipeto wind power project is set to inject 100MW of energy into the grid by december 2020– making it Kenya’s second largest wind farm after the Turkana Wind Power project.

Lamu Wind Farm( 100 MW):
Belgian energy firm Kenwind Ltd is now set to build a Sh 21 billion wind farm in Mpeketoni, Lamu County, after winning a tough Supreme Court battle on 15nth May 2020, that was threatening to stop the ambitious power project. This project will inject another 100 MW into the Kenyan grid upon completion.

Kengen Meru Wind Farm (400 MW):
Construction of the 400 MW wind power project in Meru county commenced in 2019. Upon completion it will be africa's largest wind farm dwarfing the Turkana Wind Power Project.
 
Wind energy my foot, hiyo idara sisi hata hatutaki, endeleeni kuwa peke yenu. Tutakutana kwenye hydropower na Gas.
 
Wind energy my foot, hiyo idara sisi hata hatutaki, endeleeni kuwa peke yenu. Tutakutana kwenye hydropower na Gas.
Hahahahhaha, sour grapes because no private investor wants to put money in the Tanzanian energy sector.
 
Wind energy my foot, hiyo idara sisi hata hatutaki, endeleeni kuwa peke yenu. Tutakutana kwenye hydropower na Gas.
Instead of being envious try and build your private sector so that investors can be attracted to your energy sector. I know you are waiting on GOT to deliver power projects like Rufiji 2000MW dam. Kenya left that to the private sector who have projects lined up to inject 2600 MW into the grid by 2023 with only 400MW out of 2600 coming from a majority government company (Kengen).
 
Umeme una katika katika sana huko! Sijui unamdanganya nani wakati kila kitu kipo wazi!
Nadhani fumes za generator zimevuruga ubongo wako. Kando na hivi majuzi umeme ulipopotea Kenya na Uganda kwangu nyumbani umeme haujapotea kwa miaka kama miwili hivi. Mara ya mwisho ilikuwa ni wanyama wa pori, nyani, ndio walisababisha 'blackout' kote nchini Kenya. Maintainance za grid zikifanywa umeme huwa unazimwa, sio kupotea, kwa masaa machache. Alafu hapo Kenya Power huwa wameshurutishwa kisheria kupeana notisi ya maeneo ambayo umeme utazimwa masaa 24 kabla, la sivyo itabidi watoe fidia kwa wateja wao. Umeme wa uhakika na sera kama hizo kwenye sekta hiyo ndio zimeifaidi Kenya na wawekezaji k.m. viwanda vya magari. Kama umekuwa ukijiuliza kwanini kampuni nyingi za kimataifa zinaichagua Kenya kama makao yao hapa Afrika jibu unalo sasa.
 
Instead of being envious try and build your private sector so that investors can be attracted to your energy sector. I know you are waiting on GOT to deliver power projects like Rufiji 2000MW dam. Kenya left that to the private sector who have projects lined up to inject 2600 MW into the grid by 2023 with only 400MW out of 2600 coming from a majority government company (Kengen).
Mutuache fanyeni yenu. This is a Tanzania model of doing things.
 
Nadhani fumes za generator zimevuruga ubongo wako. Kando na hivi majuzi umeme ulipopotea Kenya na Uganda kwangu nyumbani umeme haujapotea kwa miaka kama miwili hivi. Mara ya mwisho ilikuwa ni wanyama wa pori, nyani, ndio walisababisha 'blackout' kote nchini Kenya. Maintainance za grid zikifanywa umeme huwa unazimwa, sio kupotea, kwa masaa machache. Alafu hapo Kenya Power huwa wameshurutishwa kisheria kupeana notisi ya maeneo ambayo umeme utazimwa masaa 24 kabla, la sivyo itabidi watoe fidia kwa wateja wao. Umeme wa uhakika na sera kama hizo kwenye sekta hiyo ndio zimeifaidi Kenya na wawekezaji k.m. viwanda vya magari. Kama umekuwa ukijiuliza kwanini kampuni nyingi za kimataifa zinaichagua Kenya kama makao yao hapa Afrika jibu unalo sasa.
Kampuni nyingi na top 100 Africa mnazo NNE tu😅
Siku njema
 
Kampuni nyingi na top 100 Africa mnazo NNE tu Siku njema
Eti kampuni za kimataifa ambazo zina makao yao ya Afrika nchini Kenya ni kampuni nne tu? Unaota ndoto mbaya sana. Ila naelewa aibu za ubabaishaji wa TANESCO yenu ndio zinafanya uruke ruke ukijaribu kubadilisha mada.
 
Eti kampuni za kimataifa ambazo makao yao ya Afrika yapo Kenya ni kampuni nne tu? Unaota ndoto mbaya sana. Ila naelewa aibu za ubabaishaji wa TANESCO yenu ndio zinafanya uruke ruke ukijaribu kubadilisha mada.
Mara ya mwisho kupata mgao huku nilipo sijui ni lini! Labda marekebisho madogo napo najua utakata saa 3 utarudi saa 7.
 
Back
Top Bottom