Happening Now: Groundbreaking Dongo Kundu Special Economic Zone.

Happening Now: Groundbreaking Dongo Kundu Special Economic Zone.

Udongo mwekundu ,
kumbe watanzania hakuna Kisw mnajua ...
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc
 
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc

Kiswahili chimbuko lake Pwani ya Kenya, nyie mlidandia tu...soma historia itakuweka huru.
 
EHJjdl6W4AAboX3
EHKpv2MWoAE_Nfq
 
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc
Read up on
a) Lamu-Isiolo-Garissa-Moyale Highway 500 km (U/C)
b) eldoret-lodwar(turkana)-juba highway 900 km (U/C)
 
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc
Kiswahili kilitoka Lamu/Mombasani kaka then Zanzibar ...huko morogoro kimefika juzi
 
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc
We have old and New Swahili; Old Swahili was called Kingozi the native language of the Ngozi(skin wearing) people of Kenya. After the interaction with Arabic between 15th and 19th century, the new Swahili emerged and the Ngozi people ceased to exist so they became the Swahili people.

The old Ngozi language is still spoken as a second language by the Pokomo people of the Coastal Kenya, having in mind they still own the roots of the original culture that bore Swahili spoken today.

That’s the brief history of the language.

Arabic only influenced the vocabularies but Swahili is using 100% Bantu grammar. That said, a language is classified by grammar not vocabularies, so Swahili is distinctly a Bantu language with some 40% Loan words from Arabic, English and Portuguese.
 
Uliitizama hii ya 'Darwins Nightmare', na ulijivunia kwamba iliipa Tz sifa nyingi duniani kama shamba la bibi? Humo ndani utawaona machokoraa wa Mwanza wakivuta hiyo hiyo gundi. Tena mbaya zaidi ni kwamba ili wapate hiyo gundi, wao wanachoma 'carton' ambazo zinatumiwa kusafirisha samaki kwenye ndege kuelekea Europe. Ndege ambazo zinabeba samaki wote na kuwaacha wananchi wenzako wakigombania mabaki ya samaki walio oza kwenye dampo. Hii filamu ilinitamausha kweli kweli nilipo ona ndege hizo hizo zikirudi na silaha haramu ambazo zinatumiwa hadi sasa hivi kuendelea kuua maelfu ya watu DRC. Ila kuona marubani wa ndege hizo za kirussia wakiwadunga visu na kuwaua dada zenu, bila ya hatua yeyote kuchukuliwa dhidi yao, ndio ilinitia hasira hadi leo hii.

Hahaha unaleta fake news za miaka 20 iliyopita dhidi ya live situation ya zombies iliopo Nairobi saa hii?
 
a) Busi-siaya-kisumu-Homa bay-Migori dual carriage highway (450 km)
b) Nairobi-Nakuru expressway(175 km)
c) eldoret southern and northern bypass (60 km)
d) Isiolo-Moyale highway (500 km)
e) Kisumu special economic zone
f) Naivasha special economic zone
g) Lamu port and Lamu industrial city
h) Kisumu-Kakamega-Webuye highway (67km)
i) Universal electricity access (75% world bank report as of may)............................................................................................................................................................................................................

The list is long, it is not just Nairobi. Not forgetting the numerous county government projects which are too many to be listed here.
Hahaha really? Juzi JPM kazindua kilometres 700+ in only 2 regions na ni kama haja fanya kitu, kazindua national grid line 150 kv kwenye mikoa miwili zaidi ya kilometres 400+ na ni kama hajafanya kitu, coming days atazindua regional grid inatoka Zambia 400kv with 1700 kilometres hapo ndio angalau tutaongea

Note, miradi yote hiyo haihusu Dar wala major cities kama ninyi kila kitu ni Nairobi, Mombasa
 
Kiswahili kilitoka Lamu/Mombasani kaka then Zanzibar ...huko morogoro kimefika juzi
Swahili ni bantu language, 80% of it's vocabularies are from bantu languages, how many of those tribes are in Lamu?
 
