Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Kitambo kulikua na hitilafu flani bandari za Mombasa na ICD ya Nairobi kutokana na system inayotumika iliopitwa na wakati , ambapo lori likiwa limeingia bandarini kuleta kontena la export au empty ni lazima litoke hadi nje ndo lirudi tena na risiti mpya ya kuchukua mzigo wa import.
Ili kuboresha uchukuzi, system hio imeondolewa, sasa lori moja linaweza kuleta export hadi bandarini na kushukisha kisha likapakia kontena nyengine ya import bila kulazimika kutoka nje ya bandari ili kupiga foleni tena.

------------------------------------------------------------------------

KPA reports improved truck turn-around time at Nairobi ICD

The authority has re-engineered business processes at the facility.


Kenya Ports Authority has reported improved truck turn-around time at the Inland Container Depot- Nairobi (ICDN), pegged on enhanced efficiency in container handling at the facility.
Weekly operations report for the period March 11-18 shows truck turn-around time for transit imports went down from 13hrs to 5hrs, while truck turn-around for local exports recorded a slight improvement from 1hr 58 minutes, to 1hr 47minutes.

Truck turn- around time is a Key Performance Indicator (KPI) that measures time taken by a truck per single transaction.

According to KPA's head of inland container depots Peter Masinde, the improved perfomance is as a result of the re- engineering of the business process, which has since seen the combination of two independent truck transactions (dropping export and picking import), with a new target of four hours.
Previously, a laden truck would be allowed entry into the depot to drop an empty or full export or an empty truck picking a full import container alone, and gate drive out.
These amounted to two transactions of two hours each, eliciting complaints from clients owing to long queuing of trucks.
The business process was such that when a truck brought in an empty or full container and the same was due to pick a full import container in return , it was required to exit the depot to complete the first transaction first and start a fresh queue to re-enter the depot to pick a full import” Masinde explains.

He noted that truck turnaround operations is twofold; rail and yard operations which is fully under KPA while gate operations is a shared responsibility between the authority and the Kenya Revenue Authority.
There has been continuous inter-agency engagements to enhance efficiency in addition to discouraging truck drivers from leaving their trucks unattended to, especially at night and during the weekends.
In a statement on Tuesday evening, Masinde also attributed the low container dwell-time to a revitalized customer service desk and marketing section which have intensified regular contacts with clients, whose containers have not been cleared within the five days free period (for local).


During the week under review, total imports received at the ICDN recorded 4,380 TEUs (Twenty Foot Equivalent Units) compared to 4,063 TEUs deliveries.

Exports received registered 291 TEUs while deliveries accounted for 381 TEUs.

The weekly performance showed empties received account for 2,353 TEUs with the deliveries registering 2,794 TEUs.

The depot reported a yard population of 4,820 TEUS with imports accounting for 3,581 which is equivalent to 73.84 percent.

A summary of import age analysis revealed that 2,328 TEUs or 65 per cent were up to five days old at the facility, 687 TEUs or 19 per cent were six-10 days old while 566 TEUS were 11-21 days old.

The improved performance comes amid enhanced cargo handling capacity on the Standard Gauge Railways(SGR) which links the Port of Mombasa to the ICD-N and the Naivasha Inland Container Depot.

Last month, 23,040 TEUs–the approximate unit of measure of a container,were moved by the SGR freight service to both the Nairobi and Naivasha Inland Container Depots.

This is 28.2 per cent more than the 17,974 TEUs moved during the same month last year, a time when Covid-19 had not yet hit economies.

The best monthly performance however remains that of January when freight services hit a new record since operations started in January 2018.
During the month, 241 trains run from Mombasa delivering 24,256 TEUs to Nairobi and Naivasha ICDs.
 
Kama JPM asingeingia madarakani hata hiyo reli yenyewe isingekuwa ya treni za umeme. Tungepata reli na treni za ovyo kama Kenya.

Chini ya JPM tumepata reli yenye specifications za juu kabisa.

Wajinga waliobaki sasa hivi si wa kuwaamini hata kidogo.
Punguzeni ushamba na porojo za kitoto, mnajadili kana kwamba mmezaliwa juzi, Kigezo cha reli kuwa modern si umeme, ni miundombinu ya reli yenyewe! Nikianza kukuuliza maswali muhimu ya hizo specification unazosema ni za juu utakimbia sasa hivi maana hujui lolote zaidi ya reli yenu ni ya umeme...... Ethiopia wanayo reli ya umeme, mbona ukiwauliza wenyewe wanakwambia afadhali wangejenga reli kama ya Kenya!
 
