Cost comparison SGR Kenya vs SGR Tanzania

This tunnel can not allow doubletrack wagons!
Not that you'll remeber this after a few days...


But regular wagons have a higher height (Between the rail and the wagon bed) - You can see the train wheels





The double stack wagons have much lower clearance you cant even see the train wheels


Therefore, half of the container disappears inside the wagon this the height of double stacked wagons is lower i.e its not the same as putting two containers ontop of each other on a regular wagon.




This is the same 60 x2k model double stack wagon in use in China passing through a tunnel of the same height (7.5m) as the Kenyan tunnel , and in addition, this tunnel in China has some overhead electric lines and the wagons still don't touch !!!!

 
logistical facilities sprouting up along the SGR corridor mainly Mombasa, Athi river and Nairobi

Conveyor belts and storage facilities for refrigerated goods, grain, coal,clinker(used for manufacture of cement) etc ...

 
Whats happening to my pictures??? did JF change its policy on posting or something?
 
SGR Dar-Morogoro: PM's visit at marshalling yard n workshops in Ruvu




Dry port projectt: PM's visit at Kwala ICD



CC: Tony254
 
SGR Dar-Morogoro: PM's visit at Morogoro SGR station
 
ziko 13... umeridhika??
Please find other people to cheat. Tanzanian Air Force only have four helicopters of which three r Airbus helicopters only remaining one is Bell ba 205
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…