Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Hiyo train ya 6 compartments gharama yake ni USD 7 million it is cheaper than diesel propelled. Hizo tulizonunua ni chache zianze kazi kwa kipande cha Dar Moro tuu. Sasa piga hesabu USD 60m utapata ngapi? Mzigo mwingine utaongezwa gradually vipande vingine vya reli vikikamilika
The $60 was to buy both the passengers train and cargo trains. And if I'm honest with you, your govt won't manage even to buy three of passengers itx train and the cargo train.
 
Kuwa na heshima chizi wewe!
2793413_Screenshot_2021-05-31_at_19.00.49.png



2793412_Screenshot_2021-05-31_at_18.59.50.png



VS


abe88ef9-99f4-4cf2-a0c7-7b94ae522e46.jpeg



SGR-coach-in-Kenya-1024x685-1-768x514.jpg
Cheki hio Train🔥🇰🇪🔥 Na haturingi😃
 
The $60 was to buy both the passengers train and cargo trains. And if I'm honest with you, your govt won't manage even to buy three of passengers itx train and the cargo train.
You have not followed the news well the Director General said there will be a series of contracts after that one of 60m
 
Kwahiyo nyie umeme hamtaki [emoji1787][emoji1787][emoji1787][emoji1787]
Sisi hata tukinunua kutoka kwenu tutanunua 100 MW au 200 MW pekee kwa sababu tuna umeme wetu surplus na pia tumeunganisha nyaya zetu za umeme na Ethiopia. Umeme wenu utakaobaki mtapeleka wapi? Tumieni akili saa zingine bwana.
 
Sisi hata tukinunua kutoka kwenu tutanunua 100 MW au 200 MW pekee kwa sababu tuna umeme wetu surplus na pia tumeunganisha nyaya za na Ethiopia. Umeme wenu utakaobaki mtapeleka wapi? Tumieni akili saa zingine bwana.
Wacha unyoko kwani Southern Africa powerpool ipo kwa ajili gani?


Najua roho inakuuma Tanesco is about to sell at least 1000 MW to the region!
 
Wacha unyoko kwani Southern Africa powerpool ipo kwa ajili gani?
Wacha ujinga. Unadhani mimi ni mjinga? Huwezi kunidanganya. Tanzania bado hamjaunganisha grid yenu na Southern Africa power pool.
 
Wacha ujinga. Unadhani mimi ni mjinga? Huwezi kunidanganya. Tanzania bado hamjaunganisha grid yenu na Southern Africa power pool.


SADC records progress in flagship interconnector power projects

3 months ago

sadc22-360x200.jpg


Business Reporter
THE Southern African Development Community (Sadc) says notable progress has been achieved towards implementation of priority energy interconnector projects in the region.

The projects seek to connect Angola, Malawi and Tanzania to the Southern African Power Pool (SAPP) grid. The Zambia-Tanzania interconnector is divided into several components and is at construction phase from both sides where the two transmission lines are designed to converge near Nakonde Border by 2022.


The Angola-Namibia Interconnector is at feasibility study stage and is also expected to be commissioned by 2022 following expression of commitment by the two member states by signing the inter-governmental memorandum of understanding (IGMOU).

According to the progress report by the Sadc secretariate to the 40th Sadc Summit, the Mozambique-Malawi interconnector attained financial closure and is at construction stage. The project is expected to be commissioned in 2022.

Angola and the Democratic Republic of Congo (DRC) are also considering developing an interconnector project, which is still at pre-feasibility stage.

The Sadc secretariat is advocating for the development of the western transmission corridor along Angola, Botswana, Namibia and central transmission corridor along Botswana, South Africa, Tanzania, Zambia and Zimbabwe.

Plans are also underway to develop eastern corridors along South Africa, Mozambique, Malawi and Tanzania of the SAPP network in order to relieve congestion from the existing central corridor.

Moreover, in order to unlock and leverage development of the power transmission interconnector projects, backbone transmission lines as well as those linked to the new power plants, the Sadc secretariat in collaboration with SAPP and through support from the World Bank, is developing a study on establishment of a Regional Transmission Infrastructure Financing Facility (RTIFF).

