Miradi mikubwa inayoendelea Kenya

Miradi mikubwa inayoendelea Kenya

Mradi wa barabara ya Double Decker from JKIA hadi katikati mwa mji wa Nairobi

0mCea.jpg

Uhuru Highway set for a complete makeover
http://www.businessdailyafrica.com/U...z/-/index.html

IN SUMMARY:



    • The section between Nyayo National Stadium and the Museum Hill interchange would have an elevated road with two lanes on each side.
    • The stretch would also have additional special lanes to accommodate a special bus rapid transport system (BRT) that will run from JKIA to Kikuyu.
    • The actual design of the road project jointly funded by the government and the World Bank will be known soon when submission of bids closes on January 31.
LIKONIJAMESGICHURU.jpg

An artistic impression of Uhuru Highway. The section between Nyayo National Stadium and the Museum Hill interchange would have an elevated road with two lanes on each side. Photo/KENHA

LIKONIJAMESGICHURU1.jpg

An artistic impression of Uhuru Highway stretch that will have additional special lanes to accommodate a special bus rapid transport system. Photo/KENHA

LIKONIJAMESGICHURU2.jpg
njia hii itaipiku kwa kishindo thika super highway
Nairobi, Kenya.

greensuncities__04.jpg


greensuncities__03.jpg
__________________



DSC04366.JPG

__________________more renderings of the projectAn artistic render of the project

dl0ebNm.jpg

ooksP14.jpg

u5MR9Nz.jpg


http://buildesign.co.ke/what-if-nair...uhuru-highway/NA HII NDO ITAKUA FINAL PRODUCT AMBAYO IKO KATI YA NYAYO STADIUM NA UHURU HIGHWAY.With Labels.....


Have tried to identify possible areas to be used for the interchange from google maps .... as highlighted below in red, I think that is more than enough for this interchange.


__________________NJIA HII YAFANANA NA CLOETE
Hata outering tunayoisifia sana itaona tu kwa macho


 
Another Bypass to solve perrenial grid locks in Nairobi unveiled.
The Signing

Cj7-CKQWYAAoGRa.jpg


Quote:
The Kenya National Highway Authority (KeNHA) has signed a contract with China Roads and Bridges Corporation to carry out feasibility studies and designs for the construction of the Nairobi Western Bypass.

The construction is expected to cost Sh17.3 billion and will be funded through a concessionary loan from the Government of China.

The Kenya National Highway Authority Corporate Affairs Manager Charles Njogu says the proposed four lanes highway measuring 16.5 kilometres with a design speed of 100 kilometres per hour will connect the southern bypass at Gitaru and northern by bypass at Ruaka.

Njogu says the Bypass has been identified as a link necessary for the completion of a system of ring roads around Nairobi city aimed at easing traffic in the Central Business District.

“The Nairobi Western Bypass project will be implemented as an Engineering, Procurement and Construction Contract (EPC) and will include facilities like walkways on each side at Wangige, Kihara Ndenderu and Ruaka Townships, underpasses for pedestrian traffic at market centres, a bus terminus at Wangige among others,” Njogu stated in a statement.

Other facilities include noise barriers on interchange slip roads at Ruaka to minimize noise disturbance on resettlements and a central steel barrier for pedestrian control and safety along the main bypass alignment.

The new Bypass follows the completion of Northern and Eastern Bypass while the construction of the Nairobi Southern Bypass is nearing completion.

It is also expected to enhance economic growth along the areas it will pass through
Source
Nairobi's Western bypass to cost Sh17 billion, work to start soon
posted june 3 2016


A map of Nairobi showing road network.
 
Somebody should also post the pictures of junctions under construction in Njoro-Soilo junction in Nakuru, Total junction and even The junction in Kitale.Awesome projects going on here. ...^..^


I stay 5mins from this place wacha sato nikirudi nax ntapiga picha mkuu!!!! That intersection is huge man
 
Yaani hamjaanza hata kujenga majigambo kibao, harafu unazungumzia daraja la urefu wa km 1 wakati sisi tunataka kujenga la urefu wa km6 kigongo to Busisi


Kakobee kweli Hesabu kawapiga chenga waTZ nyie wote humu jf madimbidi halisi SMH... ETI 6KMS??????


