Tanzania is learning from the mistakes of kenya and has already avoided pitfalls like Lousy financing, Technology transfer mistakes etc. Should they continue diligently to learn from kenyan mistakes, Tz SGR will win all business in EAC
mbona mnaleta story nyingi, Nionyesheni ripoti ya Tz the so called 'transparent' project... atleast onyesheni the ESIA report!We have only seen a few pages leaked by ndii.
And then chinese have forced kenyan slaves to sign confidential agreement not to release any information on sgr 🙂
Unakomaa mpaka mishipa inakutoka! Lete ya Kenya kwanza ambayo ina pages 300mbona mnaleta story nyingi, Nionyesheni ripoti ya Tz the so called 'transparent' project... atleast onyesheni the ESIA report!
Dar es Salaam-Isaka-Kigali/Keza-Musongati Railway Project – Bringing life to the rail sector in East Africa You will find all the info on Economic suitability and etc for Tz SGR somethings have changed since 2016 which is I guess the last time that was updated, when I get time I findout the latest doc from my GoT sources.but basically its similar. Note this analysis was not done by yapi markez like in the case of kenya, it was done by a consortium of GoT economists and WB personnel.mbona mnaleta story nyingi, Nionyesheni ripoti ya Tz the so called 'transparent' project... atleast onyesheni the ESIA report!
Unakomaa mpaka mishipa inakutoka! Lete ya Kenya kwanza ambayo ina pages 300
Sent from my SM-J110H using JamiiForums mobile app
this prooves how much you dont know about Kenyas SGR yet you here everyday talking about it..when you have never read the most important document that explains everything about the document. .. Na ya tz pia haujui ... Non of you are qualified to even speak on this thread
Thread derailed by the very people who started it. Hawa huwa robots wa CCM hadi Ndii na eurobond imerushwa kwa mada sababu ikiwa kukosa hoja...I love Tanzanians, they are the easiest to intimidate and beat up kama Burukenge.
That site is just a FAQ ... but atleast its a start, I'll go through it in detail later...Dar es Salaam-Isaka-Kigali/Keza-Musongati Railway Project – Bringing life to the rail sector in East Africa You will find all the info on Economic suitability and etc for Tz SGR somethings have changed since 2016 which is I guess the last time that was updated, when I get time I findout the latest doc from my GoT sources.but basically its similar. Note this analysis was not done by yapi markez like in the case of kenya, it was done by a consortium of GoT economists and WB personnel.
Would you expect the contractor CRBC to say the project is unviable and loose the contract and ExiM bank to loose a $4bn lending opportunity?
What you are asking for If I understand you right is a technical project Design document. That is the property of Yapi Merkez. -When and where bridges,ICDs will be built, environmental measures etc.You cannot get that anywhere its copyrightedThat site is just a FAQ ... but atleast its a start, I'll go through it in detail later...
About the feasibility study... I, m not asking for it to see if the projects are economically viable... It doesnt even have to be a feasibility study document... an Environmental and social impact assessment would be sufficient...
I just need a document that explains the project in details, like why bridges will be built here or there, why electric power was chosen, where will ICDs be located if they are justified, whats the capacity of train station throughput, ..... For Kenyas example... most public projects wont have a feasibility study report found online but every public project must submit an ESIA report to NEMA to be approved... in that report will contain every detail about the project from the scale of the project even how much sand will be u§ed
What you are asking for If I understand you right is a technical project Design document. That is the property of Yapi Merkez. -When and where bridges,ICDs will be built, environmental measures etc.You cannot get that anywhere its copyrightedThat site is just a FAQ ... but atleast its a start, I'll go through it in detail later...
About the feasibility study... I, m not asking for it to see if the projects are economically viable... It doesnt even have to be a feasibility study document... an Environmental and social impact assessment would be sufficient...
I just need a document that explains the project in details, like why bridges will be built here or there, why electric power was chosen, where will ICDs be located if they are justified, whats the capacity of train station throughput, ..... For Kenyas example... most public projects wont have a feasibility study report found online but every public project must submit an ESIA report to NEMA to be approved... in that report will contain every detail about the project from the scale of the project even how much sand will be u§ed
Don't be stupid. The Tanzania SGR is the design and build project. Hope you understand what that meansunder the right to information....Yes.. you can even go to court to force the government to publish it ...maybe your laws dont work that way... There is no justification for govt to hold details of such a public peoject...
Even if they cant release the document, there is usually two feasibility study document, one is more technical and anotherone is created for public which is usually summarized to be understood by laymans...
Haya basi naona umeingia na pupa si utupe evidence, umeona wenzako walitoroka kimya kimya...hawana hoja.Don't be stupid. The Tanzania SGR is the design and build project. Hope you understand what that means
Vipi Mulisaa. Wewe umepotea sanaDon't be stupid. The Tanzania SGR is the design and build project. Hope you understand what that means
You are very knowledgeable on these mattersThat site is just a FAQ ... but atleast its a start, I'll go through it in detail later...
About the feasibility study... I, m not asking for it to see if the projects are economically viable... It doesnt even have to be a feasibility study document... an Environmental and social impact assessment would be sufficient...
I just need a document that explains the project in details, like why bridges will be built here or there, why electric power was chosen, where will ICDs be located if they are justified, whats the capacity of train station throughput, ..... For Kenyas example... most public projects wont have a feasibility study report found online but every public project must submit an ESIA report to NEMA to be approved... in that report will contain every detail about the project from the scale of the project even how much sand will be u§ed
Unasifia ujingaYou are very knowledgeable on these matters
Kwanza ya Kenya ni bora kusafir na basi kulko ile sgr yao [emoji16][emoji16][emoji16]et sgr inazdiwa speed na basi kwel jmn
Kenya mnashda maan mpk deni lirud kwa mchina ndo mpate profit na cjui n Lin maskin wa mungu