Recommendations of the study are set to be presented to relevant sectoral ministerial committees for clearance and ultimately to Council of Ministers for consideration and approval.

The regional bloc also said the operationalisation of the Sadc Centre for Renewable Energy and Energy Efficiency (SACREEE) was ongoing with the secretariat having secured signing of inter-governmental memorandum of agreement by 10 member states namely Angola, Botswana, Eswatini, Lesotho, Malawi, Mauritius, Namibia, Tanzania, Zambia and Zimbabwe.



MY TAKE
Uachage ufalamanga! GoT haikurupuki kuna miradi mingi inafanyika tena under SADC! Ati tujenge mradi wa $3 bln halafu tushindwe ku-organize transmission grid! Una wazimu wewe!
 

SADC records progress in flagship interconnector power projects

3 months ago

sadc22-360x200.jpg


Business Reporter
THE Southern African Development Community (Sadc) says notable progress has been achieved towards implementation of priority energy interconnector projects in the region.

The projects seek to connect Angola, Malawi and Tanzania to the Southern African Power Pool (SAPP) grid. The Zambia-Tanzania interconnector is divided into several components and is at construction phase from both sides where the two transmission lines are designed to converge near Nakonde Border by 2022.


The Angola-Namibia Interconnector is at feasibility study stage and is also expected to be commissioned by 2022 following expression of commitment by the two member states by signing the inter-governmental memorandum of understanding (IGMOU).

According to the progress report by the Sadc secretariate to the 40th Sadc Summit, the Mozambique-Malawi interconnector attained financial closure and is at construction stage. The project is expected to be commissioned in 2022.

Angola and the Democratic Republic of Congo (DRC) are also considering developing an interconnector project, which is still at pre-feasibility stage.

The Sadc secretariat is advocating for the development of the western transmission corridor along Angola, Botswana, Namibia and central transmission corridor along Botswana, South Africa, Tanzania, Zambia and Zimbabwe.

Plans are also underway to develop eastern corridors along South Africa, Mozambique, Malawi and Tanzania of the SAPP network in order to relieve congestion from the existing central corridor.

Moreover, in order to unlock and leverage development of the power transmission interconnector projects, backbone transmission lines as well as those linked to the new power plants, the Sadc secretariat in collaboration with SAPP and through support from the World Bank, is developing a study on establishment of a Regional Transmission Infrastructure Financing Facility (RTIFF).

Recommendations of the study are set to be presented to relevant sectoral ministerial committees for clearance and ultimately to Council of Ministers for consideration and approval.

The regional bloc also said the operationalisation of the Sadc Centre for Renewable Energy and Energy Efficiency (SACREEE) was ongoing with the secretariat having secured signing of inter-governmental memorandum of agreement by 10 member states namely Angola, Botswana, Eswatini, Lesotho, Malawi, Mauritius, Namibia, Tanzania, Zambia and Zimbabwe.



MY TAKE
Uachage ufalamanga! GoT haikurupuki kuna miradi mingi inafanyika tena under SADC! Ati tujenge mradi wa $3 bln halafu tushindwe ku-organize transmission grid! Una wazimu wewe!
Miradi zenu zinavyochelewa hovyo, hata hio 2022 deadline itafika na kupita bila power connector project hio kukamilika.
 
Miradi zenu zinavyochelewa hovyo, hata hio 2022 deadline itafika na kupita bila power connector project hio kukamilika.
Uko so demoralized to an extent unatu-bewitch! Now unatuambia miradi inachelewa! Yenyu intergrid connection Ethiopia-Kenya kila siku mnaimba imeisha ila on the ground vitu viko tofauti!

BTW juzi tu ulikuwa unabisha kwamba hamna ujenzi unaendelea Tanzania on EAPP!

Wacha ufala tafuta cha kufanya miradi ya Kisumu International Stadium tumewaachia nyie!

Sikiliza watu wako wakiongea. Nina uhakika ho umeme wenu wa geothermal wa bei ghali hautaona nyeupe!

