Tanzania kuomba mkopo kutoka benki kuu kwa ajili ya SGR

Tanzania kuomba mkopo kutoka benki kuu kwa ajili ya SGR

MK254

JF-Expert Member
Joined
May 11, 2013
Posts
32,408
Reaction score
50,809
Dah! Hawa watani wetu wa kusini almaarufu kama 'Wabongo', hivi hilo jina Bongo mlilitoa wapi wapi maana nilizoea kuskia kwamba Tanzania mambo hufanywa 'Kibongo bongo'.
Sasa mara mtajenga reli kwa pesa yenu, kwamba hela mnayo kwamba nyie hamuwezi kukopa, mara ndio hao mbio mnasaka mikopo, lipi tuwaamini, mje na kimoja.

Sisi pamoja na kwamba tunawazidi nyie kwa utajiri wa nchi, lakini tulikopa na ndio maana mnaona SGR yetu inachana mbuga, nyie bado mnazungushana na hadithi hadithi, hamueleweki eleweki, yaani mnafanya mambo Kibongo bongo.

-----------------------------------------------

Tanzania could turn to World Bank to finance the construction of its electric standard gauge railway (SGR).

Finance and Planning Minister Dr Philip Mpango on Monday said that the World Bank had expressed its intention to help fund the Isaka-Rusumo SGR section and Rwanda’s section from Rusumo border to Kigali, along with other transport infrastructure projects.

This would be an about-turn from President Magufuli’s earlier stance that Tanzania would finance its multibillion-dollar railway, aircraft modernisation and energy projects.

“We have the funds for the construction of the standard gauge railway until its completion from Dar to Isaka. We also have the resources internally to fund the construction of the Stiegler Gorge hydroelectricity project,” President Magufuli said in March.

About two years ago, President Magufuli asked for money to finance infrastructure project from the World Bank Group president Dr Jim Yong Kim, who was on a visit to Dar.
And now, Dar has announced setting aside over $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar and Morogoro; and the 336km Morogoro-Makutopora line.

This is significantly higher than the $392.23 million set aside in the current financial year.

Transport and works Minister Makame Mbarawa told parliament that an additional $435,821 had been set aside for a feasibility study into the proposed 371-kilometre SGR project linking Isaka and Rusumo in Rwanda.

Dr Mpango’s meeting with World Bank officials in Washington D.C. now sets in motion the discussions between Dar and Kigali over the railway project as the two countries look for a workable financing mix to actualise it.

The World Bank has in the last year increased its funding for Tanzania’s infrastructure projects, providing a $340 million loan last year to help Dar upgrade its port infrastructure.

Last year, the bank announced that Dar would be able to access up to $2.4 billion in concessional financing over the next three years, an increase of $500 million over previous allocation.

Out of this, $780 million would go into financing the Ubungo Interchange in Dar, while $225 million would fund the Second Water Sector Support Project, and a further $130 million provided as an additional financing for the Tanzania Strategic Cities Project leaving a further $1.13 billion for Dar to draw down for its other infrastructure projects.

Open tendering process

Last month, Dar and Kigali broke ranks with their regional neighbours, opting for an open tendering process for the SGR project as opposed to the Kenya and Uganda SGR project tendering system, which have been government to government agreements-driven tendering processes that emulates the build, finance and operate model.

It will, however, be interesting to see the financial financing model for the project given that the two countries have in the recent past preferred a different mix of models to fund their infrastructure projects.

“We have different financing models to choose from and I believe we will consider one that’s better for our people. At the moment, we can’t give a clear indication on what model we prefer as we have not reached that stage yet,” Mr Mbarawa added.

Tanzania turns to World Bank to fund its SGR
 
Dah! Hawa watani wetu wa kusini almaarufu kama 'Wabongo', hivi hilo jina Bongo mlilitoa wapi wapi maana nilizoea kuskia kwamba Tanzania mambo hufanywa 'Kibongo bongo'.
Sasa mara mtajenga reli kwa pesa yenu, kwamba hela mnayo kwamba nyie hamuwezi kukopa, mara ndio hao mbio mnasaka mikopo, lipi tuwaamini, mje na kimoja.

