SGR Nairobi-Naivasha 70% mbele kwa mbele

SGR Nairobi-Naivasha 70% mbele kwa mbele

MK254

JF-Expert Member
Joined
May 11, 2013
Posts
32,408
Reaction score
50,809
Hiki kitu lazima kifike kwa Museveni, garagaraza hata kwa ngumi, halafu baada ya hapo tumshushie Kagame na pia safu ya kumtia DRC kapuni, pia ikumbukwe Msudan hatoki...tunaye pia...ukanda wote huu lazima uwe shamba letu.

Changamoto za mambo ya ubaguzi ambayo Watanzania wanakeshea kwa unafiki wakijifanya kujali sana yatafanyiwa kazi, lakini mwendo ni ule ule SGR lazima itawapa tabu
----------------------------------------------------------------

sgr.jpg


Construction of the 120-kilometre Nairobi-Naivasha standard gauge railway (SGR) is almost complete with engineers having certified 50 per cent of the infrastructure, the government says.

Transport Principal Secretary Paul Maringa expressed optimism that the rail will be done in time ahead of the June 2019 deadline.

“Seventy per cent of the work is done...The engineers assessment certified 50 per cent,” Mr Maringa said in an interview today.

The PS said his ministry was looking into payment claims from landowners affected by the rail.

“We have the money for the compensation,” he added.

The Nairobi-Naivasha line is funded by Exim-Bank of China at a cost Sh150 billion.

Phase 2B of the project from Naivasha to Kisumu will cost Sh350 billion, the bulk of which is expected to be financed through loans from the same lender.

On June 23, President Uhuru Kenyatta inspected the SGR Phase 2A construction and pinpointed key areas for improvement.

He also directed that land acquisition be fast-tracked and those affected compensated within a month to so that the contractor, China Road and Bridge Corporation (CRBC), is not hindered by unavailability of land.

uhuru.jpg


President Uhuru Kenyatta, Transport and Infrastructure Cabinet Secretary James Macharia (second right) and Kajiado Governor Joseph Ole Lenku during a routine inspection of the SGR Phase 2A Project at DK2 Project Site on June 23, 2018. File Photo | NMG




The Ministry of Lands, the National Lands Commission (NLC) and Kenya Railways (KR) have deployed surveyors and valuers to various sites along Phase 2A to fast-track the land acquisition and compensation process.

A statement from KR last week said the professionals will be on the ground over the next two weeks to aid awards and final payments to landowners with proper documentation.

Hitches

CRBC moved to the site last October and has since been working despite numerous challenges.

Construction works were hit by bad blood between the local Maasai community and the Chinese firm after the contractor came to the site before land compensation was done.

Building of the railway line also stalled soon after following a pay dispute with local workers.

The new line will link the planned Naivasha export processing zone and Ol Karia geothermal fields to the Sh327 billion Nairobi-Mombasa railway.

The fast passenger rail service will see Kitengela, Ngong, Ongata Rongai in Kajiado County, Kamangu in Kiambu, Suswa in Narok and Mai Mahiu get sub-stations for passenger rail services.
Nairobi-Naivasha standard gauge rail 70pc done: Govt
 
this SGR is also electrified and modern k ke that of the United republic of Tanzania
 
Hiki kitu lazima kifike kwa Museveni, garagaraza hata kwa ngumi, halafu baada ya hapo tumshushie Kagame na pia safu ya kumtia DRC kapuni, pia ikumbukwe Msudan hatoki...tunaye pia...ukanda wote huu lazima uwe shamba letu.

Changamoto za mambo ya ubaguzi ambayo Watanzania wanakeshea kwa unafiki wakijifanya kujali sana yatafanyiwa kazi, lakini mwendo ni ule ule SGR lazima itawapa tabu
----------------------------------------------------------------

sgr.jpg


Construction of the 120-kilometre Nairobi-Naivasha standard gauge railway (SGR) is almost complete with engineers having certified 50 per cent of the infrastructure, the government says.

Transport Principal Secretary Paul Maringa expressed optimism that the rail will be done in time ahead of the June 2019 deadline.

“Seventy per cent of the work is done...The engineers assessment certified 50 per cent,” Mr Maringa said in an interview today.

The PS said his ministry was looking into payment claims from landowners affected by the rail.

“We have the money for the compensation,” he added.

The Nairobi-Naivasha line is funded by Exim-Bank of China at a cost Sh150 billion.