 
Uko so demoralized to an extent unatu-bewitch! Now unatuambia miradi inachelewa! Yenyu intergrid connection Ethiopia-Kenya kila siku mnaimba imeisha ila on the ground vitu viko tofauti!

BTW juzi tu ulikuwa unabisha kwamba hamna ujenzi unaendelea Tanzania on EAPP!

Wacha usenge tafuta cha kufanya miradi ya Kisumu International Stadium tumewaachia nyie!
Kenya-Ethiopia inter-connector power project imekamilika. Sasa line hio inakuwa energized. Na kufanyiwa final testing. Sisi huwa hatucheleweshi miradi kama nyinyi. Kitakachofuata ni Waziri mkuu wa Ethiopia na rais wa Kenya kutafuta siku maalum kwenye diary yao watakapokutana na kuzindua mradi huu kwa pamoja. Soma hapa chini wiki uliopita Ketraco iliconfirm kwamba ujenzi wenyewe umekamilika imebaki testing na energization procedures ili mradi uzinduliwe. Hii ndio the first 500 KV DC line in Africa







 
Kenya-Ethiopia inter-connector power project imekamilika. Sasa line hio inakuwa energized. Na kufanyiwa final testing. Sisi huwa hatucheleweshi miradi kama nyinyi. Kitakachofuata ni Waziri mkuu wa Ethiopia na rais wa Kenya kutafuta siku maalum kwenye diary yao watakapokutana na kuzindua mradi huu kwa pamoja. Soma hapa chini wiki uliopita Ketraco iliconfirm kwamba ujenzi wenyewe umekamilika imebaki testing na energization procedures ili mradi uzinduliwe. Hii ndio the first 500 KV DC line in Africa








Sisi tuna miradi kama hii (transmission gridlength) chungu nzima ndani ya nchi! ulishapewa ramani ya miradi ya tanesco ila uchoko unakusumbua! labda utuambie mradi wenu umeanza lini?
 
Sisi tuna miradi kama hii (transmission gridlength) chungu nzima ndani ya nchi! ulishapewa ramani ya miradi ya tanesco ila uchoko unakusumbua! labda utuambie mradi wenu umeanza lini?

Nyinyi hamna mradi kama huu. Wacha uongo. Afrika nzima hakuna powerline hata moja ya DC (direct current) isipokuwa hii. Hii ndio the first DC current powerline in Africa. Pia Africa nzima haina powerline yenye 500 KV (kilovolts) ratings. Hii ndio the first 500 KV powerline in Africa. Tafuta mtu mwingine wa kudanganya kwamba mna mradi spesheli kama huu wetu. Nyinyi huwa mpo nyuma siku zote. Halafu huwa mnapenda kutufuata. Hivi karibuni utasikia eti hata nyinyi mnataka kuanzisha ujenzi wa DC powerline.
 
Nyinyi hamna mradi kama huu. Wacha uongo. Afrika nzima hakuna powerline hata moja ya DC (direct current) isipokuwa hii. Hii ndio the first DC current powerline in Africa. Pia Africa nzima haina powerline yenye 500 KV (kilovolts) ratings. Hii ndio the first 500 KV powerline in Africa. Tafuta mtu mwingine wa kudanganya kwamba mna mradi spesheli kama huu wetu. Nyinyi huwa mpo nyuma siku zote. Halafu huwa mnapenda kutufuata. Hivi karibuni utasikia eti hata nyinyi mnataka kuanzisha ujenzi wa DC powerline.
Kwani what does it take ku-upgrade a 400kV to 500 kV? Hii sio sector yako punguza upumbavu! If u will take a little understanding of power formulars u will know how can the voltage be manipulated into increasing the capacity of a transmission line!

Transmission​

TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.

TANESCO’s Future Plan

TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).

Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.





Over 280 km grid connection








Picha

GOVT UPBEAT ON JNHP FUNDING

SUNDAY NEWS Reporter

10/04/2021


PRIME Minister Kassim Majaliwa on Saturday assured Tanzanians that the government will continue to provide funds for the construction of Julius Nyerere Hydropower Project (JNHP) so that it could be completed on time.

The Premier said the government will do everything in its capacity to ensure the project is completed as scheduled and as per agreed international standards.