Hawa jamaa watatutia aibu aisee wanaweza kutuletea mitreni ya ajabu kama Kenya daah🤔
Hizi ndo shida za nchi zetu za developing countries, Uzuri au ubaya wa serekali unategemea uzuri au ubaya wa rais wa wakati huo. Baadala ya nchi kutegemea taasisi kuhakikisha uendelezi wa mipango ya serekali, nchi inabaki kutegemea rais wa siku kwa maamuzi yote.

vile inafaa kua ni wataalam wa serekalini walio andikwa kazi permanently ndo wanafaa wawe wahakikisha maendeleo yanaendelea kwa kasi ileile na weledi ule ule hata kama rais wa siku ni nani manake hao ndo ma engineer, ma architect, ma procurement department..etc

Manake marais huja na kuenda, mawaziri huja na kuenda, lakini kuna wale waliopo hapo chini yao ambao hufanya kazi hadi kustaafu wakifika miaka 60, hao ndo wamesomea ma degree na ndo wataalam wa kazi zao, hao ndo watu amabo wanafanya kazi halisi ya serekali..
--------------------------------------------------------
 
Punguzeni ushamba na porojo za kitoto, mnajadili kana kwamba mmezaliwa juzi, Kigezo cha reli kuwa modern si umeme, ni miundombinu ya reli yenyewe! Nikianza kukuuliza maswali muhimu ya hizo specification unazosema ni za juu utakimbia sasa hivi maana hujui lolote zaidi ya reli yenu ni ya umeme...... Ethiopia wanayo reli ya umeme, mbona ukiwauliza wenyewe wanakwambia afadhali wangejenga reli kama ya Kenya!
Nani anajenga diesel na jointed rail nyakati hizi?

Kubali tu kuwa mmeliwa na Mchina.
 
171498545_1413509472332082_565160431325946203_n.jpg





 
Hahaha Tony254 this is the Port they want to compare with Mombasa 😂😂🤣

View attachment 1750131
😂😂😂. Hawa watu huwa wameshindwa na mambo ya port kuanzia zamani.


Huku Kenya tunasonga mbele. Hizi ndizo mashine na vidude vilivyoagizwa na KPA za Lamu port. Kuna mtu huwa anasema kwamba Lamu port haitawahi kukamilika.




According to the authorities, yard and marine services operations equipment for the first berth have been identified, and a contract awarded for the transportation of these equipment.
They include seven terminal tractors, 14 trailers, two Rubber Tyred Gantries (RTG) , four forklifts and two utility vans for yard operations.
Marine services (operations) equipment are two tugboats, one pilot boat, one mooring boat, one fire engine and an ambulance.

 
😂😂😂. Hawa watu huwa wameshindwa na mambo ya port kuanzia zamani.


Huku Kenya tunasonga mbele. Hizi ndizo mashine na vidude vilivyoagizwa na KPA za Lamu port. Kuna mtu huwa anasema kwamba Lamu port haitawahi kukamilika.




According to the authorities, yard and marine services operations equipment for the first berth have been identified, and a contract awarded for the transportation of these equipment.
They include seven terminal tractors, 14 trailers, two Rubber Tyred Gantries (RTG) , four forklifts and two utility vans for yard operations.
Marine services (operations) equipment are two tugboats, one pilot boat, one mooring boat, one fire engine and an ambulance.

Ngoja aje na habari za 2003 to dispute this article 😂😂🤣.
 
Ngoja aje na habari za 2003 to dispute this article 😂😂🤣.
Halafu hio hio article inasema kwamba construction of Lamu port started in 2015. Kuna ng'ombe from TZ sitaki kuitaja jina huwa nasikia ikisema ati construction of Lamu port started in 2012. I think 2015 was site mobilisation then 2016 is when construction started in earnest.




Construction of the first three berths of the planned 32-berth Lamu Port, has been completed at a cost of about Sh40 billion, having been developed by China Communication Construction Company (CCCC), which commenced construction works in mid-2015.

 
Halafu hio hio article inasema kwamba construction of Lamu port started in 2015. Kuna ng'ombe from TZ sitaki kuitaja jina huwa nasikia ikisema ati construction of Lamu port started in 2012. I think 2015 was site mobilisation then 2016 is when construction started in earnest.




Construction of the first three berths of the planned 32-berth Lamu Port, has been completed at a cost of about Sh40 billion, having been developed by China Communication Construction Company (CCCC), which commenced construction works in mid-2015.

hata mie naijua ile ng'ambe inabishiwa na ng'ombe nyingine kutoka Kenya! Uzuri wa ng'ombe ya Tanzania ina evidence mpaka picha za ujenzi wa Lamu ulianza lini! Mimi na-support evidence wa ng'omba ya Tanzania!

Alitoa evidence kama hii!

Lamu port project launched for South Sudan and Ethiopia​

Published2 March 2012
Share
Residents and environmental activists participate in a demonstration against the construction of the proposed Lamu port on Lamu Island, Kenya, 1 March 2012


IMAGE COPYRIGHTREUTERS
image captionThere have been protests against the port by some environmentalists and residents of Lamu island

Construction has begun on a $23bn (£14.5bn) port project and oil refinery in south-eastern Kenya's coastal Lamu region near war-torn Somalia's border.

