Cost comparison SGR Kenya vs SGR Tanzania

Struggling Gorge bado inameza hela za pension ya wazee, has serious environmental impact na haijatoa ata 1w ya umeme.

Egypt’s Sisi directs government to complete construction of Tanzania’s Julius Nyerere Hydropower Plant in higher quality
BY
Egypt Today staff
Fri, 04 Sep 2020 - 03:52 GMT


President Abdel Fattah El-Sisi in a press conference in June 2018- press photo

CAIRO – 4 September 2020: Egypt’s President Abdel Fattah El Sisi directed the government to complete the construction of Tanzania's Rufiji Dam and Julius Nyerere Hydropower Plant, which is being implemented by the Egyptian Arab Contractors in cooperation with Elsewedy Electric, in higher quality, according to a statement issued by the Cabinet on Friday.

The plant aims to produce electrical power with a capacity of 2,115 megawatts and is being implemented at a cost of $2.9 billion. The amount of electricity produced per annum will be 6,307 megawatts/hour. The capacity of the transmission lines connecting the plant to a regular power plant is 400 kilovolts.

Four dams will be constructed in addition to the main dam in order to form the reservoir. Also, 2 temporary dams located in front of and behind the main dam will be in place to redirect Rufiji River while the main dam is being built. There will be two siphons for surplus water. One of them is for emergencies.

The project includes a tunnel extending on 703 meters to redirect the river, and 3 other tunnels transmitting water to the hydropower plant. That's in addition to the introduction of a permanent bridge and two temporary bridges over the river as well as permanent and temporary roads in the area.

The under-construction dam is 1,025 meters in length, and 134 meters in height, with a storage capacity of about 34 billion cubic meters. The project is expected to benefit 17 million Tanzanian families.

Egypt’s Sisi directs government to complete construction of Tanzania’s Julius Nyerere Hydropower Plant in higher quality

A site tour by GoT , GoE, Elsewedy electric n Arab constructors officials.







 
UMaji maji haujawatoka wadanganyika. From corona sasa magaidi.
For real, corona was just "maji". Ndiyo sababu nchi zilizoipa heshima mpaka leo zinahangaika na malock down na sijui kafyu. Sie tulioichukulia kama maji tu tunaendelea kubleiz. Naamini mnafuatilia kampeni na michezo inayoendelea. Nyomi zinazoibuka bila hata kipande cha badakoda (in Magu tone) ni kiashiria tosha kuwa our plan worked.
 
Mnakufa ila hamsemi. Kuminya habari Tanzania mnapenda sana.
Kichwa kubwa lkn akiliyako ipo miguni.....unaelewa hata mana ya pandemic ww...[emoji706][emoji706][emoji57] 0 brain...dead behind the brain
 
[emoji23][emoji23][emoji23][emoji382][emoji382] nyinyi wadanganyika hucomment ujinga pekee tangu forum ianze
Am clearly above comments za emonji, having said that, substantiate ulichosema eti salender bridge ina impact ndogo kwa mtanzania wa kawaida.
 
Struggling George bado inameza hela za wazee bila kua na miundombinu kabambe ya kusambaza umeme. No power to date na sijui inajengwa ya kufanya nini.

Huu ni mradi mwingine hautakua na manufaa kwa mdanganyika wa kawaida.
Utakuwa na manufaa kwa mkenya mana tunategemea kuwauzia umeme ili muondokane na stupid blackouts.
 
Cookies are required to use this site. You must accept them to continue using the site. Learn more…