Sisi pamoja na kwamba tunawazidi nyie kwa utajiri wa nchi, lakini tulikopa na ndio maana mnaona SGR yetu inachana mbuga, nyie bado mnazungushana na hadithi hadithi, hamueleweki eleweki, yaani mnafanya mambo Kibongo bongo.

-----------------------------------------------

Tanzania could turn to World Bank to finance the construction of its electric standard gauge railway (SGR).

Finance and Planning Minister Dr Philip Mpango on Monday said that the World Bank had expressed its intention to help fund the Isaka-Rusumo SGR section and Rwanda’s section from Rusumo border to Kigali, along with other transport infrastructure projects.

This would be an about-turn from President Magufuli’s earlier stance that Tanzania would finance its multibillion-dollar railway, aircraft modernisation and energy projects.

“We have the funds for the construction of the standard gauge railway until its completion from Dar to Isaka. We also have the resources internally to fund the construction of the Stiegler Gorge hydroelectricity project,” President Magufuli said in March.

About two years ago, President Magufuli asked for money to finance infrastructure project from the World Bank Group president Dr Jim Yong Kim, who was on a visit to Dar.
And now, Dar has announced setting aside over $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar and Morogoro; and the 336km Morogoro-Makutopora line.

This is significantly higher than the $392.23 million set aside in the current financial year.

Transport and works Minister Makame Mbarawa told parliament that an additional $435,821 had been set aside for a feasibility study into the proposed 371-kilometre SGR project linking Isaka and Rusumo in Rwanda.

Dr Mpango’s meeting with World Bank officials in Washington D.C. now sets in motion the discussions between Dar and Kigali over the railway project as the two countries look for a workable financing mix to actualise it.

The World Bank has in the last year increased its funding for Tanzania’s infrastructure projects, providing a $340 million loan last year to help Dar upgrade its port infrastructure.

Last year, the bank announced that Dar would be able to access up to $2.4 billion in concessional financing over the next three years, an increase of $500 million over previous allocation.

Out of this, $780 million would go into financing the Ubungo Interchange in Dar, while $225 million would fund the Second Water Sector Support Project, and a further $130 million provided as an additional financing for the Tanzania Strategic Cities Project leaving a further $1.13 billion for Dar to draw down for its other infrastructure projects.

Open tendering process

Last month, Dar and Kigali broke ranks with their regional neighbours, opting for an open tendering process for the SGR project as opposed to the Kenya and Uganda SGR project tendering system, which have been government to government agreements-driven tendering processes that emulates the build, finance and operate model.

It will, however, be interesting to see the financial financing model for the project given that the two countries have in the recent past preferred a different mix of models to fund their infrastructure projects.

“We have different financing models to choose from and I believe we will consider one that’s better for our people. At the moment, we can’t give a clear indication on what model we prefer as we have not reached that stage yet,” Mr Mbarawa added.

Tanzania turns to World Bank to fund its SGR


Serikali yetu ilisema itajemga Reli ktk Dar-Morogoro kwa fedha za ndani na siyo yote, Serikali yetu haijawahi kusema kwamba ingejenga Reli yote kwa fedha za ndani bali ni kpande cha ktk Dar-Moro ndo fedha za ndani!
 
Joint WB loan with Rwanda at 3%. Good Move JPM..Rwanda is a poor country and cannot finance SGR without loan.
WB refused to fund Kenyan SGR and termed it uneconomical and silly..Seems that Tz SGR Makes more sense to WB economists
 
Serikali yetu ilisema itajemga Reli ktk Dar-Morogoro kwa fedha za ndani na siyo yote, Serikali yetu haijawahi kusema kwamba ingejenga Reli yote kwa fedha za ndani bali ni kpande cha ktk Dar-Moro ndo fedha za ndani!
Ni juzi tu mlituimbia mtajenga reli yenyu from Dar sijui to mwanza with $7.2 b all from your own coffers...kwani mna akili kusahau haraka kama ngiri? Tanzagiza bure kabisaa nyie mgejiita Wamboga wala sio Wabongo.
 
