Tony254
JF-Expert Member
- May 11, 2017
- 16,017
- 16,431
Ujenzi wa daraja hili utaanza mwezi wa Juni mwaka huu. Kuwa na subira. Subira huvuta heri.Weka comment basi kuhusu huu ujenzi. Comment yako ni muhimu mno.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Ujenzi wa daraja hili utaanza mwezi wa Juni mwaka huu. Kuwa na subira. Subira huvuta heri.Weka comment basi kuhusu huu ujenzi. Comment yako ni muhimu mno.
Design imebadilika. Kwani wewe uko nyuma namna gani? Hujui Mombasa gate bridge itakuwa cable-stayed bridge na kwanza itakuwa the tallest cable stayed bridge in Africa maana its tallest mast itakuwa 70 metres ili kuruhusu meli kubwa ya post-panamax kupita chini na magari kupita juu.Tony tunaomba uongelee hiki kituko cha karne tafadhali [emoji116][emoji116][emoji3][emoji3]View attachment 1676496View attachment 1676497
2017-2021 mnapiga mdomo tuLikoni traffic set to ease as Sh82bn bridge construction starts in April
The Likoni ferry crossing channel. /ELKANA JACOB
The construction of a Sh82 billion bridge on the Likoni channel is expected to commence in April.
The national and county government of Mombasa on Thursday began the Environmental and Social Impact Assessment of the proposed Mombasa Gate Bridge Project.
The 1.4 kilometre bridge will Mombasa island and the Mombasa South mainland, which will ease traffic at the ferry crossing.
On average, some 300,000 people and 6,000 vehicles cross the channel daily.
The project’s managing consultant Michael Mwangi said additional ferries at the Likoni channel is not the solution to the congestion experienced there.
In fact, Mwangi said, additional ferries only serve to increase the risk of accidents at the channel.
Already, there are six ferries operating across the Likoni (five) and Mtongwe (one) channels.
Read: Ferrying of Motorists at Likoni, Mtongwe suspended after overflow of water
The government plans to add another ferry but an ongoing court case over the matter has temporarily halted this.
On Thursday, Mwangi told stakeholders in Mombasa the project is jointly funded by the Kenyan and Japanese governments, through JICA.
According to preliminary results of the ingoing feasibility study, the proposed bridge will start at the King’orani prison (Jela Baridi) along Lumumba Road, then pass over the Railway station, over Moi Avenue, over Archbishop Macarius Road, Liwatoni, until the Likoni channel.
On the mainland side, the bridge will pass over Jamvi la Wageni area, from which it will start to dip after 500 metres, to across the Mtongwe road and to Ziwani area where it will join the Mombasa Southern Bypass.
“Construction of the bridge at the Likoni channel is complicated because big ships pass through the channel. This means the bridge must be heightened. This means the bridge must start from very far,” said Mwangi.
The highest point of the bridge, above the sea, will be 69 meters tall (almost the size of a 21-storey building).
“The bridge will be used by all vehicles except tuktuks and bicycles,” said Mwangi.
“This is because the bridge will be so high that there will be a lot of wind, which might cause accidents,” he explained.
Mwangi said the bridge complex will be around 3.5 kilometres.
“But including all the support and feeder roads, the total distance of the road network to be constructed alongside the bridge will be like 10km,” said Mwangi.
Construction of the bridge will not affect the ferry services at Likoni and Mtongwe crossing channels.
Although it is too early to get the exact estimate of the cost, Mwangi said roughly at least Sh82 billion will be needed for the project.
This amount includes compensation money for all who will be affected by the project.
Mombasa county lands executive Edward Nyale said the relocation process of those who will be affected will be done smoothly and in a well thought out manner.
“Already, there is an interdepartmental committee that has been formed to handle that matter,” said Nyale.
He said a lot of support infrastructure will be needed to compliment the bridge.
He said the construction of the bridge is also part of the Mombasa county master plan.