YA WAPI HYO???

KIGAMBONI HATA NUSU KILOMITA BADO LOOOL!!!! HAHAHA

680M = 0.68KM enda math class mkuu



TRENDING: #NyerereBridge - Tanzanians on
cloud nine as Magufuli opens impressive new
bridge
19 APR 2016 15:10 |
M&G AFRICA ONLINE REPORTER
The 680m long bridge is the longest cable
stayed bridge in East Africa
TANZANIAN President John Magufuli is
opening what many on social media have
claimed is “the most magnificent bridge in th
[East African] region.”
Formerly dubbed the “Kigamboni Bridge”, as it
connects Dar es Salaam’s central business
district to Kigamboni across the Kurasini
creek, Magufuli has now renamed the bridge
the “Nyerere Bridge” paying tribute to
Tanzania’s founding president Julius Nyerere.

Screenshot_2016-06-03-17-00-03.png
 
MULTI BILLION GALANA KULALU PROJECT-OVER 10 BILLION HAS BEEN INJECTED IN THIS MEGA P
Galana irrigation scheme ready for its first planting this week
ico_plus.png
Share
ico_bookmark.png
Bookmark
ico_print.png
Print Rating
FARM.jpg

President Uhuru Kenyatta during the ground breaking at Galana-Kulalu irrigation project. PHOTO | FILE

By GERALD ANDAE, gandae@ke.nationmedia.com

Posted Monday, April 6 2015 at 19:54
In Summary

  • Israeli firm Green Arava, which won the Sh14 billion contract to develop the model farm, will be planting the first maize crop on 1,000 acres for a start.
  • The model farm, which is estimated at 10, 000 acres, is being used as a demonstration block for developing the entire one million acres set for irrigation.


The maiden planting at the one-million-acre Galana-Kulalu irrigation scheme is set to start this week, bringing the ambitious plan aimed at reducing food shortage in Kenya closer to reality.

SHARE THIS STORY
0
inShare



Israeli firm Green Arava, which won the Sh14 billion contract to develop the model farm, will be planting the first maize crop on 1,000 acres for a start.

The model farm, which is estimated at 10, 000 acres, is being used as a demonstration block for developing the entire one million acres set for irrigation.

“We have planned to start planting the first crop this week under the model farm, and we hope that the weather will be favourable for the exercise,” said the project manager Richard Kanui.

The exercise was supposed to start last week but was hampered by the rains that have been pounding the region recently.

Mr Kanui told the Business Daily that the first maize crop from the scheme is expected in August as it will only take three months to mature and it will be processed on the farm.

Already, the contractor has placed an order for a milling plant from South Africa to process maize flour. The model farm will guide the structure of the irrigation scheme.

The plant, said Mr Kanui, comes with a dryer, making it easy to contain cases of afflatoxin that are common in the area given its humid condition.
“This is a state-of-the-art milling plant that has the ability to package the flour once it has been processed,” he said.

He said that Green Arava was already designing the logo that will be used on the packaging material to market the products from the irrigation scheme.

The Galana project is expected to cut Kenya’s reliance on rain-fed agriculture that is blamed for the perennial food shortage by employing technology to cut cost of food production.

Green Arava expects a minimum of 80 bags of maize from an acre under good farming practices borrowed from Israel. The centre pivotequipment that is being used to irrigate crop has been installed on the farm.

Noam Ftecha, the lead engineer with Green Arava, said the equipment can perform several tasks, including applying liquid fertiliser.

The Sh260 billion Galana project is a public-private partnership in which the government will be providing infrastructural services with the investors expected to plant crops and set up processing plants.

Foreign investors top the list of firms lined up for the project.

The Ministry of Agriculture is evaluating a list of 80 local and international investors who have sent in applications to lease land at the scheme.

