Go to ketraco website, idiot. Here you are touting a village line stop being mediocre and know your place.This fake, I can't argue with you without fact, bring facts not this gibberish
Then remove all your posts cause all you have posted sofar are groundbreaking ceremonies while other Kenyans have been posting completed projects. We knowJPM is the king of groundbreaking ceremonies starting with the pipeline project which he has layed foundation stone on three different occasions now. ItvPlease try to bring something tangible, this is just a dream for connecting the region, has absolutely zero sense
62km 132kV Chemosit – Kisii lineThis fake, I can't argue with you without fact, bring facts not this gibberish
This fake, I can't argue with you without fact, bring facts not this gibberishWe have those all over kenya transmitting power from Olkaria and other power stations. You people are excited about very mediocre things.
Completed transmission line projects by ketraco (Kenya Transmission Company) so far:
- 2,650km of 132kV lines;
- 2,700km of 220kV lines;
- 2,000km 400kV lines; and
- 612km of 500kV HVDC lines.
Please keep your power we are connected to ethiopia and uganda, we do not need your power!
Hahaha we have this rubbish all over the country, note, Tanzania is almost two times bigger than your tinny desert62km 132kV Chemosit – Kisii line
• 48km 132kV Rabai Galu line
• 77km 132kV Kilimambogo – Thika – Githambo line
• 20km 132kV Thika – Gatundu (Nyaga) line
• 34km 132kV Mumias – Rangala line
• 122km 132kV Kamburu – Meru line
• 234km 132kV Kindaruma – Mwingi – Garissa line
• 33km 132kV Sotik – Bomet line
• 66km 132kV Eldoret – Kitale line
• 107km 132kV Machakos – Konza, Isinya – Namanga line
• 96km 132kV Nanyuki – Isiolo – Meru line
• 106km 132kV Sondu – Homabay Ndhiwa – Awendo lne
• 44km 132kV Kisii – Awendo line
• 65km 132kV Lessos – Kabarnet line
• 79km 132kV Nanyuki – Nyahururu (Rumuruti) line
• 68km 132kV Olkaria – Narok line
• 153km 132kV Mwingi – Kitui – Wote – Sultan Hamud line
• 33km 132kV Ishiara – Kieni line
• 90km 220kV Turkwel - Ortum line
Actually that is not for us to buy your power, it is to be connected to the kenya ethiopia line so that power from the grand renaissance dam in ethiopia (The largest dam in Africa) can be sold to you and other southern african countries. Again keep your power you will buy from ethiopia through kenya.This fake, I can't argue with you without fact, bring facts not this gibberish
Kenya Tanzania interconnection to connect to Southern Africa Power Pool | Africa Energy Portal
The Tanzania Electric Supply Company (TANESCO) is set to connect the Kenya and Tanzania power to the Southern Africa Power Pool (SAPP) through a 400kV transmission line. Emmanuel Manirabona, TANESCO’s Senior Manager Projects confirmed the reports and said the interconnection will begin with...africa-energy-portal.org
Hahaha you such an idiot
Try to argue with links, who do you think could believe this gibberish you are simply typing here?132.5km 400kV Lessos – Tororo line (Kenya – Uganda Interconnector)
686km 500kV Eastern Electricity Highway Project (Ethiopia – Kenya Interconnector)
If you have those why did you get excited about a line similar in capacity to those and even the president is going for the launch. I have never seen Uhuru launching such small things.Hahaha we have this rubbish all over the country, note, Tanzania is almost two times bigger than your tinny desert
Hahaha so now you are confessing there's a possibility for the linkage between Tanzania and Kunya? At least you are starting growing sensesActually that is not for us to buy your power, it is to be connected to the kenya ethiopia line so that power from the grand renaissance dam in ethiopia (The largest dam in Africa) can be sold to you and other southern african countries. Again keep your power you will buy from ethiopia through kenya.
I gave you a link (Longest power transmission line in east and central africa) and even cited a source(Ketraco) please refer to the comments above, unless you are incapable of reading or your head is impervious to reason. Getting excited about a 132 Kv line is mediocre and stupidity at best, that is the acme of low expectations.Try to argue with links, who do you think could believe this gibberish you are simply typing here?
Read the link from construction review, i objected that we need your power. We do not need your power, in fact we are doing you a favor so that you can get access to power from ethiopia.Hahaha so now you are confessing there's a possibility for the linkage between Tanzania and Kunya? At least you are starting growing senses
Our 400KV is two times bigger than yours and cutting across many regions than yours, thus further down the powering distribution list from South, West, North, EastIf you have those why did you get excited about a line similar in capacity to those and even the president is going for the launch. I have never seen Uhuru launching such small things.
A non existent thing.Our 400KV is two times bigger than yours and cutting across many regions than yours, thus further down the powering distribution list from South, West, North, East
You can't reach here easily
Lol 😂😂😂😂 2200 megawatts are on their way, two years to come we will be potential exporters of the regionRead the link from construction review, i objected that we need your power. We do not need your power, in fact we are doing you a favor so that you can get access to power from ethiopia.
Hahaha 400km vs 2000km![]()
Construction of longest transmission line in East and Central Africa nears completion
Construction of the longest longest transmission line in East and Central Africa nears completion. The line links Kenya to its northern Ethiopia for regional electricity trade.constructionreviewonline.com