Cost comparison SGR Kenya vs SGR Tanzania

Cost comparison SGR Kenya vs SGR Tanzania

Wewe mkunya juha leta evidence kwamba kila mmoja ana distribution lines zake!
Evidence itapata tu usijali, sahii Niko safarini. I have never ran away from backing up my comments with facts. But tatizo lenu tunalijua, the moment ushahidi utaanza kumwagwa hapa mtageuza story na kuanza kusema data zimepikwa sijui unataka picha ya kila nyaya ya transmission line ... Etc

Anyway, Kentraco mainly deals with evacuating high voltage power from power plant to Kenya power's substations , Lakini Kenya power KPLC pia hua iko na high voltage transmission lines zake ambazo Wana link one substation to another. Ngoja nikifika niendako ntakuletea combined high voltage lines za Kenya, trust meme,
 
Evidence itapata tu usijali, sahii Niko safarini. I have never ran away from backing up my comments with facts. But tatizo lenu tunalijua, the moment ushahidi utaanza kumwagwa hapa mtageuza story na kuanza kusema data zimepikwa sijui unataka picha ya kila nyaya ya transmission line ... Etc

Anyway, Kentraco mainly deals with evacuating high voltage power from power plant to Kenya power's substations , Lakini Kenya power KPLC pia hua iko na high voltage transmission lines zake ambazo Wana link one substation to another. Ngoja nikifika niendako ntakuletea combined high voltage lines za Kenya, trust meme,
mwenzio Tony254 kanyamaza kwa vile anajua unadanganya Kengen haishiriki kwenye power distribution! Nangoja evidence with the number of km of power transmission!
 
Geza wacha jokes saa zingine. Sio kila wakati ni wakati wa jokes. Sasa huoni kuna tofauti kubwa kati ya hio rig mkebe uliopost
2796175_HOTUBA_WAZIRI_WA_NISHATI_MWAKA_2021_22_-_Final_Draft2_31.05.2021-107_page-0001.jpg


na hii ambayo nilipost ambayo ndio geothermal drilling rig
images (2).jpeg

Nyinyi mnaunda drilling rig ndogo pengine ya kuchimba maji ambayo kimo chake hakifiki zaidi ya 1,000 metres kuenda chini. Hio rig yenu mbovu haiwezi kuchimba geothermal. Drilling rig ya geothermal ni kubwa zaidi kwa sababu inastahili kuchimba kina cha 3,000 metres. Yaani 3 km kuenda chini. Hata kwa mtazamo tu unaweza kuona tofauti ya hizo rigs mbili.
 
Geza wacha jokes saa zingine. Sio kila wakati ni wakati wa jokes. Sasa huoni kuna tofauti kubwa kati ya hio rig mkebe uliopost
View attachment 1806720

na hii ambayo nilipost ambayo ndio geothermal drilling rig
View attachment 1806728
Nyinyi mnaunda drilling rig ndogo pengine ya kuchimba maji ambayo kimo chake hakifiki zaidi ya 1,000 metres kuenda chini. Hio rig yenu mbovu haiwezi kuchimba geothermal. Drilling rig ya geothermal ni kubwa zaidi kwa sababu inastahili kuchimba kina cha 3,000 metres. Yaani 3 km kuenda chini. Hata kwa mtazamo tu unaweza kuona tofauti ya hizo rigs mbili.
Unajua kina cha utafutaji wa mafuta? from 1 km to 6km! Again hujui kitu una-demonstrate ujuha! I should ignore u!