Hahaha unaleta fake news za miaka 20 iliyopita dhidi ya live situation ya zombies iliopo Nairobi saa hii?
Eti fake news? 😀 Documentary ya 1hr 46mins, tena video? Umewaona ndugu zako wakigombania mabaki ya samaki walio oza kwenye dumpsite? Chokoraa wa Mwanza nao umewaona wakichoma takataka za mzungu, kutoka kwa kampuni ya mhindi, ili wapate gundi ya kuvuta? Dada zenu ambao wanajiuza kwa marubani kutoka Russia umewaona wakidungwa visu na kuuawa kama mende, baada ya kutumiwa? Jombaa, silaha za mabwana zenu ambazo mlikuwa mnabadilishana na samaki fresh si bado zinatumiwa hadi sasa hivi kuwaua raia wasiokuwa na hatia kule DRC? Nchi ya asali na maziwa my foot. Hii documentary ya 'Darwin's Nightmare' iliwaumbua kweli kweli. Mkiitwa shamba la bibi na 'mega shithole' msinune tafadhali.
 
Eti fake news? 😀 Documentary ya 1hr 46mins, tena video? Umewaona ndugu zako wakigombania mabaki ya samaki walio oza kwenye dumpsite? Chokoraa wa Mwanza nao umewaona wakichoma takataka za mzungu, kutoka kwa kampuni ya mhindi, ili wapate gundi ya kuvuta? Dada zenu ambao wanajiuza kwa marubani kutoka Russia umewaona wakidungwa visu na kuuawa kama mende? Jombaa, silaha za mabwana zenu ambazo mlikuwa mnabadilishana na samaki fresh si bado zinatumiwa hadi sasa hivi kuwaua raia wasiokuwa na hatia DRC? Nchi ya asali na maziwa my foot. Hii documentary ya 'Darwin's Nightmare' iliwaumbua kweli kweli, kama mega shithole.
Hahaha hiyo ilikua ni drama kama hujui tu, sababu iliundwa mpaka legislative committee kuchunguza hiyo scandal, 10s of years ago na kukuta it's a staged documentary, haikuwa na uhalisia, eti watu wa Mwanza wale mapank, utakua hujui maisha ya Mwanza wewe

Tanzania hakuna chokoraa, FYI Tanzania has the lowest number of street children in the world
 
wacha maneno yako wewe....

Kiswahili nyumbani pake ni TZ, hiyo udongo mwekundu kwa dongo kundu hakuna asiyejua. Ila mostly Kundu hutumika kama tusi kwetu

All in all hongereni kwa kutaka kuifanya Mombasa inoge.
Ila msisahau kuna Mandera, Turkana, Northern Kenyan etc
Project Name/ActivityRegion/ CountyLength (Lane KM)Base (31st June 2018) KMFY 2018/2019
Achievement (lane km)
Acc. Lane KmPhysical Progress
Q1Q2Q3Q4
1Loruk – Barpelo (B17)Baringo/Elgeyo Marakwet13282000 8291.0%
2Nuno-Modogashe (A13)Garissa270602637.630 153.677.5%
3Eldoret BypassUasin Gishu640000.3 0.37.1%
