Evidence?
Show me evidence Kenya SGR is continuously welded!Read UG Ministerial statement.
https://www.sgr.go.ug/sites/default...sterial_Statement_on_Parliamentary_Report.pdf
Your railways is equivalent to China class B. To quote " Class 2 will reduce investment cost but significantly increase operation & maintenance cost. This will lead to reduce traffic and hence longer repayment period".
You can see from pictures - that Kenya railways is of better standard than TZ. They say cheap is expensive in the long run...so as you deriding Kenya for making smart decision 1) going for Class A and 2) Diesel - you've chosen Ethiopia option and you'lll do maybe 10 times worse than Ethiopia...coz at least all the Djibouti cargo is Ethiopia bound.
And TZ rail is not continuously welded like Kenya - it it continuously welded for I think every 160-300ms.
The problem with most of Africa countries is either lack of capacity or respect for professionals. Kenya professionals - economist, engineers and architect - are very good - and people generally don't interfere with their work - they come at tail end - financial negotiations - to inject their 10% mark up.
But here is a Magufuli a chemistry teacher who thinks he knows everything. So like a little toddler - he'll be given option btw diesel & electric - he will pick electric - and then kaboom - you get class B way cheaper - and you can claim brownies points. These are technical areas best left to professionals.
Show me evidence Kenya SGR is continuously welded!
Show me continuous welded SGR on Kenyan project!You really like evidence.
SPECIAL REPORT: What Makes Uganda Standard Gauge Railway Costly?
It Class A. Ethiopia is Class B. That is similar to TZ - AREMA.
Welding for Class A is continuous. Class B is continous for 300 metres then jointed.
Class A generally involved a lot of earthwork because you need to keep the line straight and level --- while Class B - is more or less what you have in TAZARA or the old MGR - you can afford to meander around corners or have a little gradient here and there - hence it cheaper to construct.
Just check the damn pictures..kenya SGR has really high embankment even on flat land - TZ the rail is literally laid on the ground like the existing MGR. In fact because this is not really a greenfield project - you can afford to literally do what US did - just refurbish the existing line and make MGR a standard gauge.
You really like evidence.
SPECIAL REPORT: What Makes Uganda Standard Gauge Railway Costly?
It Class A. Ethiopia is Class B. That is similar to TZ - AREMA.
Welding for Class A is continuous. Class B is continous for 300 metres then jointed.
Class A generally involved a lot of earthwork because you need to keep the line straight and level --- while Class B - is more or less what you have in TAZARA or the old MGR - you can afford to meander around corners or have a little gradient here and there - hence it cheaper to construct.
Just check the damn pictures..kenya SGR has really high embankment even on flat land - TZ the rail is literally laid on the ground like the existing MGR. In fact because this is not really a greenfield project - you can afford to literally do what US did - just refurbish the existing line and make MGR a standard gauge.
Physics imepita kushoto kwa hawa jamaa! Hii ya kwetu ni high speed and low operation cost haina sababu ya kuwa na gradient za ajabu!Hivi nikijaza udongo ku level na niki chimba na kulevel to ground level which is better enough hapo?
Sent using Jamii Forums mobile app
Haha.... LDC biting more than it can chew.Maintenance cos will be high so expect big losses to be incurred once it starts functioning not forgetting that the country is not industrialised.
Haha.... LDC biting more than it can chew.Maintenance cos will be high so expect big losses to be incurred once it starts functioning not forgetting that the country is not industrialised.
You are a dimwit when it come to railways...1) High speed rail is 200-300kms per hr plus. Your SGR at best will ran at 160kms.
2) The massive earthwork you see in Kenya SGR is not a decoration. High speed & heavy traffic on track lead to deformation & degradation of the ballast that leads to loss of track stability and high maintenance cost. Therefore you can avoid heavy investment cost now like Tanzania has done - with minimal earthwork - and pay later - a train running 160km per hour is not a joke.You can bet it will be tearing apart that cheap Turkish contraption. But considering there will be little if any traffic then you're probably fine.You will ran the trains at maybe 20-40kms and still get there.
