SGR Ethiopia one and a half years later.

SGR Ethiopia one and a half years later.

YoungD

JF-Expert Member
Joined
Dec 27, 2016
Posts
1,275
Reaction score
1,332
We all know/have heard how the ET SGR was cost effectively constructed as compared to the Kenyan SGR.
After one and a half years operation lets see how it has been doing.

1. The passenger train has transported 167,722 pax 😱 🤣😱 and 1,248 freight trains .
2. 1 derailment(cargo train)
3. Numerous small accidents involving animals(mostly) on level crossings.
4. Capacity 11million tonnes/year. Achieved so far 1.7million tonnes.
5. Inconsistent power supply. trains have stalled for upto 8hrs on the line.
7. Theft of railway infrastructure. this is just unbelievable! unless this is just plain sabotage.
8. Max speed currently at 60kph.

IMG_20190822_195754_103.JPG


IMG_20190822_195827_423.JPG
 
So mnaamini TANZANIA tutakuwa kama ETHIOPIA kisa mjenzi wetu ni Yappi?
 
Wahabeshi wamesusa,jamaa wanamaisha magumu sana pitia per capita income yao ndio utaelewa
 
3. Inawaadhiri Sana vile wafugaji walio karibu na Reli wanawagongesha mifugo yao maksudi ili wapate fidia.
 
this derailment costed the Ethiopian government USD 10 million and closed off the railway line for 4weeks.
Btw hizo embankment na slope gradient hazina tofauti na SGR TZ. pia hawajafence reli kwahivyo treni zinagonga wanyama Mara nyingi sana na kusababisha delays.


IMG_20190822_202124_138.JPG
 
this derailment costed the Ethiopian government USD 10 million and closed off the railway line for 4weeks.
Btw hizo embankment na slope gradient hazina tofauti na SGR TZ. pia hawajafence reli kwahivyo treni zinagonga wanyama Mara nyingi sana na kusababisha delays.
View attachment 1187801

Sasa mbona umeitaja TZ...???..tz inahusika vp na mikebe yenu ya kuhifadhia githeri...
 
Kama Ethiopia wana inconsistent power supply na Wana almost 6000megawats
basi sgr Tanzania kama kweli ni electric ita stall siku ya kwanza.
 
Kama Ethiopia wana inconsistent power supply na Wana almost 6000megawats
basi sgr Tanzania kama kweli ni electric ita stall siku ya kwanza.
Utasubiri sana...shida sio kua na megawatts nyingi...tunakiasi kinachohitajika kuendesha treni za kutumia nishati ya umeme ....mnaumia kwakua mlifail kupanga yenu
 
this derailment costed the Ethiopian government USD 10 million and closed off the railway line for 4weeks.
Btw hizo embankment na slope gradient hazina tofauti na SGR TZ. pia hawajafence reli kwahivyo treni zinagonga wanyama Mara nyingi sana na kusababisha delays.
View attachment 1187801

Lengo lako lishajulikana sasa post yangu no 1 ishafanya kazi.
 
Utasubiri sana...shida sio kua na megawatts nyingi...tunakiasi kinachohitajika kuendesha treni za kutumia nishati ya umeme ....mnaumia kwakua mlifail kupanga yenu
Wacha tungoje tuone.
 
Ethiopia kuna vituko, hii hapa chini inaitwa Modjo dry port!

IMG_20190822_223152_471.JPG


the level of incompetence is appalling.
 
Tatizo ni kujitutumua kuweka ya umeme bila kuzingatia mengine, bora ujenge kama tulivyofanya Kenya, uwekeze kwenye kuifanya iwe thabiti, kisha siku za usoni ndio uwaze mambo ya umeme.
 