if profit rose to Kshs 8.8 bln from Kshs 3.7bln in 2019 that means the figure Kshs 8.8 bln is for 2020 and we r in January! stop being a fool like ur media!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
if profit rose to Kshs 8.8 bln from Kshs 3.7bln in 2019 that means the figure Kshs 8.8 bln is for 2020 and we r in January! stop being a fool like ur media!
if profit rose to Kshs 8.8 bln from Kshs 3.7bln in 2019 that means the figure Kshs 8.8 bln is for 2020 and we r in January! stop being a fool like ur media!
see capital FM heading how did they get the value of 2020 in January? a forecast? 😀The results were released in 2020, that's what I meant. The figures nazo ni za 2019. I know kingereza ndio shida kwako.
Sent using Jamii Forums mobile app
Wapi wamesema hapo ni value ya 2020? We Mzee you need to attend English classes.see capital FM heading how did they get the value of 2020 in January? a forecast? 😀
Not surprised cause in Kenya projected r being launched before they exist!
They said profit rose from kshs 3.3bln in 2019! In finance profit is counted on yearly basis! We r in 2020 unless there's another year btn 2019 n 2020 u sound stupid by keeping arguing!Wapi wamesema hapo ni value ya 2020? We Mzee you need to attend English classes.
Sent using Jamii Forums mobile app
Between me and you who is stupid? Let me break it down for you kama kingereza ndio shida kwako. In 2018 SGR made ksh3b and in 2019 it made ksh8.8b. Soma hiyo tweet vizuri uelewe.They said profit rose from kshs 3.3bln in 2019! In finance profit is counted on yearly basis! We r in 2020 unless there's another year btn 2019 n 2020 u sound stupid by keeping arguing!
Nashangaa isn't Tanesco a government parastatal(?). Doesn't that mean it's the GOT that incurs it's costs? Mbona hujielewi?and yet not electrified n SGR track not joint welded!
While Mombasa-Naivasha diesel SGR track length 609+120= 726 km is $3.8+1.5= $5.4 bln, our Dar-Makutupora SGR track length of over 700km (305km SGR I+409km SGR II) of electrified joint welded SGR is $3.1 (1.2 SGR I + 1.9 SGR II) bln as TL is not part of the TRC cost but part of Tanesco's costs! As for structures the Ruvu bridge across swampy Ruvu basin is 3 km n Dar viaduct is 2 km! As for tunnels there r also tunnels (whose lengths are T1 424 m, T2 1.031 m, T3 318 m and T4 847 m) for Morogoro -Makutupora with a total length of 2.6 km!
Developed countries pia wamepaka rangi mfumo wao wa BRT.. What's your point? 😹Kenya has done a very big mistake to rush into SGR without much exploration about it.
You can not upgrade into electrified SGR while you struggle to get money to pay debt of the already running SGR.
It is going to take so long until you move out of that mess meanwhile the rest of landlocked countries are rushing to Tanzania to be part of the modern electrified SGR.
Truth be told, you always want to be ahead of others in EAC. when we started BRT system , you rushed into marking the roads with paint so that u can deploy this system and being in the frontline of modernity in EAC but you failed.
Now this SGR you rushed into, it is going to embarrass you when the first electrified SGR in EAC start working.
Sent from my iPhone using JamiiForums
yap but cost of power transmission that any other power transmission company supposed to meet! It is not the cost of buidling SGR!Nashangaa isn't Tanesco a government parastatal(?). Doesn't that mean it's the GOT that incurs it's costs? Mbona hujielewi?
Developed countries pia wamepaka rangi mfumo wao wa BRT.. What's your point? 😹
You just don't get it? The line is dedicated to serve your SGR meaning technically the cost of building it is indeed part of your SGR. Isn't your SGR supposed to be electrified? When you add up all these associated costs then and ONLY then can you compare the true cost of your line vis a vis the Kenyan SGRyap but cost of power transmission that any other power transmission company supposed to meet! It is not the cost of buidling SGR!
Tanesco is legally obligated to do power transmission! There is around 5 transmission lines U/C around the country! Even if u factor in still ur 728 km SGR is way expensive than our 708 km electrical SGR!You just don't get it? The line is dedicated to serve your SGR meaning technically the cost of building it is indeed part of your SGR. Isn't your SGR supposed to be electrified? When you add up all these associated costs then and ONLY then can you compare the true cost of your line vis a vis the Kenyan SGR
But why should transmission line cost be factored in the electrical SGR cost? Isn't transmission line the duty of an electrical company? Assuming we r factoring in the $150 mln for TL still the cost will be lower in comparison to ur diesel SGR! 1.2 bln + 1.9 bln=3.1+0.15= $3.25 bln! Then add says $400 mln for locomotives! then u get $3.65 bln for Dar-Makutupora (336+205) 541 km which less than the cost of $3.8 bln for Mombasa-Nrb diesel SGR of length 472 km!
