2.2 General Site Analysis
From the initial analysis of the site, the site was found to be suitable for the proposed
development after the preliminary geotechnical investigation. The site is largely
unoccupied and directly fronts the Turtle Bay Road to the South.
The area where the proposed development is to be located is under agricultural use as per
the zoning regulations. However, the Physical Planning Act; Cap 286, section 29-41
allows for applications for Change of User and in the recent years, the area has become
an international tourist destination area with other luxury hotels like Ocean Sports;
Temple point, Hemingways, and Medina Palms among others in the vicinity.
Dabaso area is connected to the national electric grid and MAWASCO water supply
systems. Hydrogeological studies have shown potential ground water that can be utilized
to supplement water supplied from MAWASCO. Two (2) boreholes have been
suggested to be drilled on site, with their actual locations already established. The EIA
for the boreholes is part of a separate EIA.