Progress ya Nairobi expressway

Progress ya Nairobi expressway

I came to learn only 8.2 km of 26.4 km of ur express highway will be a viaduct! IRMAO n u r to pay over $2 bln after they collected their charges!
Nyinyi hamna viaduct ya barabara. Nyamaza tu hadi mjenge yenu ya kwanza mwaka wa 2032.
 
Nyinyi hamna viaduct ya barabara. Nyamaza tu hadi mjenge yenu ya kwanza mwaka wa 2032.
Na kwanini tujenge viaduct ya magari ya kulipia badala ya public metro?

Didn't I post explanation on this ? Wacha ufalamanga!

See what Tanzania will try to have!
 
I came to learn only 8.2 km of 26.4 km of ur express highway will be a viaduct! IRMAO n u r to pay over $2 bln after they collected their charges!
The elevated section is 11.1km, stop talking about things you don't know. The road also has a total of 10 interchanges which is more than the total number of interchanges in East and Central Africa outside Kenya.

1-4.PNG
 
The elevated section is 11.1km, stop talking about things you don't know. The road also has a total of 10 interchanges which is more than the total number of interchanges in East and Central Africa outside Kenya.

View attachment 1803335
I am just asking this out of curiosity because I am not an Engineer. In Engineering, when they say 4-lane dual carriageway do they mean 4 lanes on either side or four lanes total?
 
The guy has showed you a scope of work from KENHa.
Hawa kenya.ke ni mediocres sana
unajua maana ya scope? Is scope the final say? Au unataka tuanze kubishana kuhusu feasibility study of a project?

 
unajua maana ya scope? Is scope the final say? Au unataka tuanze kubishana kuhusu feasibility study of a project?

The project is already being constructed. Feasibility stufy was done and completed. Kenha source shows 11km viaduct so piss
off
 
I am just asking this out of curiosity because I am not an Engineer. In Engineering, when they say 4-lane dual carriageway do they mean 4 lanes on either side or four lanes total?
4 lanes in total. The expressway has 6 lanes (4 normal and one emergency), the ground has 6 (4 normal, 2 BRT) a total of 12 lanes excluding service lanes.
 