 
Kugenerate umeme mwingi sio kazi. Kazi ni kuutumia. Sisi tuna surplus sasa hivi na tumeshindwa kutumia umeme wote. Utakuja kunielewa mradi wenu utakapokamilika. Sasa hivi huwezi kunielewa. Uganda wana surplus, Kenya ina surplus, Ethiopia soon itakuwa na surplus kubwa sana. Sasa hio surplus yenu hakuna anayeitaka hapa Afrika Mashariki. Jengeni interconnector powerline na SADC mkauze SADC. Pengine SA atanunua.
Umeme wetu bei itakuwa chini sana investors will come calling nyinyi kaeni na surplus ya expensive thermal energy angalau hata mgekuwa na gas mgepata umeme cheap kidogo unafikiri kwanini Kenyata anataka gas pipeline to Mombasa unafikiri ni gas ya kupikia anataka?
 
Umeme wetu bei itakuwa chini sana investors will come calling nyinyi kaeni na surplus ya expensive thermal energy angalau hata mgekuwa na gas mgepata umeme cheap kidogo unafikiri kwanini Kenyata anataka gas pipeline to Mombasa unafikiri ni gas ya kupikia anataka?
punda atabaki kuwa punda mwaka kesho muda kama huu tutakuwa tunajiandaa ku-launch JNHPP!
 
Evidence itapata tu usijali, sahii Niko safarini. I have never ran away from backing up my comments with facts. But tatizo lenu tunalijua, the moment ushahidi utaanza kumwagwa hapa mtageuza story na kuanza kusema data zimepikwa sijui unataka picha ya kila nyaya ya transmission line ... Etc

Anyway, Kentraco mainly deals with evacuating high voltage power from power plant to Kenya power's substations , Lakini Kenya power KPLC pia hua iko na high voltage transmission lines zake ambazo Wana link one substation to another. Ngoja nikifika niendako ntakuletea combined high voltage lines za Kenya, trust meme,
Labda tukusaidie kidogo inaelekea hujui maana ya Ketraco na pia hujui maana ya Kplc. The former ni transmission company na the latter ni distribution company
 
Kusema kweli wewe Tony254 ni mpumbavu wa mwisho nimejaribu kuangalia vitu unavyobisha humu ndani nimegundua ubishi wako hujazwa na ego na si realities! Upo so taken na vitu vidogo kama drilling kwenye geothrmal badala ya heat energy hanessing (Heat pump) and heat to electric generating systems! Yaani upo shallow halafu mshamba! Nilitegemea ur argument ingekuwa on that area ila mpumbavu wewe unabishia kuchimba visima vya joto ardhi! Hivi unaweza kupishana na nchi yenye uwezo wa ku-drill kms deep underground na kupitisha giant equipments bulldozers and trucks and trucks?

Seriously? Get a picture of activities all around large mines across Tanzania












Wacha upumbavu aisee hiyo little achievement mliyonayo is nothing to mining countries! Uliza any engineer atakuambia si kitu cha kujisifu namna hiyo!
 
Umeme wetu bei itakuwa chini sana investors will come calling nyinyi kaeni na surplus ya expensive thermal energy angalau hata mgekuwa na gas mgepata umeme cheap kidogo unafikiri kwanini Kenyata anataka gas pipeline to Mombasa unafikiri ni gas ya kupikia anataka?
Tanzania have been having cheap electricity bill compared to Kenya all along but investors are flooding Kenya as compared to Tz. So kitu isiwadanganye kuwa hiyo dam yenu ikiisha investors will just come from nowhere. You can take example with the expansion of JNIA III, it's completion increased JNIA total capacity to around 8M instead it only serves 2M per year.
 
Unajua kina cha utafutaji wa mafuta? from 1 km to 6km! Again hujui kitu una-demonstrate ujuha! I should ignore u!

Unataka kutudanganya kwamba hio drill yenu ndogo inaweza kuchimba kilomita sita?
 
Tanzania have been having cheap electricity bill compared to Kenya all along but investors are flooding Kenya as compared to Tz. So kitu isiwadanganye kuwa hiyo dam yenu ikiisha investors will just come from nowhere. You can take example with the expansion of JNIA III, it's completion increased JNIA total capacity to around 8M instead it only serves 2M per year.
Hahaha. Good point. Wao wanadhani kwamba cheap electricity ndio kila kitu. Investors wanaangalia whether there are positive policies on the ground.
 