Dah! Hawa watani wetu wa kusini almaarufu kama 'Wabongo', hivi hilo jina Bongo mlilitoa wapi wapi maana nilizoea kuskia kwamba Tanzania mambo hufanywa 'Kibongo bongo'.
Sasa mara mtajenga reli kwa pesa yenu, kwamba hela mnayo kwamba nyie hamuwezi kukopa, mara ndio hao mbio mnasaka mikopo, lipi tuwaamini, mje na kimoja.

Sisi pamoja na kwamba tunawazidi nyie kwa utajiri wa nchi, lakini tulikopa na ndio maana mnaona SGR yetu inachana mbuga, nyie bado mnazungushana na hadithi hadithi, hamueleweki eleweki, yaani mnafanya mambo Kibongo bongo.

-----------------------------------------------

Tanzania could turn to World Bank to finance the construction of its electric standard gauge railway (SGR).

Finance and Planning Minister Dr Philip Mpango on Monday said that the World Bank had expressed its intention to help fund the Isaka-Rusumo SGR section and Rwanda’s section from Rusumo border to Kigali, along with other transport infrastructure projects.

This would be an about-turn from President Magufuli’s earlier stance that Tanzania would finance its multibillion-dollar railway, aircraft modernisation and energy projects.

“We have the funds for the construction of the standard gauge railway until its completion from Dar to Isaka. We also have the resources internally to fund the construction of the Stiegler Gorge hydroelectricity project,” President Magufuli said in March.

About two years ago, President Magufuli asked for money to finance infrastructure project from the World Bank Group president Dr Jim Yong Kim, who was on a visit to Dar.
And now, Dar has announced setting aside over $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar and Morogoro; and the 336km Morogoro-Makutopora line.

This is significantly higher than the $392.23 million set aside in the current financial year.

Transport and works Minister Makame Mbarawa told parliament that an additional $435,821 had been set aside for a feasibility study into the proposed 371-kilometre SGR project linking Isaka and Rusumo in Rwanda.

Dr Mpango’s meeting with World Bank officials in Washington D.C. now sets in motion the discussions between Dar and Kigali over the railway project as the two countries look for a workable financing mix to actualise it.

The World Bank has in the last year increased its funding for Tanzania’s infrastructure projects, providing a $340 million loan last year to help Dar upgrade its port infrastructure.

Last year, the bank announced that Dar would be able to access up to $2.4 billion in concessional financing over the next three years, an increase of $500 million over previous allocation.

Out of this, $780 million would go into financing the Ubungo Interchange in Dar, while $225 million would fund the Second Water Sector Support Project, and a further $130 million provided as an additional financing for the Tanzania Strategic Cities Project leaving a further $1.13 billion for Dar to draw down for its other infrastructure projects.

Open tendering process

Last month, Dar and Kigali broke ranks with their regional neighbours, opting for an open tendering process for the SGR project as opposed to the Kenya and Uganda SGR project tendering system, which have been government to government agreements-driven tendering processes that emulates the build, finance and operate model.

It will, however, be interesting to see the financial financing model for the project given that the two countries have in the recent past preferred a different mix of models to fund their infrastructure projects.

“We have different financing models to choose from and I believe we will consider one that’s better for our people. At the moment, we can’t give a clear indication on what model we prefer as we have not reached that stage yet,” Mr Mbarawa added.

Tanzania turns to World Bank to fund its SGR
Kwa machoko wote! JPM hajawahi sema $7.6 bln yote itatoka ndani! Phase I n II katoa toka ndani na bado kuna uwezekano wa phase nyingine kati ya III na VI serikali ika-finance.

 
Ni juzi tu mlituimbia mtajenga reli yenyu from Dar sijui to mwanza with $7.2 b all from your own coffers...kwani mna akili kusahau haraka kama ngiri? Tanzagiza bure kabisaa nyie mgejiita Wamboga wala sio Wabongo.


Siyo kweli, Serikali yetu haijawahi kusema hivyo, bali ilisema tunajenga kipande cha Dar-Moro/Dom na siyo SGR yote sasa sijui hayo mnayapata wapi!
 
