Ni kweli Urusi Taifa Teule ina maarifa kubwa jinsi ya kuona manowari zake zinazamishwa. Kuanzia Tushima (hapo walifyekwa na Japani ona
Battle of Tsushima), kupigwa kwenye Bahari Baltiki na kushindwa kutoka kwenye Bahari Nyeusi wakati wa Vita Kuu ya Kwanza; kurudia mchezo huohuo wakati wa Vita Kuu ya Pili, Putin amejitahidi kutengeneza uwingi wa kuti aliorithi kutoka Urusi wa kikomunisti. Hata hivyo, manowari kiongozi ni Admiral Kusnetsov ambayo ingefaa kuwa makumbusho ya kijeshi katika nchi nyingine (soma china hatma yake), na manowari kiongozi kwenye Bahari Nyeusi ilikuwa Moskva, tunajua habari zake jinsi ilivyopotea kwa sababu kamanda yake alisahau haongozi nyambizi....
Kuhusu manowari kiongozi ona hapa:
As of July 2021,
Admiral Kuznetsov is out of service for a refit in
Murmansk. In November 2018, it was damaged by a falling 70-ton crane from the
floating dry dock PD-50 and a fire that killed two during the refit. The dry dock, which sank due to a power outage while holding
Admiral Kuznetsov,
[10] was vital to repairing the carrier,
[11] which is not expected to re-enter service until 2022 at the earliest.
[12] In 2021, the Vice President of the
United Shipbuilding Corporation (USC), Vladimir Korolev, told the TASS news agency that the vessel was expected to begin post-repair sea trials in mid-2023 and rejoin the fleet later that year,
[13] although this may have been pushed back a year or more due to delays.
[14] In May 2022 it was reported that repairs to the vessel were scheduled for completion in Murmansk in September 2022
[15] but after flaws were found in the work, the date for the return to service was pushed back to at least 2024.
[16]
As of July 2021,
Admiral Kuznetsov is out of service for a refit in
Murmansk. In November 2018, it was damaged by a falling 70-ton crane from the
floating dry dock PD-50 and a fire that killed two during the refit. The dry dock, which sank due to a power outage while holding
Admiral Kuznetsov,
[10] was vital to repairing the carrier,
[11] which is not expected to re-enter service until 2022 at the earliest.
[12] In 2021, the Vice President of the
United Shipbuilding Corporation (USC), Vladimir Korolev, told the TASS news agency that the vessel was expected to begin post-repair sea trials in mid-2023 and rejoin the fleet later that year,
[13] although this may have been pushed back a year or more due to delays.
[14] In May 2022 it was reported that repairs to the vessel were scheduled for completion in Murmansk in September 2022
[15] but after flaws were found in the work, the date for the return to service was pushed back to at least 2024.
[16]
(Vyanzo unaweza kuangalia ukifungua makala katika wikipedia ya kiingereza..)