4Construction of Kibwezi - Mutomo - KituiMakueni/ Kitui38438.840.45522.06 156.2651.5%
5Mombasa – Mariakani Contract 1: Mombasa – Kwa Jomvu Rd (A109)Mombasa80005.4915.51 2150.0%
6MPARD Package 2: Mwache - MtezaMombasa35.840000 00%*
7MPARD Package 3: Mteza – KibundaniMombasa/Kwale27.440000 00%*
8Construction of Western bypassNairobi/Kiambu70.80000 00.0%
9Upgrading of Kalobeiyei River - NadapalTurkana1760011.46.76 18.1613.1%
10Upgrading of Lokitaung Junction - Kalobeiyei RiverTurkana1600010.410.56 20.9612.9%
11Upgrading of Lodwar - Lokitaung JunctionTurkana1600022.29.66 31.8633.3%
12Upgrading of Loichangamatak - LodwarTurkana1000010.24.6 14.818.7%
13Kisii – Ahero –Isebania (A1) Lot 1: Isebania - KisiiKisii/Migori36801216.418.18 46.5820.0%
14Kisii – Ahero –Isebania (A1) Lot 2: Kisii - AheroKisii/Kisumu38405.43853.14 96.5428.8%
15Kitale – Endebes - SuamBusia/Bungoma900000 013.5%
16Chiakariga – Meru (C92)Meru110773.8211.8 94.674.0%
17OljoOrok - Dundori (B20)Nyandarua7018 1898.0%
18Garsen – Lamu – WituLamu270046.9217 27.9230.0%
19Uplands - GithunguriKiambu940002 218.0%
20Nyaru - ItenElgeyo Marakwet640003 335.0%
21Ugunja-Nyadorera-RuambwaSiaya26.700010 1069.3%
22Mau Narok-Kisiriri (B18)Narok340000 026.6%
23Busia - MalabaBusia2804283 3553.7%
24Posta (Naibor) - Kisima - MaralalLaikipia/Samburu650000 032.0%
25Narok - SekenaniKajiado1641419727 6765.5%
26James Gichuru- RironiNairobi/kiambu1565.82.62.418.5 29.318.0%
27Kisumu - KakamegaKisumu/Kakamega152126370.3 136.399.0%
28Kakamega - Kaburengu (Webuye) NewKakamega8028.33510.658.45 52.4384.0%
29Kisumu Boys - MamboleoKisumu18.411.195.496.450 23.1386.0%
30Magogo - Kwa JomvMombasa160000 00%*
31Access Link Road to New Lamu PortLamu130000 00%*
32Dualling of Athi River - Machakos TurnoffMachakos4017.26.813.47.4 44.860.0%
33Construction of Interchange at Kericho Jn (B1/C23)KerichoN/A19%16%51%63% 63.30%63.3%
34Construction of Interchange at Ahero Jn (A1/B1)KisumuN/A15%12%50%72% 72.00%72.0%
35Wei Wei BridgeBaringoN/A0%4.00%5.00%8% 8.00%8.0%
36Marigat BridgeBaringoN/A0%8.00%10.00%16% 16.00%16.0%
37Endau BridgeBaringoN/A0%1.00%3.00%6% 6.00%6.0%
38Garden City/School of Monetary StudiesNairobiN/A2%9.00%15.00%20% 20.16%20.2%
39Witeithie/Mang'u Foot BridgeKiambuN/A10%14.00%21.00%31% 30.70%30.7%
40Lomut BridgeBaringoN/A0%2.00%6.00%8% 8.00%8.0%
 