Phase 2B of the project from Naivasha to Kisumu will cost Sh350 billion, the bulk of which is expected to be financed through loans from the same lender.

On June 23, President Uhuru Kenyatta inspected the SGR Phase 2A construction and pinpointed key areas for improvement.

He also directed that land acquisition be fast-tracked and those affected compensated within a month to so that the contractor, China Road and Bridge Corporation (CRBC), is not hindered by unavailability of land.

uhuru.jpg


President Uhuru Kenyatta, Transport and Infrastructure Cabinet Secretary James Macharia (second right) and Kajiado Governor Joseph Ole Lenku during a routine inspection of the SGR Phase 2A Project at DK2 Project Site on June 23, 2018. File Photo | NMG




The Ministry of Lands, the National Lands Commission (NLC) and Kenya Railways (KR) have deployed surveyors and valuers to various sites along Phase 2A to fast-track the land acquisition and compensation process.

A statement from KR last week said the professionals will be on the ground over the next two weeks to aid awards and final payments to landowners with proper documentation.

Hitches

CRBC moved to the site last October and has since been working despite numerous challenges.

Construction works were hit by bad blood between the local Maasai community and the Chinese firm after the contractor came to the site before land compensation was done.

Building of the railway line also stalled soon after following a pay dispute with local workers.

The new line will link the planned Naivasha export processing zone and Ol Karia geothermal fields to the Sh327 billion Nairobi-Mombasa railway.

The fast passenger rail service will see Kitengela, Ngong, Ongata Rongai in Kajiado County, Kamangu in Kiambu, Suswa in Narok and Mai Mahiu get sub-stations for passenger rail services.
Nairobi-Naivasha standard gauge rail 70pc done: Govt

That a SGR belongs to Chinese, xo u nid to wait for a number of years for it to be yours... By ze way you are happy for SGR to be there no matter of its quality or model in which your politicians have played you...I assure you that when yapi merkez finishes Sgr Tanzania which will be far better than urs, you will realize the embezzlement that had taken place in your SGR and the rest of African countries will put in bad refference of poor and failure of ur contracts as well as the quality of ur SGR interms of value for money...Your blinded by "No exposure"...u think u have the best but you have the worst..That SGR of urs will be recorded in histories of poor SGR made in 21 century and stupid decisions made by your leaders over a contract for their self interest
 
That a SGR belongs to Chinese, xo u nid to wait for a number of years for it to be yours... By ze way you are happy for SGR to be there no matter of its quality or model in which your politicians have played you...I assure you that when yapi merkez finishes Sgr Tanzania which will be far better than urs, you will realize the embezzlement that had taken place in your SGR and the rest of African countries will put in bad refference of poor and failure of ur contracts as well as the quality of ur SGR interms of value for money...Your blinded by "No exposure"...u think u have the best but you have the worst..That SGR of urs will be recorded in histories of poor SGR made in 21 century and stupid decisions made by your leaders over a contract for their self interest
Yeah Yeah Yeah.. Bla Blah Blaaah

It's ours. Not yours. Build yours first before giving us tips and lessons.
 
Hiki kitu lazima kifike kwa Museveni, garagaraza hata kwa ngumi, halafu baada ya hapo tumshushie Kagame na pia safu ya kumtia DRC kapuni, pia ikumbukwe Msudan hatoki...tunaye pia...ukanda wote huu lazima uwe shamba letu.

Changamoto za mambo ya ubaguzi ambayo Watanzania wanakeshea kwa unafiki wakijifanya kujali sana yatafanyiwa kazi, lakini mwendo ni ule ule SGR lazima itawapa tabu
----------------------------------------------------------------

sgr.jpg


Construction of the 120-kilometre Nairobi-Naivasha standard gauge railway (SGR) is almost complete with engineers having certified 50 per cent of the infrastructure, the government says.

Transport Principal Secretary Paul Maringa expressed optimism that the rail will be done in time ahead of the June 2019 deadline.

“Seventy per cent of the work is done...The engineers assessment certified 50 per cent,” Mr Maringa said in an interview today.

The PS said his ministry was looking into payment claims from landowners affected by the rail.

“We have the money for the compensation,” he added.

The Nairobi-Naivasha line is funded by Exim-Bank of China at a cost Sh150 billion.

Phase 2B of the project from Naivasha to Kisumu will cost Sh350 billion, the bulk of which is expected to be financed through loans from the same lender.

