Progress of second Utalii College in Kilifi
C4jLRXm.jpg
dY5JQSm.jpg
htF22dj.jpg
7QtGKZE.jpg
 
Kenya Women Holding (KWH) ....nadhani hii ndio itakuwa HQ yao huko Nakuru. WANAWAKE HOYEE!!! TUNAYO AMA HATUNA!!!


13241260_1765987900286868_1107394233431820031_n.jpg



13220824_1765988020286856_1102180854415426176_n.jpg



13254206_1765988146953510_475876655624028672_n.jpg



13267780_1765988343620157_5969164553590481702_n.jpg



13260005_1765987336953591_7048451152944924273_n.jpg





13254601_1765987560286902_7982783901666650402_n.jpg
 
The Ksh.0.8 Billion 132kV Menengai - Solio Substation


The 132kV substation will evacuate power from 3 IPPs at the crater.

The substation includes the construction of a 132kV substation at Menengai, extension of the bay in the existing Soilo substation and transmission line infrastructure connecting the two. Future plans are to evacuate 400MW via 400kV lines at the substation

4105f1f7679d0de6dcebf6f92afd2985.png



Power from the Menengai Substation will be transmitted to Solio Substation, 12.6km away.
ee848569ff9c03fbc2078a5bdfca2f12.png



The Menengai Substation is 80% complete and tower erection at 70% Completion.
d89cf90d933cf59e20769119be55c11f.png



KETRACO plans to increase the stations's capacity to 400kV to meet growing demands
163344042ef789f739db6a20602ed634.png
 
The 220kV Suswa Mega Substation

The 220kV substation, located in Suswa is a Vision 2030 project that will be the meeting point of crucial transmission lines in Kenya. Among them include 3 lines from Ol Karia Geothermal Stations and Ethiopia HVDC Line.

Suswa Substation
e000ea409a5425d6d21e88542a3f0f6e.png



OLK1, OLK1(AU) and OLK4 Lines at Suswa Substation
50975cf7e7fd962cfde4f1565a51187b.png



A 220kV (Left) and 400kV (Right) Pylon
a3f228f89aceb6041f8441e93f3170e2.png



Bus-bars connections at Suswa Substation
100d571eb23561273ef8497863167537.png
 
East Africa: Ethio-Kenya Power Connection - Taking Cooperation a Step Further


Ethiopia-Kenya Power Interconnection: Phases I and II - The Power of Regional Interconnection
Ethiopia-Kenya%20Power%20Interconnection1.jpg


Ethiopia-Kenya%20Power%20Interconnection.png


 
mradi wa Irrigation on 10000 acres galana umeshika kasi Galana Kulalu Food security Project on the 10,000Acre model farm

CmbVzogXgAAKAJV.jpg:large


CmbVz27WIAAdW_A.jpg:large


CmbVzvtWgAAB6oZ.jpg:large


The automatic self cleaning filtration system that filters approx 5000cubic meters per hour now working

CmbY23kWgAAlcST.jpg:large


CmbY24NXEAAQfU2.jpg:large


CmbY24gXgAA8av8.jpg:large


CmbY2_YXgAAYMlj.jpg:large


 
10000 acres under Maize and with addition of pumps & centre pivots will achieve greater acreage

CmbeL2SXYAAhT5-.jpg:large


CmbeNg3WAAAK1oQ.jpg:large


CmbeMCfWAAAXTjS.jpg:large


Inspecting the one week old maize crop under production

CmbgmjUWIAA05E-.jpg:large


CmbgnEqWcAAOk2f.jpg:large


CmbgpEFWAAA9nWN.jpg:large


Inspecting the 3 weeks old maize under production

CmbkWkUWIAAqWeK.jpg:large


CmbkWlDXgAAzOjW.jpg:large


CmbkYQ2WgAAbwtT.jpg:large


Fresh planted maize under production & clearing of stones by locals

CmbmSc0WAAASniw.jpg:large


CmbmSniXYAAKUzW.jpg:large


CmbmSiIWIAARnaw.jpg:large
 
Impressed with Punda Milia seed variety that promises better yield harvest

Cmbt0vqWIAAVrOG.jpg:large


Cmbt0zpWEAABkJw.jpg:large


CmbybHjWgAAci1K.jpg:large


CmbyaOFWEAAidL9.jpg:large
 
Progress on outeringAnd just to remind how the linking of ORR to Thika Rd is intended to be accomplished (aligned to the Google Maps image above).
0VzsADV.jpg