Unataka kutudanganya kwamba hio drill yenu ndogo inaweza kuchimba kilomita sita?
Stamico ina several drilling machines ni usenge unakusumbua kushindana na nchi ya nne kwenye mining kisa mme-drill visima vya geothermal! Wewe uchoko unakusumbua! tunachimba Helium baada ya kuchimba mamia ya visima vya natural gas!
 
Labda tukusaidie kidogo inaelekea hujui maana ya Ketraco na pia hujui maana ya Kplc. The former ni transmission company na the latter ni distribution company
KPLC ndo ilikua kama TANESCO kitambo..... in 2008 KENTRACO was formed to be the transmitting company for all new transmission networks.... All the transmission networks that existed before KENTRACO was created are and continue to remain the property of KPLC! Wajinga malazy tutaona yakimwaga povu leo, ngoja sasa hivi nikuonyeshe vile Kenya ni moto wa kuotea mbali.
 
hey, take it from me.. hakuna mlichotuzidi kwenye transmission lines .. labda power generation capacity, hii J.Nyerere HydroPower Plant yetu ndo itatupeleka mbele zaid yenu.. ila kwenye transmission lines jua hakuna mlichotuzidi hata kwa sekunde


Mko na MW kidogo kutushinda, Mko na blackouts nyingi zaidi kutushinda, Alafu akili zako zikutume uje uamini eti inawezekana mkawa na Transmission grid ndefu kutuliko 😵😵😵




Kwani what does it take ku-upgrade a 400kV to 500 kV? Hii sio sector yako punguza upumbavu! If u will take a little understanding of power formulars u will know how can the voltage be manipulated into increasing the capacity of a transmission line!

Transmission​

TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.

TANESCO’s Future Plan

TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).

Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of 220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.





Over 280 km grid connection








Picha

GOVT UPBEAT ON JNHP FUNDING

SUNDAY NEWS Reporter

10/04/2021


PRIME Minister Kassim Majaliwa on Saturday assured Tanzanians that the government will continue to provide funds for the construction of Julius Nyerere Hydropower Project (JNHP) so that it could be completed on time.

The Premier said the government will do everything in its capacity to ensure the project is completed as scheduled and as per agreed international standards.

He was speaking after a working tour at the site, where he inspected progress of the multibillion project.

The project is scheduled to be completed in June, 2022. According to Mr Majaliwa, everything is set to ensure smooth continuous funding of the project.

“I would like to ensure the public that the government is committed and focused to continue funding this strategic project, which is designed to bring both social and economic changes to all Tanzanians,” said the Premier.

Mr Majaliwa said the project is expected to generate 2115MW and lower costs among wananchi.

“Currently Tanzania generates 1,500MW from other sources, with the additional 2115Mw from JNHP, the country will be able to export excess electricity to neighbouring countries,” he said.

He expressed his satisfaction with the progress in the implementation of the project, saying taxpayers’ money is being used properly.

“I am satisfied with the good job under Arab Contractors and Elsewedy Electric companies, all from Egypt. The good performance has so far been recorded under good supervision of Tanzania Electric Supply Company Limited (TANESCO), Tanzania National Roads Agency (TANROADS) and the Ministry of Energy,” noted Mr Majaliwa.

He said the government invested in the project knowing clearly that hydropower projects are cheaper compared to other sources of electricity.

The Premier said generating one unit from hydropower project costs between 36/- and 50/-, while electricity that is generated from other sources such as oil costs between 440/- and 600/- per unit.

“We therefore focused on hydropower because it is cheaper compared to other sources, and this will enable the government to reduce cost of electricity which is supplied to Tanzanians,” he noted.

Moreover, Mr Majaliwa said the project has also helped to generate employment to Tanzanians who are involved in the construction.