Transport department chief officer Albert Keno, who is an engineer, said all those who will be affected by the construction of the bridge will be adequately compensated.
“It is too early to estimate the number of people who will be affected. We will however know this after March 2018,” said Keno.
The actual construction of the bridge is expected to begin in April 2018 and will take about 4 years to complete.
TunasubiriUjenzi wa daraja hili utaanza mwezi wa Juni mwaka huu. Kuwa na subira. Subira huvuta heri.
😆😆😆😆Iko wapi?Aki ya nani, hii ndio showstopper...
Prophecy materilised!Do not trust Kenyans, the world knows how untrusted they are, with a budget of $82 can't build any brigde of that magnitude, Ubungo interchange alone costs $90m, these people are mentally sick
Siku mkijenga iyo kitu nitag [emoji3][emoji3][emoji3][emoji3][emoji3]Design imebadilika. Kwani wewe uko nyuma namna gani? Hujui Mombasa gate bridge itakuwa cable-stayed bridge na kwanza itakuwa the tallest cable stayed bridge in Africa maana its tallest mast itakuwa 70 metres ili kuruhusu meli kubwa ya post-panamax kupita chini na magari kupita juu.
Cc Geza Ulole
[emoji3][emoji3][emoji3][emoji3][emoji3][emoji3][emoji3][emoji38][emoji38][emoji38][emoji38]Iko wapi?
Kumbe uliishawaambia, kiukweli Wakenya wameanza kuogopa elimu yetu[emoji116][emoji116][emoji3][emoji3][emoji3][emoji3][emoji3][emoji3][emoji3]It is a day light dream my friend, with budget of $82M, you can only afford to build a pedestrians bridge
Iko wapi hiyo ya Mombasa [emoji3][emoji3][emoji117][emoji117][emoji205][emoji205][emoji90][emoji90][emoji90]Is it as tall as the Mombasa one???...give us details
Itaendelea kuwa render [emoji3][emoji3][emoji117][emoji117][emoji205][emoji205][emoji90][emoji90]View attachment 646211 View attachment 646212 Here is the render and what the final product should look like
.... cable cars will also be cruising above de bridge..The Likoni bridge is 70 metres tall in the sky,remember,cable cars will also be cruising above the bridge at a height of 100 metres. The taller the tower, the sweeter the view!
Hio salender and Kigamboni ni daraja za kutupwa!
Cable cars zitaanzia nchi inayoleta mambo ya ulaya EA[emoji116][emoji116][emoji3][emoji3][emoji117][emoji117][emoji205][emoji205][emoji90][emoji90].... cable cars will also be cruising above de bridge..
[emoji23][emoji1787]
Wakenya buana
[emoji16][emoji16][emoji16]hawa jamaa wanajua sana kujiua na mikono yao wenyewe,this was unneccessary[emoji1][emoji1][emoji1]ila mikogo imewazalisha maboga.Cable cars zitaanzia nchi inayoleta mambo ya ulaya EA[emoji116][emoji116][emoji3][emoji3][emoji117][emoji117][emoji205][emoji205][emoji90][emoji90]View attachment 1676900
Sent using Jamii Forums mobile app
Any progressUjenzi wa daraja hili utaanza mwezi wa Juni mwaka huu. Kuwa na subira. Subira huvuta heri.
Any progress
It looks like all the financial instruments have been finalized & construction over the troubled Likoni channel is about to start.
View attachment 1285973
LIKKKONI by Rico Mwash, on Flickr
LIK3by Rico Mwash, on Flickr
![]()
Nimerudi 4 years after, any progress? Ian CruzWill start in April n EIA not done while financing not explained! I will be back in here [emoji23] [emoji115] !
Lilianza hapa
Mara story ikabadilika ikaja ya cable
likaishia hapa
Iko wapi [emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787][emoji1787]Aki ya nani, hii ndio showstopper.