Here we go...
DAxbdve.jpg

VO5UdlK.jpg

ZOJgnZC.jpg

r23yY0d.jpg

wCJ1Bhu.jpg


BTW, that foundation excavation to lay the aggregate is pretty deep (that is Thika Rd at the back):
5Ne4ha5.jpg


Well, as should be expected due to our "jua kali" way of doing things, some bottlenecks along the way. But I am informed (by the ad hoc [one of his Kenyan colleague] translater of that Chinaman in the photo) the fiber cable service operators have already committed to sort out this mess over the coming weekend.
Az0Xj54.jpg
__________________
 
Meanwhile, work on the reinforcing walls of the Donholm underpass has started.

27982207886_f0da093ca9_b.jpg


27939037911_1368c31a2c_b.jpg


27736706890_c2e991cef0_b.jpg


27736710320_2e6d407587_b.jpg


27939043191_efb7019581_b.jpg

__________________
 
Here is an update of works:

Section A:

Here, substantial work has been done on one side of the road (either Thika road bound or Juja road bound). I.e. the service road and two lanes of main carriageway. See the photos below for illustration:

Juja road bound lanes (service road and main carriageway).

27935477812_e02aabce6a_b.jpg


In a few months, motorists will be able to drive on the new lanes from Thika road to Juja road junction. I.e both service lanes and main carriageway. This will allow for work to begin on the opposite service road and main carriageway lanes. In fact, in some sections, this has already started.

Below: The old road is being peeled off after traffic was diverted to the newly built lanes:

27960165051_5ce9375782_b.jpg
The overpass may take a bit of time but the bridge for the service road should be ready in a few months (they were bust working on it). See below (the lower bridge):

27757261420_9235526de8_b.jpg
__________________
 
More photos taken at various places along section A. Notice how they are working on both the main carriageway and service lanes simultaneously

28003296866_a228b72272_b.jpg


27935465212_c6e2de3b09_b.jpg


27424138224_7c25661122_b.jpg


27424141724_05b2ee142e_b.jpg


27757306800_65b02ecee2_b.jpg


27935487032_083ecd5450_b.jpg


28038080945_2bf54dc682_b.jpg


27423966333_bd2758448f_b.jpg


28003326876_2139844791_b.jpg


27960207221_b69e51a75f_b.jpg


27423979273_4532b1fb29_b.jpg


Below: The two opposite reinforcing walls at Juja road junction. One is almost complete, the other just getting started.

This one is nearly complete

27935515422_5eca6abc1c_b.jpg


This one still has some work and some section are yet to be touched.

27423943483_67ddd7ab13_b.jpg


27935453432_976d0d475a_b.jpg

__________________
 
Photos taken at various parts of section B

Substantial work has also been done on this section.

Below: Juja road junction. The main carriageway will be an underpass and will be behind the left wall. The space between these two walls will be filled to create the service road from Juja road junction towards Kangundo road.

28003273536_26189093a0_b.jpg


Below: Beams being laid on the bridge at Nairobi river

28003270736_177d4564c7_b.jpg


28038031385_a6785e04a7_b.jpg


28038025455_3848774479_b.jpg
 
......and now the elevated overpass taking shape!Below: The famous Kangundo road overpass

They are almost done laying beams on the service road. The service road is raised only at the railway crossing. The main carriage way is about 1km long. It is that long because it allows vehicles under is at three junctions (Kangundo rd, Mumias South and the road to Kariobangi South) as well as the railway crossing.

27757242380_e867447a05_b.jpg


27424080604_a8af512dbb_b.jpg


27757236430_a2bd846840_b.jpg


27935423812_12788b2a1e_b.jpg


27424069684_8d2346d0f8_b.jpg


28003250226_b23c518942_b.jpg
__________________
 
A section of the famous Mazeras super bridge on SGRMazeras-1 Bridge
vrAci7H.jpg



Mazeras-2 Bridge
4DCafLn.jpg


47eIMWh.jpg
 
Construction of Nairobi South station is proceeding at a greater speed,day and night.
Nairobi South Station
kaRPgDd.jpg


cGFJ63c.jpg
WCUrS0l.jpg


LDe5qGd.jpg


bIH5mPo.jpg