Kijana wa kike, mzalendo anayesimamia ukarabat wa reli kilomita 217

Kijana wa kike, mzalendo anayesimamia ukarabat wa reli kilomita 217

MK254

JF-Expert Member
Joined
May 11, 2013
Posts
32,408
Reaction score
50,809
Duh! Akina dada wamechoka kutumiwa na za kutolea, wameamua kuongoza shughuli kwa mbele


Eng. Veronica Nyambura (right) with Rift Valley Commander George Natembeya (cemter) on Monday, March 21, 2021.

Eng. Veronica Nyambura (right) with Rift Valley Commander George Natembeya (cemter) on Monday, March 21, 2021.
TWITTER

For years, the engineering industry was considered a preserve for the male gender but women have been making steady inroads in the sector.

For the case of Veronica Nyambura, an engineer overseeing the refurbishment of the Nairobi-Kisumu Railway, the struggle to reach the pinnacle has been tough but her resilience has seen her pull through.

Since joining Kenya Railways Corporation (KRC) in 2013, Nyambura observes that the narrative has been changing in the eight years she was in the field.
Her hard work has seen her rise through the ranks at the institution to become one of the engineers tasked with overseeing the restoration of the railway line valued at Ksh3.7 billion.

Speaking on Monday, March 23 during an inspection tour of the project, Nyambura expressed optimism that the rail line would add value to Kenya and East Africa.


"The project aims at enhancing the transportation of goods and passengers to Kisumu and the neighbouring Uganda and Tanzania through Lake Victoria.

"It also links Kisumu Port to Naivasha ICD and Mombasa port, opening up the region to very many possibilities," she added.

Nyambura led government officials including Rift Valley Regional Commissioner George Natembeya on a progress tour.

She noted that the revival comes more than a decade after the railway line was functional in 2008 transporting goods.

"There were also sections where the embankment had been completely washed away. They included Elburgon, Kedowa, Miwani and Kisumu. We worked together with KDF (Kenya Defence Forces) to reinstate these sections. I am honored to be a part of this process," she noted.

The project, whose construction began in February, is expected to be complete by April 2021.
The revival of the 217-kilometer Nakuru-Kisumu line is being undertaken in conjunction with the KDF Engineers Brigade.

Kenya Railways has previously announced that they are set to launch the Nairobi-Kisumu line this year after years of dilapidation.


 
Very good and encouraging to see our women at the forefront of these professional fields. Tufanye kazi pamoja ili Kenya isonge mbele.
 
Bado wakenya mnaongelea ukike an ukiume? Vipi tuelezeeni na kabila lake

Nyie ndio bado mnaishi enzi zilizopita, hebu ona hapa bado mnadhalilisha watu kwa makabila yao

2760304_78ccfbb956cf7734e9cc072756adf1ec.jpg
 
Inaelekea mama Samia kawapagaisha sana mara ghafla wamechagua chief Judge mwanamke! Sie tukianza ku-mention ma-engineer wanawake kwenye mega projects Tanzania watakimbia humu!
mama anapigilia migauni mingine matata sana.
 
Back
Top Bottom