He was speaking after a working tour at the site, where he inspected progress of the multibillion project.

The project is scheduled to be completed in June, 2022. According to Mr Majaliwa, everything is set to ensure smooth continuous funding of the project.

“I would like to ensure the public that the government is committed and focused to continue funding this strategic project, which is designed to bring both social and economic changes to all Tanzanians,” said the Premier.

Mr Majaliwa said the project is expected to generate 2115MW and lower costs among wananchi.

“Currently Tanzania generates 1,500MW from other sources, with the additional 2115Mw from JNHP, the country will be able to export excess electricity to neighbouring countries,” he said.

He expressed his satisfaction with the progress in the implementation of the project, saying taxpayers’ money is being used properly.

“I am satisfied with the good job under Arab Contractors and Elsewedy Electric companies, all from Egypt. The good performance has so far been recorded under good supervision of Tanzania Electric Supply Company Limited (TANESCO), Tanzania National Roads Agency (TANROADS) and the Ministry of Energy,” noted Mr Majaliwa.

He said the government invested in the project knowing clearly that hydropower projects are cheaper compared to other sources of electricity.

The Premier said generating one unit from hydropower project costs between 36/- and 50/-, while electricity that is generated from other sources such as oil costs between 440/- and 600/- per unit.

“We therefore focused on hydropower because it is cheaper compared to other sources, and this will enable the government to reduce cost of electricity which is supplied to Tanzanians,” he noted.

Moreover, Mr Majaliwa said the project has also helped to generate employment to Tanzanians who are involved in the construction.

He said some Tanzanians supply construction materials, fuel, food and other services that are required at the site. The Premier revealed that TANESCO has already announced the tender for construction of a main power transmission line from JNHP to Chalinze in Coast region.

He said from Chalinze, other two lines will be constructed towards Dodoma and Dar es Salaam to enable supply of power to all regions in the country. Mr Majaliwa has also ordered the Ministry of Energy to identify all challenges that may lead to any delay of the completion of the project and make sure they are resolved.

"I am also asking wananchi who live along the project area to cooperate with contractors and all workers in this project by assuring them security and protection for their properties, including the machines,” he said.

Earlier, Deputy Minister for Energy, Mr Stephen Byabato said the government has so far provided over 2tri/- for the implementation of the project. Upon completion, the project is expected to cost 6.5tri/.

 
Kwani what does it take ku-upgrade a 400kV to 500 kV? Hii sio sector yako punguza upumbavu! If u will take a little understanding of power formulars u will know how can the voltage be manipulated into increasing the capacity of a transmission line!

Transmission​

TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.

TANESCO’s Future Plan

TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).

Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.

Over 280 km grid connection

Hata mkifaulu kuconvert 400 kv into 500 kv hio bado itabaki kuwa 500 kv AC line. Nimesema kwamba mradi wa Kenya-Ethiopia interconnector project is the first DC powerline in Africa. Hebu tupatie pongezi na hongera zetu.
 
Hata mkifaulu kuconvert 400 kv into 500 kv hio bado itabaki kuwa 500 kv AC line. Nimesema kwamba mradi wa Kenya-Ethiopia interconnector project is the first DC powerline in Africa. Hebu tupatie pongezi na hongera zetu.

Kwa engineer kama mimi siwezi kukupa hongera kwavile najua si achievement ya kujisifu namna hiyo!




E2Kvty9XMAExlzr





E2KvnUHWYA0-dQB






E2Kvo0mXEAMsP1h




E2Kvi6KXsAYEfWA
 
Engineer mwenye hajui advantages nyingi za DC powerline compared to AC powerline?

It depends on what u want to achieve! Get the basics first! From ur DC interconnector grid with Ethiopia u will not be able to sell power to Ethiopia whereas for us we can buy and sell to our neighbors! Whether DC or AC i believe none of the countries will buy power from Kenya as it is way expensive than what Ethiopia and Tanzania will offer in through these interconnector powergrids i.e. EAPP and SAPP.

BTW it is possible to covert AC to DC!





EnRlMdxXIAMPKxu




 