PROJECT NAMEDISTANCE (Km)CONTRACTORSTATUS COUNTYCOST KSH
Construction of Upper Hill – Mbagathi Link Road11Interways Construction Co.47.0%Nairobi& 1,249,921,540.63
Rehabilitation & Upgrading of Old Nairobi road and Bishop Muge8.5Dittman Construction Company95%Uasin-Gishu684,976,833.20
Rehabilitation & Upgrading of Eastlands Roads Phase II10Wak Construction Limited40%Nairobi1,111,111,222.32
Rehabilitation & Upgrading of Eastleigh Estate Access roads3Baraki International Limited73%Nairobi552,976,811,10
Rehabilitation of Mathare Roads8Tinfra Engineering Ltd98%Nairobi95,688,170,90
Rehabilitation and Upgrading of UpperHill Roads, Phase I5Mattan Construction98.3%
Substantially Complete (under defects liability period)
Nairobi2,002,892,599.00
Construction of Nairobi Eastern Missing Link Roads and Non-Motorised Transport (NMT) Facilities In Nairobi17.2Reynolds Construction Company71%Nairobi4,578,162,618.04
Nairobi Outering Road Improvement Project13Sinohydro Construction Company94.0%Nairobi7,395,183,298.13
Construction to Bitumen Standards of Meru Bypass Roads23H-Young (EA)Limited73%Meru2,391,755,277.10
Construction to Bitumen Standard of Ngong Road – Kibera – Kungu Karumba – Langata Road (Missing Link No. 12)4.2H. Young (EA )Ltd60%Nairobi2,097,520,695.00
Construction to Bitumen Standard of Waiyaki Way – Redhill Link Road5China Wu Yi Ltd90%Nairobi3,012,205,102.71
Upgrading to Bitumen Standards of Githurai –Kimbo Road (Phase II)2 Dickways Construction Ltd 98%Kiambu423,184,731.00
Upgrading to Bitumen Standards of Eastlands Roads Phase I5.2 Tosha Holdings 97%Nairobi347,142,134.06
Rehabilitation and Upgrading of Eastleigh Roads Phase II3 H-Young Limited 94.3%Nairobi677,078,139.00
Construction of Annex Loop Roads and Upper Elgon View Loop Roads in Eldoret Town10 Dittman Construction Company 97%Uasin-Gishu
Upgrading to Bitumen Standards of Kinunga – Kamuyu Road Phase II3.8Territorial Works Ltd 95%Nyeri237,785,753.75
Rehabilitation and Upgrading of Upper Hill Roads Phase II6.5 Tosha holdings60%Nairobi 2,258,531,258.11
Upgrading to Bitumen standards of Syokimau – Katani Road Phase II3.5 Sivad Construction Co Ltd95.5%Machakos 425,053,087.00
Construction of a Flyover Bridge Across the Northern Bypass and Approaches at Kahawa West2 Frontier Engineering Limited 93%Nairobi 403,440,924.00
Construction of Lenana – Muchugia road7Jomwak Enterprises95%Nairobi 513,177,612.75
Upgrading of Industrial Area Roads Phase I4.2El Adi Construction Co. Ltd95%Nairobi 153,053,258.82
Construction of Access Road to Ruai Police Station1Wak Construction Ltd96%Nairobi 132,888,629.37
Upgrading to Bitumen Standards of Mlolongo – Kware – Katani Link Road (Phase I)6 Ogle Construction Co.65%Nairobi 1,629,487,068.99
Dualling of Ngong Road (Dagoretti Corner-Karen Roundabout Section)9.8China Qingjian Int. Group Ltd 38%Nairobi 1,987,981,992.5
Construction of Kisii Bypass (Phase I)5.2Signon Corp. Ltd35%Kisii448,808,373.60
Construction of Nyahururu Bypass8Hanamal Construction Limited26%Laikipia562,127,004.00
Construction of Kericho Bypass (Phase I)5Terrad Construction Ltd33%Kericho445,786,294.80
Construction of Kenyatta University Footbridge over Railway LineN/AChina Wu Yi Ltd94.7%Kiambu281162084.7
Construction of Access to Embakasi (Infinity) Industrial Park (Phase II)2El Adi Co. Ltd45%Nairobi142,992,028.1
Dualling of Ngong Road Phase II (Prestige-Dagoretti Corner)3.4World Kaihatsu Kogyo Co. Ltd.27%Nairobi2,400,000,000
Construction of Kangundo Road – Greater Eastern Bypass Link Road10China Aerospace Construction Group (Kenya) Corporation Ltd.26%Nairobi1,160,691,029.4
Construction of Kahawa Sukari Estate Access Roads6.1Interways Construction Co.32%Kiambu3,598,902.90
Construction of Thika Bypass10Tosha Holdings7%Kiambu1,867,953,057.60
There are so many ongoing road projects in kenya as we speak
 
