NAOMBA UFAFANUZI NA MACHANGANUO MKUU
KUN MAANA KWA UMASKINI WANGU NATAMANI SANA KUWA NA KIBANDA ILA GHARAMA NI KUBWA KWA KWELI
km kiwanja unacho
Vyumba 3 vya kulala, sebure ya kawaida, choo na jiko.
Bati 60x17,000= 1,020,000
mbao 2x6 @ 12,000 30pcs= 360,000
mbao 2x4 na 2x2 =40pcs x8,000=320,000
tofali 2600x900 = 2,340,000
cement mifuko 20x16000=320,000
mchanga lorry 2X70,000 = 140,000
kokoto lorry 1(3.5m3) 150,000/= 150,000
nondo pc 24 (ring beam na ground beam) @ 18,000/= 432,000
dirisha 6x90,000/= 540,000
milango na frame zake 5x230,000/=1,150,000
Labour charges
tofali 2600x @ 300/= 780,000
kuezeka 200,000/=
milango na frame zake @ 15,000/=*5= 75,000
madirisha 6x 8,000/= 48,000/=
Jumla around 8,000,000/=
hiyo balance ya 2m unafanyia finishing na vitu vidogo vidogo vinavopungua.