He said some Tanzanians supply construction materials, fuel, food and other services that are required at the site. The Premier revealed that TANESCO has already announced the tender for construction of a main power transmission line from JNHP to Chalinze in Coast region.

He said from Chalinze, other two lines will be constructed towards Dodoma and Dar es Salaam to enable supply of power to all regions in the country. Mr Majaliwa has also ordered the Ministry of Energy to identify all challenges that may lead to any delay of the completion of the project and make sure they are resolved.

"I am also asking wananchi who live along the project area to cooperate with contractors and all workers in this project by assuring them security and protection for their properties, including the machines,” he said.

Earlier, Deputy Minister for Energy, Mr Stephen Byabato said the government has so far provided over 2tri/- for the implementation of the project. Upon completion, the project is expected to cost 6.5tri/.





Hapo panasema "TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019."
------------------------------------------------

Hapo ondoa hio 543Km of 66KV kwenye hesabu za Transmission lines, 66kV and below should be considered part of the distribution network. 132kV and above is what is considered a true transmission line

1622757509143.png



So Tanzania has 5,353 Km of transmission lines as of Dec 2019.



1622758720562.png


KPLC still owns a majority of the transmission lines above 132kV , Kentracos network is only 37.5% of all the National Transmission lines, but this wont last long, KENTRACO has 23 active projects U/C

1622759021741.png






When those projects are complete, The will add 6,679 KM of Transmission lines in Kenya, So its only Tz that has future plans, you are not about to catch up anytime soon, you make 3 steps and before you take anotherone Kenya is 7 steps ahead of you!!!

Ongoing projects!
1622759279536.png
 
Mko na MW kidogo kutushinda, Mko na blackouts nyingi zaidi kutushinda, Alafu akili zako zikutume uje uamini eti inawezekana mkawa na Transmission grid ndefu kutuliko 😵😵😵








Hapo panasema "TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019."
------------------------------------------------

Hapo ondoa hio 543Km of 66KV kwenye hesabu za Transmission lines, 66kV and below should be considered part of the distribution network. 132kV and above is what is considered a true transmission line

View attachment 1806955


So Tanzania has 5,353 Km of transmission lines as of Dec 2019.



View attachment 1806977

KPLC still owns a majority of the transmission lines above 132kV , Kentracos network is only 37.5% of all the National Transmission lines, but this wont last long, KENTRACO has 23 active projects U/C

View attachment 1806980





When those projects are complete, The will add 6,679 KM of Transmission lines in Kenya, So its only Tz that has future plans, you are not about to catch up anytime soon, you make 3 steps and before you take anotherone Kenya is 7 steps ahead of you!!!

Ongoing projects!
View attachment 1806987
ati Kunyaland ina reliable power kutushinda?
 
Mko na MW kidogo kutushinda, Mko na blackouts nyingi zaidi kutushinda, Alafu akili zako zikutume uje uamini eti inawezekana mkawa na Transmission grid ndefu kutuliko 😵😵😵








Hapo panasema "TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019."
------------------------------------------------

Hapo ondoa hio 543Km of 66KV kwenye hesabu za Transmission lines, 66kV and below should be considered part of the distribution network. 132kV and above is what is considered a true transmission line

View attachment 1806955


So Tanzania has 5,353 Km of transmission lines as of Dec 2019.



View attachment 1806977

KPLC still owns a majority of the transmission lines above 132kV , Kentracos network is only 37.5% of all the National Transmission lines, but this wont last long, KENTRACO has 23 active projects U/C

View attachment 1806980





When those projects are complete, The will add 6,679 KM of Transmission lines in Kenya, So its only Tz that has future plans, you are not about to catch up anytime soon, you make 3 steps and before you take anotherone Kenya is 7 steps ahead of you!!!

Ongoing projects!
View attachment 1806987
now show me the 6000 km being constructed!

as for me i gave links yesterday! And why r u showing only Ketraco where is Kenpower u yapped has transmission lines?
 