Dah! Hawa watani wetu wa kusini almaarufu kama 'Wabongo', hivi hilo jina Bongo mlilitoa wapi wapi maana nilizoea kuskia kwamba Tanzania mambo hufanywa 'Kibongo bongo'.
Sasa mara mtajenga reli kwa pesa yenu, kwamba hela mnayo kwamba nyie hamuwezi kukopa, mara ndio hao mbio mnasaka mikopo, lipi tuwaamini, mje na kimoja.

Sisi pamoja na kwamba tunawazidi nyie kwa utajiri wa nchi, lakini tulikopa na ndio maana mnaona SGR yetu inachana mbuga, nyie bado mnazungushana na hadithi hadithi, hamueleweki eleweki, yaani mnafanya mambo Kibongo bongo.

-----------------------------------------------

Tanzania could turn to World Bank to finance the construction of its electric standard gauge railway (SGR).

Finance and Planning Minister Dr Philip Mpango on Monday said that the World Bank had expressed its intention to help fund the Isaka-Rusumo SGR section and Rwanda’s section from Rusumo border to Kigali, along with other transport infrastructure projects.

This would be an about-turn from President Magufuli’s earlier stance that Tanzania would finance its multibillion-dollar railway, aircraft modernisation and energy projects.

“We have the funds for the construction of the standard gauge railway until its completion from Dar to Isaka. We also have the resources internally to fund the construction of the Stiegler Gorge hydroelectricity project,” President Magufuli said in March.

About two years ago, President Magufuli asked for money to finance infrastructure project from the World Bank Group president Dr Jim Yong Kim, who was on a visit to Dar.
And now, Dar has announced setting aside over $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar and Morogoro; and the 336km Morogoro-Makutopora line.

This is significantly higher than the $392.23 million set aside in the current financial year.

Transport and works Minister Makame Mbarawa told parliament that an additional $435,821 had been set aside for a feasibility study into the proposed 371-kilometre SGR project linking Isaka and Rusumo in Rwanda.

Dr Mpango’s meeting with World Bank officials in Washington D.C. now sets in motion the discussions between Dar and Kigali over the railway project as the two countries look for a workable financing mix to actualise it.

The World Bank has in the last year increased its funding for Tanzania’s infrastructure projects, providing a $340 million loan last year to help Dar upgrade its port infrastructure.

Last year, the bank announced that Dar would be able to access up to $2.4 billion in concessional financing over the next three years, an increase of $500 million over previous allocation.

Out of this, $780 million would go into financing the Ubungo Interchange in Dar, while $225 million would fund the Second Water Sector Support Project, and a further $130 million provided as an additional financing for the Tanzania Strategic Cities Project leaving a further $1.13 billion for Dar to draw down for its other infrastructure projects.

Open tendering process

Last month, Dar and Kigali broke ranks with their regional neighbours, opting for an open tendering process for the SGR project as opposed to the Kenya and Uganda SGR project tendering system, which have been government to government agreements-driven tendering processes that emulates the build, finance and operate model.

It will, however, be interesting to see the financial financing model for the project given that the two countries have in the recent past preferred a different mix of models to fund their infrastructure projects.

“We have different financing models to choose from and I believe we will consider one that’s better for our people. At the moment, we can’t give a clear indication on what model we prefer as we have not reached that stage yet,” Mr Mbarawa added.

Tanzania turns to World Bank to fund its SGR
Mzigo tuna ubeba sisi wananchi!serikali kimya kimya wameongeza kodi ya SGR katika mafuta tegemea bei ya mafuta kupanda zaidi mwezi ujao
 
Waturuki wao kimyaa,wanasubiri hela tu....Kweli Endorgan ni noumer,sijui aliweza vipi kumpiku mchina,
maana saa hizi angekuwa mchina,tayari reli iko manyoni saa hizi
 
duh,hatareee...tunahela za kutosha kumbe mzee upara ni ushuzi tuu..😀
Dah! Hawa watani wetu wa kusini almaarufu kama 'Wabongo', hivi hilo jina Bongo mlilitoa wapi wapi maana nilizoea kuskia kwamba Tanzania mambo hufanywa 'Kibongo bongo'.
Sasa mara mtajenga reli kwa pesa yenu, kwamba hela mnayo kwamba nyie hamuwezi kukopa, mara ndio hao mbio mnasaka mikopo, lipi tuwaamini, mje na kimoja.

