Lamu port, the largest port in East and Central Africa completes building its first berth

MK254

JF-Expert Member
Joined
May 11, 2013
Posts
32,408
Reaction score
50,809
Factbox
The Lapsset corridor is to comprise
1. Standard gauge railway line
2. Road network
3. Oil pipeline ( Crude & product)
4. Oil refinery ( Isiolo/Lamu)
5. International Airports (Lamu, Isiolo and Lokichogio)
6. Port at Lamu (Manda Bay).
7. Resort cities (Lamu, Isiolo and Lake Turkana)
--------------------------------------
The first berth of the Lamu port is complete, the South Sudan and Ethiopia Transport (Lapsset) Corridor Development Authority says.
β€œThe first berth of the Lamu port is 100 percent complete,” the authority stated on its Facebook page.
It said berth 2 and 3 will be completed by December 2020.
The construction of the first three berths out of the 32 expected, begun with dredging works in December 2016.
Lamu Port is a government initiative to develop a second deep sea port along the Kenyan coast.

It will be the largest deep sea port, with the highest trans-shipment capability in the East Coast of Africa.
The berths have a 400m key length and a depth 17.5-18m along a distance of 6,000m.
Lapsset corridor
The Lamu Port is part of the Sh2 trillion Lapsset corridor, expected to open up the northern part of the country and contribute at least 1.5 per cent of the country’s Gross Domestic Product (GDP).
Construction of the three berths is expected to take five years with the entire port planned to have a total of 22 berths.

The port will cater for the Ethiopian market, currently served by Djibouti port and South Sudan, which relies on Port Sudan.
The Lapsset project has other components including a superhighway that will connect Lamu to Addis Ababa, Ethiopia and Juba in Southern Sudan.
The development of a new transport corridor linking a new and modern Port of Lamu with Garissa, Isiolo, Maralal, Lodwar and Lokichogio and branching at Isiolo to Moyale at the border with Ethiopia and proceeding to the border with Southern Sudan is part of the flagship infrastructure projects under Vision 2030.
Deep, sheltered bay
The proposed port site at Manda was selected because it has deep and sheltered bay and a wide navigable entrance channel.
The 10km-shore length has the capacity to accommodate up to 23 berths.
The development include the long-term physical planning of Lamu Metropolis area to demarcate sections which will accommodate complimentary cargo handling facilities such as railway terminal, godowns, container freight stations, tank farms, refinery, lorry terminals and also the social facilities for migrant workers.
Associated infrastructures required will be the connection of Lamu to the main electricity grid from Hindi, increase of portable water supply within the region and upgrading of access roads.
According to Kenya Ports Authority, once complete, the facilities at Lamu port are to create substantial job opportunities that covers not only direct jobs related to the port operation but also indirect jobs in agriculture, fishery, manufacturing, logistics, transport, trade and commerce.

The port is expected to attract larger cargo ships and provide direct benefits in the region by passing on savings derived from lower marine costs due to faster ship turnaround time and at the same time of reducing the cost of doing business.
The new access and links with neighbouring countries created by the Lapsset corridor is expected to foster regional economic development and growth through trade facilitation and boost value addition especially on processing of agricultural products and cash-crop exports.
Tourism growth
According to Vision 2030, the alternative destinations created by development of Resort Cities in Lamu, Isiolo and Turkana are expected to increase international tourist arrivals and push up the foreign exchange earnings.
The opening of northern Kenya is expected to not only pave way for exploiting the existing natural resources like oil and coal, but will also encourage the exploration of new finds.
It is envisaged that the port of Lamu would attract some of the cargo which would traditionally pass through the ports of Sudan, Djibouti and Mombasa.
The government traffic forecast for the Lapsset corridor shows that inclusive of demand from both South Sudan and Ethiopia, the Lamu traffic is to reach 23.9 million tons by 2030.