ROJECT.
President Visiting Kibbutz Kalia near the Dead Sea where Kenyan students are learning dryland farming and automated agriculture

12733422_1232591436769407_5077131627953594108_n.jpg


1238790_1232591233436094_4994113167781180804_n.jpg


12746002_1232591520102732_5921964772788439651_n.jpg


1936980_1232591176769433_3686668498651360086_n.jpg


8382_1232591480102736_8400126875139381411_n.jpg


12049505_1232591223436095_4766744204723000336_n.jpg



Quote:
Kenya will send more students to learn dryland farming technologies and automated agriculture in Israel, President Uhuru Kenyatta announced today.
The President said the experience of Israelis in harnessing harsh and dry lands to produce crops will be utilised to increase food production in Kenya.

The President said since 70 per cent of Kenya’s land was arid, it was prudent to send more students to Israel besides those who are already studying in Israeli institutions.

He said a decision to send more students and open up more Israeli institutions to Kenyan learners was reached on Tuesday when he held a bilateral meeting with Prime Minister Benjamin Netanyahu.

President Kenyatta spoke when he visited a Kibbutz where more than 70 Kenyan students are learning new farming technologies.

University students make up the bulk of those in Israel with 25 students each from Egerton University and Jomo Kenyatta University of Agriculture and Technology. The University students are on an 11 month training course. The rest of the students are from the Kenya Water Institute (KEWI).

The Kenyan students are learning intensive agriculture productions techniques, design and application of automated agriculture and irrigation systems.

President Kenyatta said the knowledge learnt by the students will be used to revolutionise agriculture in Kenya starting with the Galana-Kulalu Irrigation Scheme where the students will first apply their skills.


“A desert can truly be a paradise if we are committed. This place is drier than any part of Kenya but look at what they produce,” said President Kenyatta who was taken on a tour of organic tomato farms and a section of the Kibbutz for dairy cows.

He urged the students to take seriously the lessons they learn while in Israel because Kenya is waiting for their expertise. The President said the Galana-Kulalu scheme will be ready to absorb the students when the first group returns in a few months time.

President Kenyatta said the scheme would now have been productive were it not for the misplaced priorities of Kenyan politicians. The President said Kenyan politicians have the habit of prioritising personal and tribal competitions instead of putting the interest of the country before everything else.

The Galana-Kulalu scheme was delayed for more than three years by obstacles created by politicians.
__________________
 
STILL ON GALANA KULALU PROJECT
Galana harvesting of 2nd crop & rolling out the planting of the 10,000 acre model farm



Ce8Y-WEWwAAIjHq.jpg:large


Ce8Y-d5WsAA18-i.jpg:large


Ce8Y-frXEAAXHPQ.jpg:large


Ce8Y-gaWwAEJaUk.jpg:large


Ce9I36FWsAAwM48.jpg:large



Checking out the newly installed pumping & irrigation equipment at Galana before planting


Ce9FwEpW8AQrIs5.jpg:large


Ce9FwIZWwAEPOfU.jpg:large


Ce9FwL-WIAAjOxS.jpg:large


Ce9Fv-wW8AE3inC.jpg:large



Launching the planting of the 10,000 acre model farm in Galana after starting the 2nd harvest



Ce9I3xBWwAEL8gD.jpg:large


Ce9I33GWsAAUzl7.jpg:large


Ce9I30JW8AAjTXJ.jpg:large



Irrigation agency starts work on 10,000ha model farm at Galana-Kulalu scheme
From today's Business Daily, Economy & Politics section pg 6, and also online...

Irrigation agency starts work on 10,000ha model farm at Galana-Kulalu scheme

By GERALD ANDAE
Posted Sunday, April 24 2016 at 20:16

National Irrigation Board (NIB) has started developing the 10,000-acre model farm at Galana-Kulalu irrigation scheme ahead of the visit by Israeli Prime Minister Benjamin Netanyahu on July 5 for official launch.

The start of the project follows successful field trials to determine the best variety seed to plant on the farm.

The project, currently behind schedule due to insufficient allocation of funds by the exchequer, has been launched by Water Secretary Eugene Wamalwa, paving the way for the growing of maize on the entire model farm at one go.

According to NIB, which is implementing the project, 4,000 acres is being targeted by the end of June, ahead of the planned launch.
Israel is the major financier of the model farm having provided Sh7 billion loan. The plan is one of Jubilee government’s flagship projects, which are supposed to be delivered within five years of its first term.