An oil pipeline, railway and motorway will also be built linking Lamu to South Sudan and Ethiopia.

Newly independent South Sudan plans to use Lamu as its main oil export outlet.

A BBC reporter says security concerns for the project may explain the presence of Ethiopian and Kenyan troops in Somalia aiming to pacify the region.

'Biggest African project'​

Kenya's leader Mwai Kibaki launched the project along with his South Sudanese and Ethiopian counterparts, Salva Kiir and Meles Zenawi respectively.

"I have no doubt that this day will go down in history as one of the defining moments - when we made a major stride to connect our people to the many socio-economic opportunities that lie ahead," AFP news agency quotes Mr Kibaki as saying at the inauguration ceremony.

Known as Lamu Port South Sudan Ethiopia Transport Corridor (Lapsset), it is expected to be completed within four years with initial costs coming from the three governments and plans to attract international investment.

Steven Ikuwa, the administrator in charge of Lapsset, told the BBC the scale of the plans was huge.

"I am proud to say this is one of the biggest projects that we are carrying out in Africa."
The BBC's Noel Mwakugu in Lamu says there are worries about the impact of the project on Lamu district, which is one of East Africa's most beautiful and relatively unspoiled environments along the Indian Ocean and includes a cultural heritage site on Lamu Island.
"Lamu is a living heritage. Already Unesco has declared Lamu a World Heritage Site - as an endangered site," Mualimu Badi from the Save Lamu group told the BBC.
"If 500,000 people come to work as workers, we stand to lose that status."

Mr Badi also said local residents fear they would be made homeless by the project as most people in the area are unable to prove their right to live in their homes.

In response to these complaints, Mr Kibaki has announced that residents will be issued with land title deeds and his administration will provide training for 1,000 young people to prepare for future opportunities presented by the port.

Oil export alternatives​

Our correspondent says Lamu's 32-berth port will be five times larger than Kenya's only other Indian Ocean port, Mombasa - which has been struggling to serve the needs of landlocked countries to the south and west of Kenya.

Fisherman seated at a moor in Kenya's resort island of Lamu, 28 February 2012
IMAGE COPYRIGHTAFP
image captionTourism plays a large part in the local economy around Lamu

Lamu will allow Kenya to earn more revenue from its northern landlocked neighbours, he says.

Ethiopia will have an alternative sea port to Djibouti and another export route if oil is discovered in its Ogaden region, which borders Somalia and where oil exploration is currently under way.

For South Sudan, it offers a solution to its dependence on Sudan from which it split last July - six years after the end of a bitter civil war.

Since the secession, the two countries have been embroiled in a dispute over oil, with South Sudan turning off the tap on its oil exports though Sudan.

Our reporter says the project will also open up development to northern parts of Kenya, which has been neglected since independence from the UK in 1963.

The north-east of Kenya also hosts the world's largest refugee camp, Dadaab, home to more than 450,000 Somalis who have fled conflict and famine during the past 21 years.

Kenya sent in troops over its long border with Somalia in pursuit of al-Shabab militants in October, after several people, including foreign tourists, were kidnapped, including some from near Lamu.

The authorities in Kenya blame the Islamist al-Shabab group, which controls much of southern and central Somalia, for much of the instability affecting the sub-region.

Analysts say Kenya and Ethiopia, whose troops now occupy substantial parts of the country, hope that with progress on the military front, Somalia's bickering politicians can come up with a new constitution that will allow elections to be held and relative peace to return to the lawless country.

Map

 
Hizi ndo shida za nchi zetu za developing countries, Uzuri au ubaya wa serekali unategemea uzuri au ubaya wa rais wa wakati huo. Baadala ya nchi kutegemea taasisi kuhakikisha uendelezi wa mipango ya serekali, nchi inabaki kutegemea rais wa siku kwa maamuzi yote.

vile inafaa kua ni wataalam wa serekalini walio andikwa kazi permanently ndo wanafaa wawe wahakikisha maendeleo yanaendelea kwa kasi ileile na weledi ule ule hata kama rais wa siku ni nani manake hao ndo ma engineer, ma architect, ma procurement department..etc

Manake marais huja na kuenda, mawaziri huja na kuenda, lakini kuna wale waliopo hapo chini yao ambao hufanya kazi hadi kustaafu wakifika miaka 60, hao ndo wamesomea ma degree na ndo wataalam wa kazi zao, hao ndo watu amabo wanafanya kazi halisi ya serekali..
--------------------------------------------------------
Unachosema ni kweli ila mzee kwa Africa kupata wafanyikazi waadilifu bado sana ndio maana nasema hivyo kama Kenya mitreni mlioletewa sio kabisa hususan ya abiria
 
Unachosema ni kweli ila mzee kwa Africa kupata wafanyikazi waadilifu bado sana ndio maana nasema hivyo kama Kenya mitreni mlioletewa sio kabisa hususan ya abiria
Treni zetu zinapiga kazi bila mchezo. Wewe bakia hapo ukilia.
 