Hahaha really? Juzi JPM kazindua kilometres 700+ in only 2 regions na ni kama haja fanya kitu, kazindua national grid line 150 kv kwenye mikoa miwili zaidi ya kilometres 400+ na ni kama hajafanya kitu, coming days atazindua regional grid inatoka Zambia 400kv with 1700 kilometres hapo ndio angalau tutaongea

Note, miradi yote hiyo haihusu Dar wala major cities kama ninyi kila kitu ni Nairobi, Mombasa
Fanya reaserch yako vizuri
 
Fanya reaserch yako vizuri
PROJECT NAMEDISTANCE (Km)CONTRACTORSTATUSCOUNTYCOST KSH
Construction of Upper Hill – Mbagathi Link Road11Interways Construction Co.47.0%Nairobi& 1,249,921,540.63
Rehabilitation & Upgrading of Old Nairobi road and Bishop Muge8.5Dittman Construction Company95%Uasin-Gishu684,976,833.20
Rehabilitation & Upgrading of Eastlands Roads Phase II10Wak Construction Limited40%Nairobi1,111,111,222.32
Rehabilitation & Upgrading of Eastleigh Estate Access roads3Baraki International Limited73%Nairobi552,976,811,10
Rehabilitation of Mathare Roads8Tinfra Engineering Ltd98%Nairobi95,688,170,90
Rehabilitation and Upgrading of UpperHill Roads, Phase I5Mattan Construction98.3%
Substantially Complete (under defects liability period)
Nairobi2,002,892,599.00
Construction of Nairobi Eastern Missing Link Roads and Non-Motorised Transport (NMT) Facilities In Nairobi17.2Reynolds Construction Company71%Nairobi4,578,162,618.04
Nairobi Outering Road Improvement Project13Sinohydro Construction Company94.0%Nairobi7,395,183,298.13
Construction to Bitumen Standards of Meru Bypass Roads23H-Young (EA)Limited73%Meru2,391,755,277.10
Construction to Bitumen Standard of Ngong Road – Kibera – Kungu Karumba – Langata Road (Missing Link No. 12)4.2H. Young (EA )Ltd60%Nairobi2,097,520,695.00
Construction to Bitumen Standard of Waiyaki Way – Redhill Link Road5China Wu Yi Ltd90%Nairobi3,012,205,102.71
Upgrading to Bitumen Standards of Githurai –Kimbo Road (Phase II)2Dickways Construction Ltd98%Kiambu423,184,731.00
Upgrading to Bitumen Standards of Eastlands Roads Phase I5.2Tosha Holdings97%Nairobi347,142,134.06
Rehabilitation and Upgrading of Eastleigh Roads Phase II3H-Young Limited94.3%Nairobi677,078,139.00
Construction of Annex Loop Roads and Upper Elgon View Loop Roads in Eldoret Town10Dittman Construction Company97%Uasin-Gishu
Upgrading to Bitumen Standards of Kinunga – Kamuyu Road Phase II3.8Territorial Works Ltd95%Nyeri237,785,753.75
Rehabilitation and Upgrading of Upper Hill Roads Phase II6.5Tosha holdings60%Nairobi 2,258,531,258.11
Upgrading to Bitumen standards of Syokimau – Katani Road Phase II3.5Sivad Construction Co Ltd95.5%Machakos 425,053,087.00
Construction of a Flyover Bridge Across the Northern Bypass and Approaches at Kahawa West2Frontier Engineering Limited93%Nairobi 403,440,924.00
Construction of Lenana – Muchugia road7Jomwak Enterprises95%Nairobi 513,177,612.75
Upgrading of Industrial Area Roads Phase I4.2El Adi Construction Co. Ltd95%Nairobi 153,053,258.82
Construction of Access Road to Ruai Police Station1Wak Construction Ltd96%Nairobi 132,888,629.37
Upgrading to Bitumen Standards of Mlolongo – Kware – Katani Link Road (Phase I)6Ogle Construction Co.65%Nairobi 1,629,487,068.99
Dualling of Ngong Road (Dagoretti Corner-Karen Roundabout Section)9.8China Qingjian Int. Group Ltd38%Nairobi 1,987,981,992.5
Construction of Kisii Bypass (Phase I)5.2Signon Corp. Ltd35%Kisii448,808,373.60
Construction of Nyahururu Bypass8Hanamal Construction Limited26%Laikipia562,127,004.00
Construction of Kericho Bypass (Phase I)5Terrad Construction Ltd33%Kericho445,786,294.80
Construction of Kenyatta University Footbridge over Railway LineN/AChina Wu Yi Ltd94.7%Kiambu281162084.7
Construction of Access to Embakasi (Infinity) Industrial Park (Phase II)2El Adi Co. Ltd45%Nairobi142,992,028.1
Dualling of Ngong Road Phase II (Prestige-Dagoretti Corner)3.4World Kaihatsu Kogyo Co. Ltd.27%Nairobi2,400,000,000
Construction of Kangundo Road – Greater Eastern Bypass Link Road10China Aerospace Construction Group (Kenya) Corporation Ltd.26%Nairobi1,160,691,029.4
Construction of Kahawa Sukari Estate Access Roads6.1Interways Construction Co.32%Kiambu3,598,902.90
Construction of Thika Bypass10Tosha Holdings7%Kiambu1,867,953,057.60
There are so many ongoing road projects in kenya as we speak
And I've started by that chart you've sent 👆👆👆

90% of the projects are located in Nairobi, the remaining balance is in the central Kenya.
 
Fanya reaserch yako vizuri
Leta project kubwa kama hii out of the Kenyan major cities, kama huko turkana

Kigoma ni mkoa uliopo mwishoni kabisa huko lakini ni mkoa ambao kwa sasa una projects nyingi kubwa kuanzia water projects, ports, umeme, hospitals etc

Kwenye barabara tu kuna projects za zaidi ya 500 kilometres, constructors wapo site saivi 👇👇👇👇


Nipe County ya mbali kabisa yenye projects ka hizi za Kigoma...
 
Leta project kubwa kama hii out of the Kenyan major cities, kama huko turkana

Kigoma ni mkoa uliopo mwishoni kabisa huko lakini ni mkoa ambao kwa sasa una projects nyingi kubwa kuanzia water projects, ports, umeme, hospitals etc

Kwenye barabara tu kuna projects za zaidi ya 500 kilometres, constructors wapo site saivi 👇👇👇👇


Nipe County ya mbali kabisa yenye projects ka hizi za Kigoma...

Nenda kwa website ya KURA ama KENHA utapata list ya projects zote under National government na ukumbuke hizo si za county government.
 