Taarifa hii nimeweka hapa kwa ajili ya doubting Thomases from the south.,
SGR launch double-stack freight trains to boost efficiency at Mombasa Port
standardmedia.co.ke Sep 30, 2018 3:00 AM

SGR with its double stack containers leaves the port of Mombasa to Nairobi.
Evacuation of cargo from the Port of Mombasa is set to improve following the launch of double-stack wagons on the Standard Gauge Railway (SGR) line.

Yesterday, the maiden double-stack train snaked its way from Mombasa to Nairobi’s Inland Container Depot (ICD).

“KPA is proud to announce the commencement of double-stacked trains from the Port of Mombasa to the ICD Nairobi,” said Kenya Ports Authority MD Daniel Manduku yesterday.

Currently, each of the eight SGR freight trains transports 108 containers from Mombasa to Nairobi.

Reports by KPA indicate that container off-take from the port to the ICD has registered tremendous growth, recording 5,121 Twenty-foot Equivalent Units (TEUs) in the week ending September 19.

Standard measurement

The TEU is the standard measurement of the containers.

Yesterday Kenya Railway Corporation (KR) said the double-stack train that left Mombasa was on a pilot run.

“This will double the capacity of cargo evacuated from Mombasa to the ICD. We plan to have two double-stack trains by Wednesday,” said KR Commercial Manager Julius Siele.

“If the off take of containers at the ICD improves, we will launch more,” he added.

And importers with cargo that has overstayed or is uncollected at the port and the ICD have 14 days to clear it or risk losing it.

Kenya Revenue Authority (KRA) and KPA issued the notice to importers to collect their cargo, failing which it would be destroyed.

According to an advertisement in the local dailies, KPA and KRA warned that cargo that was not collected by October 12 would be auctioned or destroyed.

Free storage

In May, KPA amended free storage periods and tariffs for containers at the ICD in Embakasi, permitting four days of free storage.

But shippers say the waiver is a “quick-fix solution” to the complex problem of congestion that has choked the trade at the port for more than three months.

“The Government is losing a lot in terms of revenue due to these delays or congestion. Waivers are not the solution although they will ease our pain,” said Gilbert Langat.

Importers pay Sh1,500 and Sh2,200 for a 20-foot and a 40-foot container respectively after the four-day period until the container is removed from the port or loaded onto a vessel.
 
NOT EMPTY CONTAINERS Geza Ulole and your tblind patriot minions.
 
Geza Ulole We demand Answers. When is Bagamoyo Port beginning operations???
 
Wote wanapita kimya kimya wakielekea kumeza panadol
tapatalk_1537469109226.gif
 
subiri wale wa 1km railway waje
1538398979949.png
1538398979949.png
waturuki bado wanapambana na vumbi kichakani
1538399036329.png
1538398979949.png
1538399036329.png
hapana cheza na nyang'au...nyang'au habana macheso
1538399006251.png
1538398979949.png
1538399006251.png

1538399967816.png
 
Mimi naonaga nyie wakenya hamjielew kabisa huu uchafu wa 80km/h hamuoni aibu kuzungumzia,daaaaa!!
tunazungumzia reli inayofanya kazi my fren kufurusha mizigo chungu nzima na abiria...sio reli ya umeme ilio kwenye makaratasi...isitoshe tembo mweupe..
1538413977789.png
1538413977789.png
nyang'au habana macheso
 
Wale confused elements walikuwa wanasema eti hizo ni empty containers wako wapi? Geza uko wapi?
 
Aah wap mtungi wa chang'aa remain mtungi wa chang'aa till the day has been electrified!
 
Back
Top Bottom