Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

huko ndo kuchanganyikiwa
Zilete zenu ukimaliza kufanya hesabu na za kwetu..
images.jpeg-52.jpg
images.jpeg-53.jpg
 
Iko Ruvu hapo kuna a huge dry port ambapo lorries zitakuwa zinachukulia mizigo yote hazitaruhusiwa kuingia mjini
Huo sasa ni unyanyasaji, sasa wakulipia huo usafuri mpka ruvu atakua nani..
Serekali au mwnywe mzigo, manake km sisi hata km kuna vile tumekosa lkn miundombinu kw aji ya lorries bandarini ipo
 
Kwhyo entrance na floors wapi na wapi tena, alafu security systems zenu mlangano hazifiki tano aisee..

Yani mumeliwa kusimama km mbwa koko vile
How do u talk of security system while the terminal has not started working?
 



ECONOMY
Tanzania to get new SGR electric trains November
MONDAY JULY 19 2021

Tanzanian government officials inspect SGR works. FILE


By THE CITIZEN
More by this Author
SUMMARY
Arrival of the locomotives, which are Tanzania's first electric trains, means that the country can soon start operating the Dar es Salaam-Morogoro section of the Standard Gauge Railway (SGR).
This is according to Works and Transport Minister Dr Leonard Chamuriho, who spoke this week after overseeing signing of the contract between TRC and Hyundai Rotem.

The Tanzania Railways Corporation (TRC) has said it will receive the first batch of the 42 electric trains it had ordered by November this year.

Arrival of the locomotives, which are Tanzania's first electric trains, means that the country can soon start operating the Dar es Salaam-Morogoro section of the Standard Gauge Railway (SGR).

This is according to Works and Transport Minister Dr Leonard Chamuriho, who spoke this week after overseeing signing of the contract between TRC and Hyundai Rotem.

“Earlier, we procured 42 electric locomotives from Germany and South Korea. Once they arrive in November, testing of the SGR section from Dar es Salaam to Morogoro will commence,” he said.

Mr Kadogosa said the contractor would train Tanzanian engineers on how to operate the SGR trains.

“In every contract that we have signed so far, there is a component that compels the teaching of local experts on maintenance, signals and driving. We want more local engineers to be competent in all the aspects,” he said.

Construction of the Dar es Salaam-Morogoro section of the SGR is 92.7 per cent complete.

The deal with Hyundai follows Tanzania's plan to modernise its railroads after injecting $6.9 billion into upgrading its old rail system, which forced trains to be driven at slow speeds of between 30 to 40 kilometres per hour.

However, the new rail mean that electric locomotives can run at maximum speeds of up to 160 kilometres per hour.

 
Yaani we acha tu!

A simple break down btn the cost of electrical SGR Tanzania and diesel SGR Kenya!

chukua: $3.1 bln + $0.3 bln (cost ya electric trains + locomotives) + $0.06 bln (cost of EMU) + $0.035 bln (Dar-Moro Transmission line) = $3.51 bln

Change inayobaki: $4.3 bln (diesel SGR Kenya) - $3.51 bln (electrical SGR Tanzania) = $ 0.79 bln

yaani balance ni around $800 mln for electrical SGR Tanzania!
A general SGR cost comparison reminder!!
 