Archival Sense
JF-Expert Member
- Dec 16, 2025
- 576
- 252
Video by Parliament Watch Ug
National Water and Sewerage Corporation (NWSC) Managing Director Silver Mugisha has blamed damage to completed roads during water pipe installations on the lack of designated utility corridors and encroachment on road reserves.
Appearing before Parliament’s Committee on Physical Infrastructure, Mugisha said buildings have occupied land intended for infrastructure, leaving water pipes with no designated space.
He urged the Ministry of Works and Transport to include utility corridors in road designs to prevent damage to newly constructed roads.
“How I wish that every time they are designing a road, they include a space for utility corridors,” Mugisha said.