Maendeleo ya Sayansi na Teknolojia: China wajenga jengo la ghorofa tisa (10 storey building) ndani ya saa 28 na dakika 45

Maendeleo ya Sayansi na Teknolojia: China wajenga jengo la ghorofa tisa (10 storey building) ndani ya saa 28 na dakika 45

View attachment 2493113



Chinese company Broad Group has erected a modular 10-storey apartment block, named the Living Building, in just over a day in Changsha, China.


A timelapse released by Broad Group shows the 10-storey building being erected in China by a large team of workers and three cranes in 28 hours and 45 minutes.

According to the company, this is the "world's shortest construction period" for a building of this scale.

Tower built from stainless steel modules

The apartment block was assembled from standard container-sized modular units that were made in a factory by Broad Group and have a stainless steel structure.


Each module is 12.19 metres (40 feet) long, 2.44 metres (eight feet) wide and three metres (10 feet) high.

The container shaped modules stacked with one wall of each unit folding down to become a floor plate and create a column-free space that is 12 metres by 4.8-metres. Windows and balconies fold out from the unit to enclose the spaces.

"10 storeys can be erected in one day"

The modules are transported to the site with all the electric and internal finishes complete meaning that installation can happen rapidly.

"Extremely simple onsite installation: Just tighten bolts and connect [the] water and electricity, as fast as 10 storeys can be erected in one day," said the company.

iyo technology isije ikafika huku ibaki uko uko tutakufa njaa mjini.
 
Dahh Engineer wetu wanasoma tu minotsi mingii solving za kutosha. Hawawez hata kutengeneza nguzo za Concrete had walete mchina.

China moja kat ya kipimo Cha ukichaa ni kutukujua hata ujenzi wa Daraja.
Wachina wote ni engineers.
China mjini, au vijijini ndani ndani huko?
 
Jidu La Mabambasi karibu kaka uchangie mawazo
Mkuu hiyo ni teknolojia ya ujenzi iitwayo prefabricated concrete au hata steel elements.
Tatizo watanzania wengi hawaifahamu.
Unajenga nyumba ikiwa chini na kuiunganisha kwa crane na ujenzi ni wa haraka sana.

Mimi nimejenga godown lenye ukubwa wa kutosha kwa steel structure elements na vile vile nyumba ya ghorofa yenye prefabricated floors.

Na bado ninalo hall liko store, liko kamili, natafuta kiwanja!
 
Mkuu hiyo ni trknolojia ya ujenzi iiywayo prefabricated concrete au hata steel elements.
Tatizo watanzania wengi hawaifahamu.
Unajenga nyumba ikiwa chini na kuiunganisha kwa crane na ujenzi ni wa haraka sana.

Mimi nimejenga gidown lenye ukubwa wa kutosha kwa steel structure elements na vile vile nyumba ya ghorofa yenye prefabricated floors.

Na bado ninalo hall liko store, liko kamili, natafuta kiwanja!
Share picha tuongeze upeo ndugu.

Pia kuagiza china n bei gan room 4 zakulala self, dinning & sitting room, jiko, stoo na public toilet
 
View attachment 2493113



Chinese company Broad Group has erected a modular 10-storey apartment block, named the Living Building, in just over a day in Changsha, China.


A timelapse released by Broad Group shows the 10-storey building being erected in China by a large team of workers and three cranes in 28 hours and 45 minutes.

According to the company, this is the "world's shortest construction period" for a building of this scale.

Tower built from stainless steel modules

The apartment block was assembled from standard container-sized modular units that were made in a factory by Broad Group and have a stainless steel structure.


Each module is 12.19 metres (40 feet) long, 2.44 metres (eight feet) wide and three metres (10 feet) high.

The container shaped modules stacked with one wall of each unit folding down to become a floor plate and create a column-free space that is 12 metres by 4.8-metres. Windows and balconies fold out from the unit to enclose the spaces.

"10 storeys can be erected in one day"

The modules are transported to the site with all the electric and internal finishes complete meaning that installation can happen rapidly.

"Extremely simple onsite installation: Just tighten bolts and connect [the] water and electricity, as fast as 10 storeys can be erected in one day," said the company.

Mimi hapa geto nilipoamia siku ya tatu leo fundi hajamaliza kupaka rangi tu
 
Kwa hii teknolojia, nyumba za kaya zote kwenye kijiji chenye kaya 400 zinaweza kujengwa ndani ya siku tano......wataalamu wetu wakajifunze ili kuondoa makazi duni vijijini na maeneo ya mijini.
 
Nimewahi ona Netherlands wanajenga underpass kwa masaa 8

India nao underpass ndani ya masaa 6

Maandalizi yote yalikuwa yamefanyika tayari hivyo ni kuchomeka kitu juu ya kitu
Ooh!...
 