Sisi pamoja na kwamba tunawazidi nyie kwa utajiri wa nchi, lakini tulikopa na ndio maana mnaona SGR yetu inachana mbuga, nyie bado mnazungushana na hadithi hadithi, hamueleweki eleweki, yaani mnafanya mambo Kibongo bongo.

-----------------------------------------------

Tanzania could turn to World Bank to finance the construction of its electric standard gauge railway (SGR).

Finance and Planning Minister Dr Philip Mpango on Monday said that the World Bank had expressed its intention to help fund the Isaka-Rusumo SGR section and Rwanda’s section from Rusumo border to Kigali, along with other transport infrastructure projects.

This would be an about-turn from President Magufuli’s earlier stance that Tanzania would finance its multibillion-dollar railway, aircraft modernisation and energy projects.

“We have the funds for the construction of the standard gauge railway until its completion from Dar to Isaka. We also have the resources internally to fund the construction of the Stiegler Gorge hydroelectricity project,” President Magufuli said in March.

About two years ago, President Magufuli asked for money to finance infrastructure project from the World Bank Group president Dr Jim Yong Kim, who was on a visit to Dar.
And now, Dar has announced setting aside over $610 million in the 2018/19 budget for the construction of the 300km SGR between Dar and Morogoro; and the 336km Morogoro-Makutopora line.

This is significantly higher than the $392.23 million set aside in the current financial year.

Transport and works Minister Makame Mbarawa told parliament that an additional $435,821 had been set aside for a feasibility study into the proposed 371-kilometre SGR project linking Isaka and Rusumo in Rwanda.

Dr Mpango’s meeting with World Bank officials in Washington D.C. now sets in motion the discussions between Dar and Kigali over the railway project as the two countries look for a workable financing mix to actualise it.

The World Bank has in the last year increased its funding for Tanzania’s infrastructure projects, providing a $340 million loan last year to help Dar upgrade its port infrastructure.

Last year, the bank announced that Dar would be able to access up to $2.4 billion in concessional financing over the next three years, an increase of $500 million over previous allocation.

Out of this, $780 million would go into financing the Ubungo Interchange in Dar, while $225 million would fund the Second Water Sector Support Project, and a further $130 million provided as an additional financing for the Tanzania Strategic Cities Project leaving a further $1.13 billion for Dar to draw down for its other infrastructure projects.

Open tendering process

Last month, Dar and Kigali broke ranks with their regional neighbours, opting for an open tendering process for the SGR project as opposed to the Kenya and Uganda SGR project tendering system, which have been government to government agreements-driven tendering processes that emulates the build, finance and operate model.

It will, however, be interesting to see the financial financing model for the project given that the two countries have in the recent past preferred a different mix of models to fund their infrastructure projects.

“We have different financing models to choose from and I believe we will consider one that’s better for our people. At the moment, we can’t give a clear indication on what model we prefer as we have not reached that stage yet,” Mr Mbarawa added.

Tanzania turns to World Bank to fund its SGR
 
kuna Dada machachali pale Instagram amesema wanaenda kuandamana WB ili wa cancel loans
 
Waturuki wao kimyaa,wanasubiri hela tu....Kweli Endorgan ni noumer,sijui aliweza vipi kumpiku mchina,
maana saa hizi angekuwa mchina,tayari reli iko manyoni saa hizi

Hehehe wale nouma...
 
Serikali yetu ilisema itajemga Reli ktk Dar-Morogoro kwa fedha za ndani na siyo yote, Serikali yetu haijawahi kusema kwamba ingejenga Reli yote kwa fedha za ndani bali ni kpande cha ktk Dar-Moro ndo fedha za ndani!
Kwahiyo Dar-Moro kimekamilika ili sasa tutafute pesa ya kuendelea mbele au?
 