![]()
3) Kenya SGR at best - esp Nairobi - Mombasa - will be sooon running more than 36 trains per days - 18 trains going either direction every 24hrs. That's a heavy load that degrade the rail pretty soon. Therefore investing in Class A rail with massive earthwork is imperative.
![]()
![]()
![]()
If ur SGR is high quality, How did this happen?1) High speed rail is 200-300kms per hr plus. Your SGR at best will ran at 160kms.
2) The massive earthwork you see in Kenya SGR is not a decoration. High speed & heavy traffic on track lead to deformation & degradation of the ballast that leads to loss of track stability and high maintenance cost. Therefore you can avoid heavy investment cost now like Tanzania has done - with minimal earthwork - and pay later - a train running 160km per hour is not a joke.You can bet it will be tearing apart that cheap Turkish contraption. But considering there will be little if any traffic then you're probably fine.You will ran the trains at maybe 20-40kms and still get there.
![]()
3) Kenya SGR at best - esp Nairobi - Mombasa - will be sooon running more than 36 trains per days - 18 trains going either direction every 24hrs. That's a heavy load that degrade the rail pretty soon. Therefore investing in Class A rail with massive earthwork is imperative.
![]()
![]()
![]()

Watasingizia wamelipuliwa na al shabaab.If ur SGR is high quality, How did this happen?
Even Before Launch, Sections of the SGR are Collapsing Due to The Rains (PHOTO)
By David Koech / Monday, 21 Nov 2016 06:54AM / 0 Comments / Tags: SGR
A section of a Standard Gauge Railway embankment has collapsed after heavy raining.
A picture showing the collapsed wall at an unidentified location has been circulating on social media this past weekend, leaving Kenyans worried about the quality of the work.
![]()
Transport Principal Secretary Irungu Nyakera however came out to assure that there’s nothing to worry about.
“The protection works is currently the main activity going on within SGR Mombasa to Nairobi. The rains came before everything was tied up and hence this is normal in any ongoing construction site,” he said in a statement to the media.
Kenya Railways reiterated the same on their Twitter handle adding that the contractor will ensure that the integrity of the work is beyond question.
The first phase of the multi-billion dollar project is expected to be complete in a few months, with operations commencing in June next year.
Even Before Launch, Sections of the SGR are Collapsing Due to The Rains (PHOTO)
So yenu hamta repair!! Naona unaendela kujibamba[emoji23][emoji23][emoji23][emoji23]bro! Hatujibambi. Actually, SGR ya Kenya inapendeza ndio maana hii ni mara ya pili kuona mtz akidai kwamba ni yao.
So the Turkish firm is building a low quality rail at a low cost.Mta~repair hadi mchoke.
If ur SGR is high quality, How did this happen?
Even Before Launch, Sections of the SGR are Collapsing Due to The Rains (PHOTO)
By David Koech / Monday, 21 Nov 2016 06:54AM / 0 Comments / Tags: SGR
A section of a Standard Gauge Railway embankment has collapsed after heavy raining.
A picture showing the collapsed wall at an unidentified location has been circulating on social media this past weekend, leaving Kenyans worried about the quality of the work.
![]()
Transport Principal Secretary Irungu Nyakera however came out to assure that there’s nothing to worry about.
“The protection works is currently the main activity going on within SGR Mombasa to Nairobi. The rains came before everything was tied up and hence this is normal in any ongoing construction site,” he said in a statement to the media.
Kenya Railways reiterated the same on their Twitter handle adding that the contractor will ensure that the integrity of the work is beyond question.
The first phase of the multi-billion dollar project is expected to be complete in a few months, with operations commencing in June next year.
Even Before Launch, Sections of the SGR are Collapsing Due to The Rains (PHOTO)
I can see they have installed the noise deflectors almost all the way, nice, lazima tulinde mazingiraSGR through Nairobi national parkView attachment 1001998View attachment 1001999
Sent using Jamii Forums mobile app
hio ni treni heavy duty ya mchina wanayotumia kusafirisha kokoto au vifaa vya ujenzi, wakimaliza ujenzi wanarudi nayo.... Ni kama vile tipper au cartapillar ikitumika na Kampuni kujenga barabara...Hongereni sana ila hicho kichwa cha tren ni toleo lenu la sasa au ni ya zamani imenichanganya