“We are now ready to plant the entire 10,000 acres after successful trials to find the right seed to plant in this region,” said Thuita Mwangi, chief engineer, planning and design, at the NIB.

The new development happens amid confusion at the NIB following the suspension of the top management, including the General Manager Daniel Barasa on alleged corrupt deals in procurement.

READ: Netanyahu set to unveil Galana-Kulalu scheme

NIB projects to plant 2,000 acres of maize every month and it intends to complete the entire 10,000 acres by September as the laying of pipes and clearing of bush has been concluded... Read the entire article here.
 
While at it mpee correction

saadeque Kigamboni Bridge ni 680m long likoni bridge will be longer than that
niliona nkashangaa...ati 6km.kwani linaenda kuzimu.hiyo 0.68km sijui lilichukua miaka mingapi.wachukue hiyo miaka yakujengea kigamboni times 8 ndo wamalize 6km.kisha kutakua na miaka ya bakshishi.by then nai itakua imeshikana na mombasa
 
While at it mpee correction

saadeque Kigamboni Bridge ni 680m long likoni bridge will be longer than that
niliona nkashangaa...ati 6km.kwani linaenda kuzimu.hiyo 0.68km sijui lilichukua miaka mingapi.wachukue hiyo miaka yakujengea kigamboni times 8 ndo wamalize 6km.kisha kutakua na miaka ya bakshishi.by then nai itakua imeshikana na mombasa
 
While at it mpee correction

saadeque Kigamboni Bridge ni 680m long likoni bridge will be longer than that
niliona nkashangaa...ati 6km.kwani linaenda kuzimu.hiyo 0.68km sijui lilichukua miaka mingapi.wachukue hiyo miaka yakujengea kigamboni times 8 ndo wamalize 6km.kisha kutakua na miaka ya bakshishi.by then nai itakua imeshikana na mombasa
 
waambie Kenya twatamba kote,si majini,angani,jangwani,ufukweni na ardhini tuko teketeke.
 
Ian Cruz fuuuuck bana..... NIMETII NA GALANA.... THIS IS HOW LARGE SCALE USA corn field always look its usually circular and the water pump at the centre goin round daily.... Woooow galana will be bomb Kenya tayari tuna zalisha more
Wheat
Barley
Potatoes
Tea
Coffee
Fish
Fruits
Flowers
Beans
French beans
Eggs
Sugar
Beef
Meat
Mutton
Than all other EAC members sasa hivi galana itatuweka mbele kwa chakula EAC yote sudan tu ndio ina tuweza kwa umbali

I read somewhere that
Egypt has 32mn acres under irrigation
Sudan has 19mn acres under irrigation

South Africa ina 15mn

Kenya sasa ina 600,000acres lakini galana ni 1.2 na by 2030 tunataka kuweka 15mn acres that is 16,000km²

Galana is just 1720km² bado 14000km² more or total size of Nakuru county to go.... Sasawa jubilee.......
 
niliona nkashangaa...ati 6km.kwani linaenda kuzimu.hiyo 0.68km sijui lilichukua miaka mingapi.wachukue hiyo miaka yakujengea kigamboni times 8 ndo wamalize 6km.kisha kutakua na miaka ya bakshishi.by then nai itakua imeshikana na mombasa

Likoni bridge will be twice much as big the size of their Kigamboni Bridge..... Wacha imalizwe washangae.... Na bado wataweka cable cars na tram by 2030 Mombasa inaweza toanisha Dar vibaya..... Ipe 5yrs alafu uje n compare kwanza wakenya wanavyo penda kuiga mtindo.....

Wakati walisema mayai ya kweil ndio biashara kila mkenya alianza kuweka kweil mpaka zikajaa sana.... They were flying all over virtually for free

Wakati real estate ilianza kutia nanga nairobi... Kila mkenya akaanza kujenga bado wanajenga


Sasa English point marina ilipo malizwa hivi tu Mikenya ikaona profit pap... Sai kuna 5 marina U/C in mombasa between 2014-2017 wacha real estate fever irejelee mombasa tuone venye itashoot juu!!!
 
Namba mtaisoma kabisa.....nawazima na longolongo zenu kwisha kabisa!!
 