On June 23, President Uhuru Kenyatta inspected the SGR Phase 2A construction and pinpointed key areas for improvement.

He also directed that land acquisition be fast-tracked and those affected compensated within a month to so that the contractor, China Road and Bridge Corporation (CRBC), is not hindered by unavailability of land.

uhuru.jpg


President Uhuru Kenyatta, Transport and Infrastructure Cabinet Secretary James Macharia (second right) and Kajiado Governor Joseph Ole Lenku during a routine inspection of the SGR Phase 2A Project at DK2 Project Site on June 23, 2018. File Photo | NMG




The Ministry of Lands, the National Lands Commission (NLC) and Kenya Railways (KR) have deployed surveyors and valuers to various sites along Phase 2A to fast-track the land acquisition and compensation process.

A statement from KR last week said the professionals will be on the ground over the next two weeks to aid awards and final payments to landowners with proper documentation.

Hitches

CRBC moved to the site last October and has since been working despite numerous challenges.

Construction works were hit by bad blood between the local Maasai community and the Chinese firm after the contractor came to the site before land compensation was done.

Building of the railway line also stalled soon after following a pay dispute with local workers.

The new line will link the planned Naivasha export processing zone and Ol Karia geothermal fields to the Sh327 billion Nairobi-Mombasa railway.

The fast passenger rail service will see Kitengela, Ngong, Ongata Rongai in Kajiado County, Kamangu in Kiambu, Suswa in Narok and Mai Mahiu get sub-stations for passenger rail services.
Nairobi-Naivasha standard gauge rail 70pc done: Govt


Naivasha ni Kikuyu land pia?
 
That a SGR belongs to Chinese, xo u nid to wait for a number of years for it to be yours... By ze way you are happy for SGR to be there no matter of its quality or model in which your politicians have played you...I assure you that when yapi merkez finishes Sgr Tanzania which will be far better than urs, you will realize the embezzlement that had taken place in your SGR and the rest of African countries will put in bad refference of poor and failure of ur contracts as well as the quality of ur SGR interms of value for money...Your blinded by "No exposure"...u think u have the best but you have the worst..That SGR of urs will be recorded in histories of poor SGR made in 21 century and stupid decisions made by your leaders over a contract for their self interest
Punguza povu, utakufa bure mapema hehe
 
Bla Blah Blaaah, IT'S OUR COUNTRY not yours



If this SGR of yours u call it a vision of 2030..i think u r lost..u r moving backward...one step ahead and two steps back...what a model of SGR u hv with respect to the money u hv invested in...it will take u centuries to be free from that while others will be thinking to deploy bullet trains while u r struggling in paying back ur debt to chinese
 
If this SGR of yours u call it a vision of 2030..i think u r lost..u r moving backward...one step ahead and two steps back...what a model of SGR u hv with respect to the money u hv invested in...it will take u centuries to be free from that while others will be thinking to deploy bullet trains while u r struggling in paying back ur debt to chinese
Keep reading Kenyan media you will learn the truths and you will in turn get to deem your misconceptions to be what they are.. MISCONCEPTIONS

That said, what model of SGR do you think we're getting? It's CLASS A Chinese standards. Better than US standards. What's more, we will electrify this same SGR to electric when the time comes (which is sooner than you think)

Kenya is a country with Vision, Pioneers and Planners, not a random marketplace. I hope you've watched that video. KENYA VISION 2030 is slowly becoming a reality. We're halfway through
 
There's nothing like class 1 chinese 🙂

Chinese design railway infrastructure depending on axle capacity and speeds requested by a client.

For kenya, the Chinese were the contractor, design consultant, supervisor on behalf of client, funder, and now operator.

Kenyans were stupefied when they asked Chinese what standard SGR should be...of which Chinese cheekily answered class 1...best quality ever...the best rail in the universe 🙂

Failed state kabisa
 
There's nothing like class 1 chinese 🙂

Chinese design railway infrastructure depending on axle capacity and speeds requested by a client.

For kenya, the Chinese were the contractor, design consultant, supervisor on behalf of client, funder, and now operator.

Kenyans were stupefied when they asked Chinese what standard SGR should be...of which Chinese cheekily answered class 1...best quality ever...the best rail in the universe 🙂

Failed state kabisa

Naked truth...kenyans wanajitoa ufahamu ila wanalijua hilo
 