TANESCO on the spot to guarantee SGR power

TANESCO on the spot to guarantee SGR power

Kweli wewe ni Mwendawazimu, muulize mk254 amesafiri vijiji vya Tz
Sasa tunagonga 70% access to Electricity,
Wewe unang'ang'ania hiyo 32% yako kama huyo mburula anaesema tuna mw 1350 wakati tunagonga 2000MW
Kazi mnayo.

Sent using Jamii Forums mobile app

Wacha kelele. Soma report. Then compare and contrast your Pedestrian numbers and the data backed up by this report. Gazeti yenyewe ni yenu

The Energy Access Situation Report 2016 released earlier this week by the National Bureau of Statistics and the Rural Energy Agency says that urban areas continued to have more access to electricity (65.3 per cent) compared to rural areas (16.9 per cent).
The findings of the report show that the country still has a long way to go to increase access to electricity as 67.2 per cent of all households in the country still don’t have electricity.
 


Sisi tunaendelea kutandika communication n power cables!
 
the article is published by the east african magazine from its headquarter offices in nairobi.

View attachment 848032View attachment 848033

Kwa sababu magazeti yenu hayana uthubutu, mnaishi Kikorea Korea kule kwa Kim ambapo wakiandika tu yanawakuta. Wenye mashaka na umeme wenu ni taasisi ya serikali ya Tanzania inayoitwa Tanzania Investment Committee, sio gazeti.
Tanesco wenyewe wamekiri distribution yao ni mbovu mno. Sasa wewe umeishia kuhoji gazeti...hehehe
 
Kwa sababu magazeti yenu hayana uthubutu, mnaishi Kikorea Korea kule kwa Kim ambapo wakiandika tu yanawakuta. Wenye mashaka na umeme wenu ni taasisi ya serikali ya Tanzania inayoitwa Tanzania Investment Committee, sio gazeti.
Tanesco wenyewe wamekiri distribution yao ni mbovu mno. Sasa wewe umeishia kuhoji gazeti...hehehe
nyinyi msioishi kikorea mbona mmeishia kununua gari moshi takataka. [emoji23][emoji23][emoji23]
 
😂you believe CCM propaganda. Same people who said tutagenga na pesa zetu za ndani😂
LDC should first have good power supply across the country not just in dar. To support such infrastructure you must have realizable power across the entire country. From Isaka to Manyoni, dodoma ni giza tupu
Where is Jubilee propaganda like that with the most modern gas fired combined cycles power plant in the region operating?
 
😁 😁 😁 in the short period of time we have seen tremendous progress in power penetration in the country now we're more than 70% connected so far in Tanzania it will scratch your 1350 Kenyan shillings to be connected hii kwenu haitakaa itokee kuingiwa umeme kwa 27,000 this is impossible miracle huko Kenya

Tuna kitu inaitwa REA now they are working scrambling the entire country like freelancers of cellular network providers.
Kwanza mtosheleze mji wenu wa Dar muache umeme wa mgao karne ya 21...Poor peoples land.
 
Kwanza mtosheleze mji wenu wa Dar muache umeme wa mgao karne ya 21...Poor peoples land.
Huo umeme wa mgao watokea wapi karne hii? Sisi hatuna umeme wa kulokoteza kwa majirani kama nyinyi sisi tunajitosheleza na kugawa nje ya nchi..
 
Huo umeme wa mgao watokea wapi karne hii? Sisi hatuna umeme wa kulokoteza kwa majirani kama nyinyi sisi tunajitosheleza na kugawa nje ya nchi..
Mnagawa wapi hio 1350 MW? 32% ya wabongo peke yake ndio wana access to electricity ama unafikiri mko LDC kimakosa?
 
Mnagawa wapi hio 1350 MW? 32% ya wabongo peke yake ndio wana access to electricity ama unafikiri mko LDC kimakosa?

You should update your figures, we're electricity donor country now which will never be in Kenya
 

You should update your figures, we're electricity donor country now which will never be in Kenya

wacha perepepe babaa soma rangi Somalia ligi yenui😉
fig1_color_2.jpg
 
nyinyi msioishi kikorea mbona mmeishia kununua gari moshi takataka. [emoji23][emoji23][emoji23]
Umeme wa 1350 MW ytatosheleza SGR kam hata Dar ni mgao tu? Hii nchi yenu ni ya vituko kweli.
 
Tanzania has majority of the country in the dark sasa how can you even begin to guarantee 24/7 uninterrupted supply for hii train.
with power interruptions and outages all over the LDC country this project looks very non viable. Ndio reason donors are running away from this project. not viable.
View attachment 848029
Wewe ni zuzu eti donors are running! So in your naive mind China is a donor in your SGR! No wonder mmeingia mikataba ya kujitoa kafala. Elimu yenu inafundisha kizungu tu

Sent using Jamii Forums mobile app
 
😂you believe CCM propaganda. Same people who said tutagenga na pesa zetu za ndani😂
LDC should first have good power supply across the country not just in dar. To support such infrastructure you must have realizable power across the entire country. From Isaka to Manyoni, dodoma ni giza tupu
Phase 1and 2 tunajenga kwa pesa za nani??
 
nyinyi msioishi kikorea mbona mmeishia kununua gari moshi takataka. [emoji23][emoji23][emoji23]

Gari moshi takataka ipi maana sina hizo habari, sisi leo hii tunaongelea kuunga Kampala wakati nyie hata asilimia 10% ya kasafu kenu kadogo ka kilomita 200 sijui mtafika lini.
Halafu mbali na mgao wa umeme, naona mtaongezewa na mgao wa maji pia Coast, Dar residents to run short of water on Monday
Wahi ukajaze mtung otherwise kesho hautaweza kuoga...hehehe
 
Back
Top Bottom