Teargass Kafrican
Buda hanging basket technology implies the method which the bridges are constructed.Laggard, hanging basket technology has been in Tanzania since 1970s (during black n white photos era) across Mpanga river! Check TAZARA a replica of ur bridges n viaducts across Thika River!
![]()
![]()
![]()
![]()
Some bridges with hanging basket technology across TAZARA
![]()
![]()
![]()
On January 10, China State Councilor and Foreign Minister Wang Yi said this!
Buda hanging basket technology implies the method which the bridges are constructed.
But why should transmission line cost be factored in the electrical SGR cost? Isn't transmission line the duty of an electrical company? Assuming we r factoring in the $150 mln for TL still the cost will be lower in comparison to ur diesel SGR! 1.2 bln + 1.9 bln=3.1+0.15= $3.25 bln! Then add says $400 mln for locomotives! then u get $3.65 bln for Dar-Makutupora (336+205) 541 km which less than the cost of $3.8 bln for Mombasa-Nrb diesel SGR of length 472 km!
Teargass Kafrican
so u r urguing with China's foreign minister? BTW the structure is the same right? 😀 😀 😀 😀 ☝Buda hanging basket technology implies the method which the bridges are constructed.
Sawasawa Lyrical WaxerEven that still ur diesel mtambo wa chang'aa is way expensive than electrical SGR in Tanzania
The structures being the same is a non issue here. We are talking about HOW these structures were built.so u r urguing with China's foreign minister? BTW the structure is the same right? 😀 😀 😀 😀 ☝
yap $5.4 bln ($3.8bln phase I+ $1.5 phase 2A) for 728 km track length of diesel SGR vs 722 km ( $1.2 bln phase I 300km Dar-Morogoro + phase II $1.9 bln 422km Morogoro-Dodoma-Makutupora) Dar-Makutupora of electrical SGR for $3.1 bln!Sawasawa Lyrical Waxer
Congratulations 🌚yap $5.4 bln ($3.8bln phase I+ $1.5 phase 2A) for 728 km track length of diesel SGR vs 708 km Dar-Makutupora of electrical SGR for $3.1 bln!
u know than Chinese Foreign Minister the only thing different Chinese FM said is for the first time in History China could deploy 100% chinese made machines at Kenya SGR meaning during TAZARA machines from other nations were used!The structures being the same is a non issue here. We are talking about HOW these structures were built.


Ah, nimeosha mkono, nimeshindwa kukuelimisha,kila nao jaribu ndo unazidi kuchanganyikiwa zaidi!!!!So there is no existing TL from Kinyerezi to Morogoro? Electrification means dedicated TL for SGR! Where u not arguing about already existing TL in Tanzania? Can u substantiate that any TL at all was covered with that $4.4 bln SGR?
BTW what was that $240 mln signed for? Ni mnaibiwa kipumbavu hivyo?
However, Kenya Railways Corporation (KRC) managing director Mr Atanas Maina said in a television interview last month that the country lacks the reliability of supply needed to sustain the operation of an electrified railway. “It was something that we would love to have, however, the country does not have a dependable source of electricity,” he says.
Ketraco says power for the SGR will be provided by geothermal plants, reducing CO2 emissions from train operations to zero.
Electrification is due to be completed within 28 months.
![]()
Kenya SGR electrification contract signed
The latest news and analysis of the global railway industry from the world's leading international publication.www.railjournal.com
I factored in that $150 mln for TL!Ah, nimeosha mkono, nimeshindwa kukuelimisha,kila nao jaribu ndo unazidi kuchanganyikiwa zaidi!!!!
But why should transmission line cost be factored in the electrical SGR cost? Isn't transmission line the duty of an electrical company? Assuming we r factoring in the $150 mln for TL still the cost will be lower in comparison to ur diesel SGR! 1.2 bln + 1.9 bln=3.1+0.15= $3.25 bln! Then add says $400 mln for locomotives! then u get $3.65 bln for Dar-Makutupora (336+205) 541 km which less than the cost of $3.8 bln for Mombasa-Nrb diesel SGR of length 472 km! And if u add up the cost of ur SGR phase 2A 120 km the cost jump to $5.3bln for 592km of diesel SGR!
Teargass Kafrican