 
24m tons in 10 yrs, tall order lakini inawezekana.Mafuta turkana, coal kitui, coal ya lamu power plant, livestock northeastern, exports/imports south sudan ethiopia na hapo lamu industrial pack etc.We're striving on
 
Ultra modern Bwagamoyo Port. Tena kwa pesa yetu ya ndani Magufuri is ze besti laisi in the universe! Nyang'au mtaisoma number 😁😁

What Happened: Tanzania's ambassador to China suggested during a visit to Hong Kong that the $10 billion Bagamoyo port project, which according to earlier reports had been canceled, might continue after all, the South China Morning Post reported July 11.
Why It Matters: News of the project's cancellation came amid a broader move toward resource nationalism by the Tanzanian government as it tried to raise revenue as well as increased skepticism of foreign investment projects over financing concerns.
Background: Work on the port, which began in 2018, will likely continue, although it remains possible that both sides will renegotiate crucial aspects of the project.
Read More:

Connected Content
Regions & Countries
Tanzania
China
Themes
The Suitors of Sub-Saharan Africa
Companies
South China Morning Post
Article Search

 

News
Tanzania and China β€œready to engage” on restarting $10bn Bagamoyo super port project
15 July 2019 | By GCR Staff | 0 Comments
The $10bn project to build a megaport in the Tanzanian town of Bagamoyo, which appeared to have been scrapped by President John Magufuli, may be back on track, according to Tanzania’s ambassador to China.

Mbelwa Kairuki told reporters during a visit to Hong Kong on 11 July that discussions were under way between the Tanzanian government and investor China Merchants Port Holdings to resolve disagreements over the terms of the deal, which Magufuli described in June as β€œexploitative and awkward”.

Kairuki said there were 29 issues still to be resolved, of which four might require parliamentary action. He gave the example of laying the legal basis for the operation of a special economic zone alongside the port.
He said: β€œThe Bagamoyo project is, there’s a negotiation, which [is] ongoing between the government and the investor. Some of the issues that the investor is proposing don’t make sense, but we hope that through engagement we will get to understand better.
β€œThe good thing is the investor is ready to engage, and the government is willing to as well.”

Last month reports in some foreign media claimed Magufuli had suspended the project. He was reported to have criticised onerous terms of the deal, including requirements to halt the expansion of other ports.

Kairuki, meanwhile, rejected allegations that the Bagamoyo Port project was a debt trap.
He said: β€œThey are talking about a debt trap – you know, this is pure investment,” he said. β€œThis is investors bringing capital. The government is not bringing a single cent. So how can it be a debt trap? Maybe an investment trap. And what’s wrong with investment? Investment brings jobs, it brings capital, it brings technology, it brings everything.”

The fate of the Bagamoyo, which would be the largest in Africa, has been in doubt since it was put forward in 2014 as a 20 million teu (20ft-equivalent unit) container port, variously priced at between $7bn and $11bn, and originally due to be begin limited operations in 2017.

The port is being financed by China and Oman’s sovereign wealth fund, the State General Reserve. It is being developed by Hong Kong-based conglomerate Merchants Holdings International.

Chinese investments in Tanzania reached $7bn in 2018 and trade between the two countries was $4bn, according to Xinhua.
Image: Traditional Dhows at the fishing port of Bagamoyo (Adam Jones, Ph.D./CC BY-SA 3.0)
Further reading:
 
Umeanza huu wimbo Tena... I thought "once bitten twice shy" worked for everybody?
 
Dredging at Tanga port to start next month. This will be a continuation of Dar and Mtwara ports.

 
Umeanza huu wimbo Tena... I thought "once bitten twice shy" worked for everybody?
This Boogermoyo project is as dead like dead goats in Manzeshe butchery. Why even start it when Dar port is already under utliized?
 
Duuu unfortunately, the central Afrika has no ports to compare with lamu.
May be you are talking about inland ports which are not existing.
 
Duuu unfortunately, the central Afrika has no ports to compare with lamu.
May be you are talking about inland ports which are not existing.

Hehehehe Haya ndio matatizo ya kuishi vitongoji vya Dar na kutobahatika kutoka ukajionee dunia...
Tafuta mtu akuelimishe kwamba bahari Hindi sio pekee dunia hii, kunayo inayoitwa Atlantic na kuna mataifa yanayohesabika ndani ya Afrika ya kati ambayo yanaitumia bahari ya Atlantic.
Sijui elimu hapo Tanzania mnakwenda kufundishwa nini haswa.
 
Wanafunzwa uzalendo ule wa kipumbafu wa CCM
 
Wanafundishwa uchawi kwa shule.
 
Wanafundishwa vile wataipiku Kenya ndani ya siku Mia moja πŸ˜‚ πŸ˜‚
 